100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

3rd class stationary steam engineer license prep

Puntuación
-
Vendido
-
Páginas
15
Grado
A+
Subido en
04-12-2024
Escrito en
2024/2025

3rd class stationary steam engineer license prep

Institución
3rd Class Stationary Steam Engineer License Prep
Grado
3rd class stationary steam engineer license prep









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
3rd class stationary steam engineer license prep
Grado
3rd class stationary steam engineer license prep

Información del documento

Subido en
4 de diciembre de 2024
Número de páginas
15
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

3rd class stationary steam engineer
license prep Questions And Answers
_________ are necessary for complete combustion - -time, temperature,
mixture, and atomization

-if the steam pressure gauge indicates 200 PSIG, the absolute pressure
is______ - -214.7

-a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and
closes at 398 PSI. The blowdown is______psi - -12

-an oil cooler is commonly used with a(n) ________ when operating in
conjunction with a turbo-generator - -steam turbine

-a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a
steam temperature of 500 degrees Fahrenheit. The steam produced is
_______ steam - -superheated

-the economizer on a boiler is used to _______ - -add heat to the feed water

-blowers are normally used with________ boilers - -water tube

-overheating of tubes on a boiler can be caused by________ - -scale on tubes

-carbon dioxide in a condensate return system causes_________ - -channeling

-a ________ pump is a positive displacement pump - -reciprocating

-a boiler generating 6000 lb of steam/hr produces _______btu/hr - -6,000,000

-a bottom blowdown is performed on a boiler to _____ - -discharge sludge and
sediment

-water columns are connected to the boiler with a minimum of _______" pipe -
-1

-the minimum size of a water column blowdown valve is_______". - -3/4

-the maximum size bottom blowdown valve on a boiler is_________". - -2 1/2

-a ________ allows condensate to pass through, but stops Steam. - -a steam
trap

, -when taking over a shift, the first thing to do is check the________ - -water
level in each boiler

-according to the asme code, a high-pressure boiler having more than 500
square feet of heating surface shall have________ - -two or more safety valves

-the probable cause of an increase in temperature of gases of combustion at
the boiler Outlet is____ - -dirty heating services

-boilers in battery equipped with________ must have two main steam stop
valves and a free-flowing drain between them - -manhole openings

-in order to be sure the gauge glass is indicating an accurate water level
reading, the stationary engineer should______ - -blowdown the gauge glass

-a continuous blowdown line is located___ - -in the Steam and water drum
well below the nowl

-a temperature reading of 80 degrees Celsius is equal to_________°f - -176

-a chimney temperature of 250 degrees Fahrenheit above steam
temperature indicates_______ - -poor efficiency

-a manometer is red in________ - -inches of water

-the boiling point of water will____ with an increase in pressure - -be raised

-if a lather is not obtained when performing a soap hardness test, the water
sample is_______ - -hard

-combustion efficiency can be increased when air is________ - -preheated

-______ draft is produced by a fan located between the boiler and the
chimney - -induced

-the overspeed trip on a steam turbine should be tested ______ - -before
putting the steam turbine on-line

-a high CO2 reading in the gases of combustion is a sign of____ - -High
combustion efficiency

-the purpose of chemically treating feedwater is to________ - -turn scale-
forming salts to a non adhering sludge
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
juddykingori

Conoce al vendedor

Seller avatar
juddykingori EXAMS
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
1 año
Número de seguidores
0
Documentos
33
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes