100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

LOG-2150 Introduction-to-Technical Data Management Module 2 Exam

Puntuación
-
Vendido
-
Páginas
3
Grado
A+
Subido en
07-01-2025
Escrito en
2024/2025

LOG-2150-Introduction-to-Technical-Data-Management-Module-2-Exam Answered. What three items must the Integrated Product Team (IPT) data call participants base their technical data requirements on? Life cycle phase of the program Purpose of the contract Program Management Strategy documents () Price of the contract What type of improper marking is a noncommercial technical drawing with the marking of ‘Company Confidential'? O Export Control O Unjustified Nonconforming O Distribution Statement Who places the data rights markings on the noncommercial technical data? O The Government Contracting Officer (O Both the Contractor and the Government Program Office () The Government Program Office The Contractor Which individual performs inspections, acceptance, and storage of data? O Product Support Manager (PM) (O Contracting officer @® Data Manager (O Subject Matter Expert (SME) What three documents should the Subject Matter Experts (SME) review to start determining the technical data needed for the acquisition program in Step 1 of the High-Level Contract Data Requirements List (CDRL) Planning Tool? [ Program Protection Plan Life Cycle Sustainment Plan System Engineering Plan Acquisition Strategy What are three Data Requirements Review Board (DRRB)-recommended activities? O Require the contractor to use Government format. Consider whether red-line updates will suffice. Balance among competing program objectives. Use preliminary or informal data to meet initial needs. Which two steps must occur before the Integrated Product Team (IPT) data call? Subject Matter Expert (SME) review of the program'’s strategy documents (] Data Item Descriptions (DID) selection and tailoring Completing a Work Breakdown Structure (WBS) to a Level 3 (] Data Requirements Review Board (DRRB) meeting The Subject Matter Experts (SME) on the Integrated Product Team (IPT) will review requirement and acquisition documentation to determine which three of the following? For what purpose technical data is needed (L) where technical data will come from What technical data is necessary How long the technical data is needed In Step 2 of the High-Level Contract Data Requirements List (CDRL) Planning Tool Process, the Government engineering team will develop the Work Breakdown Structure (WBS) elements of the weapon system to which level? O s O 1 O 2 3 During which step of the High-Level Contract Data Requirements List (CDRL) Planning Tool Process do the Program Management Office (PMO)/Integrated Product Team (IPT) members review all the data markings for each technical data delivered by the CDRL? @® 7 Oe O 4 Os Which individual is in charge of ensuring the necessary and proper technical data is procured? (O Contracting officer O Subject Matter Experts (SME) Product Support Manager (PSM) (O Data Manager What are three things that the Data Requirements Review Board (DRRB) ensures? (] ANl Data Item Descriptions (DID) referenced are unique, program-specific, and approved by the Data Requirements Review Board (DRRB). Data requirements are clearly stated in the Statement of Work (SOW)/Performance Work Statement (PWS). Intended users agree with technical data requirements of the proposed procurement. Approval requirements, delivery dates, and deferred delivery of technical data are reasonable, consistent with the program schedule, and properly specified. What is used to tailor a Data Item Description (DID)? O statement of Work (SOW) Exhibit A O The Acquisition Streamlining and Standardization Information System (ASSIST) database (O The Work Breakdown Structure (WBS) Contract Data Requirements List (CDRL) Block 16 The Work Breakdown Structure (WBS) performs which three of the following functions? Segregates a defense materiel item into its common parts Clarifies the tasks to be completed to each defense materiel item part and the end item or weapon system Clarifies the relationship of a defense materiel item’s parts [ Obtains necessary and proper technical data

Mostrar más Leer menos
Institución
Grado








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
7 de enero de 2025
Número de páginas
3
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

What Technical-Associated Information data is provided during Technology Maturation and Risk Reduction (TMRR) phase? (Select two.)

Configuration Control initial report
() Final engineering drawings
Developmental Test Reports
[ Final computer software manuals
What are two benefits with cloud storage of technical data?

() No cost to store technical data in a cloud database
Enables innovation
Physical housing of technical data is becoming obsolete and very expensive
() No risk to store technical data in a cloud database

For Rapid Fielding, what type of technical data would be required?

O Research and Development technical data
(O Applied research
@® Technical data that would require minimal development
O Basic research
What is Performance-Based Logistics (PBL) based on that can reduce the need for technical/logistics data?

@® Outcomes and not outputs
O Inputs and outputs
O Outputs and not outcomes
O Outcomes and outputs
What are two requirement information documents are needed for the Materiel Solution Analysis (MSA) phase?

Draft Capabilities Development Document (CDD)
() Intellectual Property (IP) Strategy
(] Life Cycle Sustainment Plan (LCSP)
Initial Capabilities Document (ICD)

What does rapid development necessitate in terms of the technical data approach?

OA rigid technical data approach which locks down system and product support configurations early in the design process
OA hybrid technical data approach which locks down as many elements as possible as early as possible
@® A flexible technical data approach which does not lock down system and product support configurations
(O Ahands-off technical data approach which acknowledges that there is no way to lock down system and product support when using rapid development
$10.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Topscorer london
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
116
Miembro desde
5 año
Número de seguidores
13
Documentos
454
Última venta
1 día hace
Top Scorer

Helping all Students fulfill their educational, career and personal goals.

4.3

24 reseñas

5
16
4
3
3
3
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes