3 keys to inspect and adapt are... - answer-the PI system demo quantitative measurement the problem-solving workshop 3 Pillars of Scrum - answer-transparency, inspection, adaptation 4 core values of SAFe - answer-built-in quality, program execution, alignment, transparency 4 program events - answer-PI planning ART sync System Demo Inspect and Adapt event 5 parts of every team increment - answer-plan, build, test, integrate, review 9 SAFe Lean-Agile principles - answer-1. take an economic view 2. apply systems thinking 3. assume variability; preserve options 4. build incrementally with fast, integrated learning cycles 5. base milestones on objective evaluation of working systems 6. visualize and limit WIP, reduce batch sizes, and manage queue lengths 7. apply cadence, synchronize with cross domain planning 8. unlock the intrinsic motivation of knowledge workers 9. decentralize decision making A good scrum coach moves toward - answer-* coaching the team to collaborate * being a facilitator * being invested in the team's overall performance * asking the team for the answer * letting the team find their own way * guiding * focusing on business value delivery * doing the right thing for the business right now * facilitating team problem-solving Adding new team members - answer-moves a team back to the forming stage Agile Release Train - answer-a virtual organization of 5-12 teams (50-125+) that plans, commits, and executes together agile teams are not just committed to the work, they are committed to (3)... - answer-other teams the program the stakeholders agile teams commit to iteration ____ not stories - answer-goals architectural runway - answer-existing code, hardware components, etc., that technically enable near-term business features art sync timebox - answer-1 hour assumptions - answer-many arguments are anchored in unexamined ___. At the conclusion of PI planning teams should have - answer-Velocity (capacity) and load for each iteration draft PI objectives program risks and impediments attendees for inspect and adapt - answer-teams and stakeholders automation - answer-dev ops response to continuous delivery pipeline backlog refinement timebox - answer-1 - 2 hours weekly benefit hypothesis - answer-justifies feature implementation cost and provides business perspective when making scope decisions business owners - answer-key stakeholders on the agile release train BVIR - answer-big visible information radiator CALMR approach to dev ops - answer-Culture Automation Lean flow Measurement Recovery capability - answer-dev ops is a ___ of every agile release train CFD - answer-cumulative flow diagram Common Anti-Patterns for Iteration Planning - answer-* delving too deep into technical discussions * commitment is unrealistic * velocity and load are exactly the same * SM is more focused on technical hat than facilitator hat * team under-commits due to fear of failure * no time reserved for support activities Common Anti-Patterns for PI Planning - answer-* pressure is put on the team to overcommit * team under-commits due to fear of failure * over-planning ahead of time to make it more efficient loses the essence of PI planning * the plan, rather than the alignment, become the goal Common Anti-Patterns for System Demos - answer-* too much time spent preparing the demo * demo is mainly talk/slides as opposed to working software/hardware * meeting doesn't happen if PO is unavailable * PO sees things for the first time in the team demo * System Demo is not doe because the team demo is enough * team members are not invited to the system demo to save time demos that are not interesting/relevant to program level stakeholders Common Anti-Patterns for team breakout #1 - answer-* No plan or partial plan at the end of the timebox. * Too much time is spent analyzing each story * Shared Scrum Masters and Product owners are not available enough *

Mostrar más Leer menos
Institución
Scaled Agile Framework / SAFe Scrum Master Certifi
Grado
Scaled Agile Framework / SAFe Scrum Master Certifi

Vista previa del contenido

SCALED AGILE FRAMEWORK / SAFE SCRUM MASTER
CERTIFICATION PREP (SSM)
3 keys to inspect and adapt are... - answer-the PI system demo
quantitative measurement
the problem-solving workshop

3 Pillars of Scrum - answer-transparency, inspection, adaptation

4 core values of SAFe - answer-built-in quality, program execution, alignment, transparency

4 program events - answer-PI planning
ART sync
System Demo
Inspect and Adapt event

5 parts of every team increment - answer-plan, build, test, integrate, review

9 SAFe Lean-Agile principles - answer-1. take an economic view
2. apply systems thinking
3. assume variability; preserve options
4. build incrementally with fast, integrated learning cycles
5. base milestones on objective evaluation of working systems
6. visualize and limit WIP, reduce batch sizes, and manage queue lengths
7. apply cadence, synchronize with cross domain planning
8. unlock the intrinsic motivation of knowledge workers
9. decentralize decision making

A good scrum coach moves toward - answer-* coaching the team to collaborate
* being a facilitator
* being invested in the team's overall performance
* asking the team for the answer
* letting the team find their own way
* guiding
* focusing on business value delivery
* doing the right thing for the business right now
* facilitating team problem-solving

Adding new team members - answer-moves a team back to the forming stage

Agile Release Train - answer-a virtual organization of 5-12 teams (50-125+) that plans, commits, and
executes together

agile teams are not just committed to the work, they are committed to (3)... - answer-other teams
the program
the stakeholders

, agile teams commit to iteration ____ not stories - answer-goals

architectural runway - answer-existing code, hardware components, etc., that technically enable near-
term business features

art sync timebox - answer-1 hour

assumptions - answer-many arguments are anchored in unexamined ___.

At the conclusion of PI planning teams should have - answer-Velocity (capacity) and load for each
iteration
draft PI objectives
program risks and impediments

attendees for inspect and adapt - answer-teams and stakeholders

automation - answer-dev ops response to continuous delivery pipeline

backlog refinement timebox - answer-1 - 2 hours weekly

benefit hypothesis - answer-justifies feature implementation cost and provides business perspective
when making scope decisions

business owners - answer-key stakeholders on the agile release train

BVIR - answer-big
visible
information
radiator

CALMR approach to dev ops - answer-Culture
Automation
Lean flow
Measurement
Recovery

capability - answer-dev ops is a ___ of every agile release train

CFD - answer-cumulative flow diagram

Common Anti-Patterns for Iteration Planning - answer-* delving too deep into technical discussions
* commitment is unrealistic
* velocity and load are exactly the same
* SM is more focused on technical hat than facilitator hat
* team under-commits due to fear of failure
* no time reserved for support activities

Escuela, estudio y materia

Institución
Scaled Agile Framework / SAFe Scrum Master Certifi
Grado
Scaled Agile Framework / SAFe Scrum Master Certifi

Información del documento

Subido en
22 de noviembre de 2024
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$9.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Leer en línea o como PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TOPDOCTOR Abacus College, Oxford
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
10
Miembro desde
2 año
Número de seguidores
5
Documentos
3395
Última venta
5 meses hace
TOPGRADER!!

Looking for relevant and updated study material to help you ace your exams? TOPTIERGRADES has your back!!! I have essential exams, test-banks, study bites, assignments all graded A+, Have Complete solutions, and are updated regularly. Please feel free to message me if you are looking for a specific test bank that is not listed on my profile or want a test bank or exam sent to you directly as google doc link. In the event that any of the materials have an issue, please let me know and I\'ll do my best to resolve it or provide an alternative. Thank You & All The Very BEST!!!!!

Lee mas Leer menos
5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes