Construction Documents Final Exam
questions with complete solutions

Schematic, preliminary, and working drawings are the three stages of drawings. - correct answer
✔✔True



The preliminary drawings are the first graphic representation of the owners' needs. - correct answer
✔✔False



Civil drawings encompass all the work that pertains to a project other than the structure itself. - correct
answer ✔✔True



Civil drawings use the architect's scale for measuring. - correct answer ✔✔False



One of the architect's tools used for communicating a project/structure is the plan view and the most
common type of plan view is the floor plan. - correct answer ✔✔True



Exterior elevations provide an interior view of the exterior wall. - correct answer ✔✔False



A building section is a vertical slice through a particular part of the building. - correct answer ✔✔True



Structural drawings provide a view of the structural members that will support loads and transmit loads
to the ground. - correct answer ✔✔True



Mechanical drawings show the electrical and communication system of the building. - correct answer
✔✔False



Addenda are written amendments, modifications, revisions corrections, and explanations issued by the
architect/engineer during the process. - correct answer ✔✔True

, The most widely accepted system for arranging construction specifications is the CSI MasterFormat -
correct answer ✔✔True



The CSI MasterFormat categorizes the information presented in the specification into THREE categories. -
correct answer ✔✔True



The invitation for bid, request for proposals, or advertisement for bids are all part of the 'General
Conditions.' - correct answer ✔✔False



The 'Contract Forms' section deals with forms needed for both bidding and award. - correct answer
✔✔True



Each bidder is allowed to submit his/her bid on a different type of forms for a particular project. - correct
answer ✔✔False



The 'General Conditions' are set of rules and regulations on which the contract is based. - correct answer
✔✔True



Any changes to the contract documents during the bidding phase are called 'Alternates.' - correct answer
✔✔True



When the drawings and specifications differ as to the quality of a particular product, the standard rule of
thumb is that the product of higher quality is expected. - correct answer ✔✔True



CMUs are used for several purposes including interior load-bearing walls, exterior load-bearing walls,
and as backup for brick veneer walls. - correct answer ✔✔True



Mortar is classified by 'type.' - correct answer ✔✔True



The difference between the actual and nominal size of a brick/CMU is made up by the thickness of the
mortar joint. - correct answer ✔✔True

Información del documento

Subido en
7 de diciembre de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
7Eleven
4.0
(122)
Vendido
325
Seguidores
209
Artículos
17912
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes