LARE - Section 1 – Terms 100% Correct
DIFFERING SITE CONDITIONS" CLAUSE-("CHANGED CONDITIONS" CLAUSE) -
ANSWER-typically provides that in the event that the physical conditions at the site of
the work vary materially from those represented or reason-able anticipated and in a
manner which increases the time or cost of performance, the contractor is entitled to
additional compensation or an extension of time.

"SUSPENSION OF WORK" CLAUSE - ANSWER-clause inserted in construction
contracts only and which deals with the right of the owner to suspend the work for a
period of time as it may determine to be appropriate for the convenience of the owner.
When such a clause is inserted into the contract and is then exercised, an adjustment
shall be made, an increase in the cost of performance of the contract (excluding profit)
necessarily shall be caused by such
unreasonable suspension, delay, or interruption, and the contract shall be modified in
writing accordingly. However, no adjustment shall be made under this clause for any
suspension by the owner if performance would have been suspended by reason of any
other cause, including fault or negligence of the con-tractor, or if an equitable
adjustment is provided for or excluded under any other provision of the contract.

ACCELERATION COST - ANSWER-cost incurred by a contractor when the project is
interfered with by the owner, in such a way, that the contractor must employ more
manpower or work more hours in order to complete the project on time. If the contractor
contributes to the cause of its own delays, acceleration cost may not be granted.

ACTIVE INTERFERENCE - ANSWER-action by a party to a contract that causes the
other party of the contract to not complete the work of the project on time or in the
manner established by the contract writing. Positive action must be per-formed on the
part of the interfering party as opposed to passive negligence, which is inactive,
permissive, or sub-missive.

ACTUAL DAMAGES - ANSWER-real, substantial, and just damages, or the amount
awarded to a complainant in compensation for actual and real loss or injury, as opposed
to "nominal" or "punitive" damages.

ADDENDA - ANSWER-modifications to the contract documents issued during the bid
period. Addenda become official parts of the contract documents and are legally binding
to the signatories of the contract.

AGENT - ANSWER-Works directly for a a particular party as opposed to an an
architect, who is generally a representative of an owner. Often times a construction
manager is hired by an owner as his agent to supervise and manage a project.

ALLOWANCE - ANSWER-a sum of money set aside by the owner to remove a
particular portion of work from competitive bid-ding. This is typical of government-

, subsidized institutions with work that must be competitively bid and with projects in
which certain portions of the work are proprietary and, therefore, must be removed from
competitive bidding.

ALTERNATE - ANSWER-a choice where cost is a factor in the selection. An option
does not have cost as a factor and the choice is made by the contractor.

ANTITRUST LAWS - ANSWER-bid rigging is considered a violation of antitrust laws.

ARBITRATION - ANSWER-the submission of a dispute to a third party known as
arbitrator(s), whose judgment is final and binding. Decisions at arbitration hearings,
unlike those in judicial cases, do not establish precedents.

ARBITRATOR - ANSWER-one who resolves disputes between two par-ties. In a typical
construction contract, the Landscape Architect is designated as an arbitrator in
resolving the disputes between the owner and the contractor. Unlike formal arbitration a
Landscape Architect acting as arbitrator is the first level for resolving disputes, and its
decision is not final and binding.

ASSIGNMENT - ANSWER-when a person who is not party to a contract obtains the
contract rights of a party who is. A contractor, for example, may assign the rights
contained in its contract with the owner to a subcontractor.

BID - ANSWER-an offer to perform a contract for work and labor or for supplying
materials at a specified price. A bid, as an offer, becomes a contract once the owner
accepts the bidder's offer with all other contractual requirements in order.

BID BOND - ANSWER-a form of security to insure that the bidder will enter into the
contract if the award is made to it.

BUILDING CODE - ANSWER-there are several model codes, including Southern
Standard Building Code (SSDSC), Uniform Building Code (UBC), Building Officials and
Code Administrators (BOCA), the National Building Code (NBC), and the International
Building Code (IBC) one of which is enacted in most jurisdictions. A code is not
applicable in a certain jurisdiction or locality until it is enacted (legislated) into local law.

CERTIFICATE OF PAYMENT - ANSWER-a document issued by the Landscape
Architect in which the Landscape Architect certifies that the contractor has adequately
performed. The certificate is then presented to the owner for payment to the contractor.

CERTIFICATE OF SUBSTANTIAL COMPLETION - ANSWER-the document issued by
the Landscape Architect when the building, or a portion thereof, is complete to the
degree that the owner can use the building, or a portion thereof, for its intended
purpose.

Información del documento

Subido en
21 de noviembre de 2024
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.79

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CLOUNDLite
3.9
(132)
Vendido
670
Seguidores
389
Artículos
12466
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes