159 Multiple choice questions
Term 1 of 159
A.m. p.m. is mandatory after any set that contains an entry of
Cutter underway
NEM chapter 41
Restrictive
Other tech none
Term 2 of 159
Approximate how long will it P6 pump run on a tank of fuel
4 hours
2 hours
6 hours
8 hours
Term 3 of 159
The greater the temp difference
The slower the heat transfer
The more energy is wasted
The less efficient the system becomes
The faster the heat transfer
,Term 4 of 159
What does article 31 allow
The right to remain silent
The right to a speedy trial
The right to bear arms
The right to free speech
Term 5 of 159
What class are all Coast Guard trailer hitches
Class three
Three months
Class four
Class five
Term 6 of 159
Cutter engineering report shall be completed in accordance with
Naval operations guide section 45
Naval engineering manual chapter 90
Marine engineering standards appendix b
Coast guard safety regulations part 12
,Term 7 of 159
Is a DIN what is represented by the letter F
Relay
Fuse/breaker
Controller Area Network
Check Voltage
Term 8 of 159
What is a hose shelflife
10 years
5 years
15 years
20 years
Term 9 of 159
What is disadvantage every centrifugal pump
Static discharge head
Static suction head
Fuse/breaker
Suction lift
, Term 10 of 159
A potable water hose should be labeled every
5 feet
10 feet
15 feet
20 feet
Term 11 of 159
Casualty control is used for what type of casualties
Operational and battle
Restricted
Official and local
Other, tech, none
Term 12 of 159
How long can you store a dry cell battery proper condition
Two years
10 years
Three months
Six years