CDC 2T357 Vol. 3 Solved 100% Correct
(401) Identify the Fleet Management Information System (FMIS) that is approved by the
Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics
(OUSD AT&L). - ANSWER-Defense Property Accountability System (DPAS).
(402) How many working days do you have to establish a vehicle record jacket and
Fleet
Management Information System (FMIS) Vehicle Master File after receipt of a newly
assigned vehicle? - ANSWER-5.
(402) If you cannot find the vehicle registration number on a newly assigned Air Force
vehicle, contact... - ANSWER-Warner Robins Air Logistics Center (WR-ALC).
(402) To establish an Operator/Technician identification (ID) record in the Fleet
Management Information System (FMIS), you are required to include the member's... -
ANSWER-initials and man-number.
(403) How often is the vehicle minimum essential level (MEL) listing developed? -
ANSWER-Annually
(403) Identify the Fleet Management Information System (FMIS) transaction that is used
to access the scheduled maintenance report for vehicles that are due for maintenance
repairs. - ANSWER-"Inquiries" and sclect "Upcoming Work."
(403) Identify the mainteance priority that is given to a transient vehicle that vehicle
operations can support with a replacement vehicle. - ANSWER-Routine.
(403) ldentify the information that is needed to develop the vehicle minimum essential
level (MEL). - ANSWER-Vehicle authorizations.
(403) One benefit of controlling workflow is... - ANSWER-increased productive labor
hours.
(403) Select the best way to control vehicle repair workilow if a mechanic is not
available in your shop. - ANSWER-Farm out repairs to another shop if it is feasible.
(403) The most realistic vehicle repair estimated time in commission (ETIC) assigned is
jointly determined by the... - ANSWER-workload controller and shop supervisor
(403) Which maintenance priority should you assign to a sweeper that is needed to
clean the base after severe weather... - ANSWER-RED.
(404) As a minimum, install all completed delayed parts... - ANSWER-...during the next
scheduled preventive maintenance
, (404) ldentify the type of maintenance that may be postponed temporarily, and does not
compromise safety or severely affect vehicle performance. - ANSWER-Delayed.
(404) When conducting the delayed file reconciliation, you should... -
ANSWER-...ensure parts are in the correct bin locations.
(404) Who is responsible for making sure all jobs are completed that can be before
delaying a vehicle part? - ANSWER-Work center supervisor.
(404) Who makes the final decision to code a vehicle as nonmission capable supply
(NMCS)? - ANSWER-Vehicle fleet manager (VFM).
(405) How often is data input to the Logistics, Installations, and Mission Support-
Enterprise View Vehicle View (LIMS-EV VV) from the Integrated Logistics System-
Supply (ILS-S) and Fleet Management Information System (FMIS)? - ANSWER-Daily.
(405) Within how many mouse clicks is the Logistics, Installations and Mission Support-
Enterprise View Vehicle View (LIMS-EV VW) designed for you to arrive at requested
data? - ANSWER-3.
(406) How many hours could a completed request take to show in the Transaction
Request Tool (TRT) and Logistics, Installations and Mission Support-Enterprise View
Vehicle View (LIMS-EV VV)? - ANSWER-48.
(406) Whích status does a request move into once it is submitted in the Transaction
Request Tool (TRT)? - ANSWER-Awaiting.
(407) Fleet management and analysis (FM&A) furnishes the base comptroller's budget
office with a list of supported tenant organizations. - ANSWER-...at the beginning of
each fiscal year.
(407) Which organization or system will validate and/or assign a reimbursable code 3 or
refundable code 4 and the appropriate responsibility center/cost center (RC/CC) codes
for cach tenant organization? - ANSWER-Budget office.
(408) Which report gives you a picture of the month-to-date non-mission capable-
maintenance (NMCM), non-mission capable-supply (NMCS), and non-mission capable
(NMC)? - ANSWER-Mission Capable.
(409) Major commands (MAJCOM) must not exceed established vehicle ceilings without
prior approval from... - ANSWER-...441st Vehicle Support Chain Operations Squadron
(VSCOS).
(401) Identify the Fleet Management Information System (FMIS) that is approved by the
Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics
(OUSD AT&L). - ANSWER-Defense Property Accountability System (DPAS).
(402) How many working days do you have to establish a vehicle record jacket and
Fleet
Management Information System (FMIS) Vehicle Master File after receipt of a newly
assigned vehicle? - ANSWER-5.
(402) If you cannot find the vehicle registration number on a newly assigned Air Force
vehicle, contact... - ANSWER-Warner Robins Air Logistics Center (WR-ALC).
(402) To establish an Operator/Technician identification (ID) record in the Fleet
Management Information System (FMIS), you are required to include the member's... -
ANSWER-initials and man-number.
(403) How often is the vehicle minimum essential level (MEL) listing developed? -
ANSWER-Annually
(403) Identify the Fleet Management Information System (FMIS) transaction that is used
to access the scheduled maintenance report for vehicles that are due for maintenance
repairs. - ANSWER-"Inquiries" and sclect "Upcoming Work."
(403) Identify the mainteance priority that is given to a transient vehicle that vehicle
operations can support with a replacement vehicle. - ANSWER-Routine.
(403) ldentify the information that is needed to develop the vehicle minimum essential
level (MEL). - ANSWER-Vehicle authorizations.
(403) One benefit of controlling workflow is... - ANSWER-increased productive labor
hours.
(403) Select the best way to control vehicle repair workilow if a mechanic is not
available in your shop. - ANSWER-Farm out repairs to another shop if it is feasible.
(403) The most realistic vehicle repair estimated time in commission (ETIC) assigned is
jointly determined by the... - ANSWER-workload controller and shop supervisor
(403) Which maintenance priority should you assign to a sweeper that is needed to
clean the base after severe weather... - ANSWER-RED.
(404) As a minimum, install all completed delayed parts... - ANSWER-...during the next
scheduled preventive maintenance
, (404) ldentify the type of maintenance that may be postponed temporarily, and does not
compromise safety or severely affect vehicle performance. - ANSWER-Delayed.
(404) When conducting the delayed file reconciliation, you should... -
ANSWER-...ensure parts are in the correct bin locations.
(404) Who is responsible for making sure all jobs are completed that can be before
delaying a vehicle part? - ANSWER-Work center supervisor.
(404) Who makes the final decision to code a vehicle as nonmission capable supply
(NMCS)? - ANSWER-Vehicle fleet manager (VFM).
(405) How often is data input to the Logistics, Installations, and Mission Support-
Enterprise View Vehicle View (LIMS-EV VV) from the Integrated Logistics System-
Supply (ILS-S) and Fleet Management Information System (FMIS)? - ANSWER-Daily.
(405) Within how many mouse clicks is the Logistics, Installations and Mission Support-
Enterprise View Vehicle View (LIMS-EV VW) designed for you to arrive at requested
data? - ANSWER-3.
(406) How many hours could a completed request take to show in the Transaction
Request Tool (TRT) and Logistics, Installations and Mission Support-Enterprise View
Vehicle View (LIMS-EV VV)? - ANSWER-48.
(406) Whích status does a request move into once it is submitted in the Transaction
Request Tool (TRT)? - ANSWER-Awaiting.
(407) Fleet management and analysis (FM&A) furnishes the base comptroller's budget
office with a list of supported tenant organizations. - ANSWER-...at the beginning of
each fiscal year.
(407) Which organization or system will validate and/or assign a reimbursable code 3 or
refundable code 4 and the appropriate responsibility center/cost center (RC/CC) codes
for cach tenant organization? - ANSWER-Budget office.
(408) Which report gives you a picture of the month-to-date non-mission capable-
maintenance (NMCM), non-mission capable-supply (NMCS), and non-mission capable
(NMC)? - ANSWER-Mission Capable.
(409) Major commands (MAJCOM) must not exceed established vehicle ceilings without
prior approval from... - ANSWER-...441st Vehicle Support Chain Operations Squadron
(VSCOS).