ACI Strength Exam Study Guide with Complete Solutions

Document preview thumbnail
Vista previa 3 fuera de 23 páginas

ACI Strength Exam Study Guide with Complete Solutions Name the two allowable materials with with concrete cylinders may be capped with. - ANSWER-I. High-strength gypsum II. Sulfur mortar III. Neat cement paste Name the three materials with with cylinders may be capped against. - ANSWER-I. Glass II. Metal III. Granite Prior to beginning the capping procedure, what must the metal plate be inspected for? - ANSWER-I. Grooves II. Gouches III. Indentations What is the maximum allowable size of any indentation on the base plate? - ANSWER-0.010 in [0.25 mm] Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/23 Upon receipt of the caping material, for how long can it be kept in intervals? - ANSWER-3 months When must the neat cement paste be applied it to the cylinder? - ANSWER- Immediately For how long must the concrete settle in the mold prior to applying the neat cement paste? - ANSWER-2 to 4 hours Prior to capping, name the three tasks that must be performed on the cylinder. - ANSWER-I. Inspect for any bumps greater than 1/8" II. Remove foreign debris. III. Remove any excess water or laitence. What is the required position of the concrete cylinder? - ANSWER-90° ± 0.5° Name the required temperature range of the heated sulfar mortar mixture. - ANSWER-265°F to 290 °F [130 °C to 145 °C] What is the maximum number of times that the heated sulfur may be used per cylinder capping procedure? - ANSWER-5 times These procedures for capping enable concrete cylinders and cores to meet the standard practice's requirements for _____ and _____. - ANSWER-perpendicularity ... planeness ... perpendicularity Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 3/23 Equipment needed for the capping process includes capping ____ ____ devices and _____ pots. - ANSWER-plates ... alignment ... melting Plates for neat cement and high-strength gypsum plaster caps should be made of ____, _____, or _____. - ANSWER-metal ... glass .... granite Sulfar mortar cap plates should be formed against _____ or _____ plates. - ANSWER-marble ... stone True or false? The purpose of the guide bar or bull's eye level is to ensure that caps remain perpendicular to the axi of the cylinder within 0.5 degrees. - ANSWER-True To avoid accidents during reheating of cooled sulfur, use melting pots that have _____. - ANSWER-Metal covers The technician should use a stiff layer of _____ to cap fresh concrete cylinders. - ANSWER-Burlap Hardened concrete cylinders should be capped with ________, ______, or _______. - ANSWER-cement paste ... gypsum .... mortar sulfur True or false? Plasters of paris and mixtures of plaster of paris and portland are examples of suitable high-strength plasters. - ANSWER-True Sulfar mortars and high-strength gypsum cement cubes must demonstrate a minimum compressive strength of _____ or _____, whichever is greater. - ANSWER-5000 psi Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 4/23 The cement paste should be applied to the freshly molded cylinder from _____ hours after molding. This is to allow for _____ of the concrete specimen. - ANSWER-2-4 ... settling The strength of the paste depends on: A. The water-cement ratio B. Time C. The equipment used D. Type of cement - ANSWER-A. The water-cement ratio A slight twisting action will help eliminate _____ and air _____ when teh capping plate is placed onto the ound mound of paste. - ANSWER-cracks ... voids Neat cement paste caps should not be used on dry specimens because the caps may _____ and _____ when dry. - ANSWER-crack The technician should remove all _____ or _____ materials from the ends of hardened concrete cylinders before capping. - ANSWER-debris ... foreign _____ the pot and recharge the fresh material at intervals to ensure that the oldest material has not been used more than _____ times. - ANSWER-Stir ... five Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 5/23 True or false? When capping concrete cylinders with a comprehensive strength of 35 MPa [5000 psi] or greater, it is permitted to reuse compound recovered from the capping operation or old caps. - ANSWER-True To avoid _____, the sulfur mortar should be dry when it is added to the pot. It should be kept away from _____ when heating. - ANSWER-cracking ... moisture The melting pot for the sulfur mortar must be located under a _____ with an _____ for _____. - ANSWER-hood ... ventilation Hydrogen sulfide gas, which may be produced during capping,

Vista previa del contenido

ACI Strength Exam Study Guide with
Complete Solutions

Name the two allowable materials with with concrete cylinders may be capped with. -

ANSWER✔✔-I. High-strength gypsum


II. Sulfur mortar


III. Neat cement paste


Name the three materials with with cylinders may be capped against. - ANSWER✔✔-I.

Glass


II. Metal


III. Granite


Prior to beginning the capping procedure, what must the metal plate be inspected for? -

ANSWER✔✔-I. Grooves


II. Gouches


III. Indentations


What is the maximum allowable size of any indentation on the base plate? -

ANSWER✔✔-0.010 in [0.25 mm]


Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 1/23

,Upon receipt of the caping material, for how long can it be kept in intervals? -

ANSWER✔✔-3 months


When must the neat cement paste be applied it to the cylinder? - ANSWER✔✔-

Immediately


For how long must the concrete settle in the mold prior to applying the neat cement

paste? - ANSWER✔✔-2 to 4 hours


Prior to capping, name the three tasks that must be performed on the cylinder. -

ANSWER✔✔-I. Inspect for any bumps greater than 1/8"


II. Remove foreign debris.


III. Remove any excess water or laitence.


What is the required position of the concrete cylinder? - ANSWER✔✔-90° ± 0.5°


Name the required temperature range of the heated sulfar mortar mixture. -

ANSWER✔✔-265°F to 290 °F [130 °C to 145 °C]


What is the maximum number of times that the heated sulfur may be used per cylinder

capping procedure? - ANSWER✔✔-5 times


These procedures for capping enable concrete cylinders and cores to meet the standard

practice's requirements for _____ and _____. - ANSWER✔✔-perpendicularity ...

planeness ... perpendicularity



Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/23

, Equipment needed for the capping process includes capping ____ ____ devices and

_____ pots. - ANSWER✔✔-plates ... alignment ... melting


Plates for neat cement and high-strength gypsum plaster caps should be made of ____,

_____, or _____. - ANSWER✔✔-metal ... glass .... granite


Sulfar mortar cap plates should be formed against _____ or _____ plates. -

ANSWER✔✔-marble ... stone


True or false? The purpose of the guide bar or bull's eye level is to ensure that caps

remain perpendicular to the axi of the cylinder within 0.5 degrees. - ANSWER✔✔-True


To avoid accidents during reheating of cooled sulfur, use melting pots that have _____. -

ANSWER✔✔-Metal covers


The technician should use a stiff layer of _____ to cap fresh concrete cylinders. -

ANSWER✔✔-Burlap


Hardened concrete cylinders should be capped with ________, ______, or _______. -

ANSWER✔✔-cement paste ... gypsum .... mortar sulfur


True or false? Plasters of paris and mixtures of plaster of paris and portland are

examples of suitable high-strength plasters. - ANSWER✔✔-True


Sulfar mortars and high-strength gypsum cement cubes must demonstrate a minimum

compressive strength of _____ or _____, whichever is greater. - ANSWER✔✔-5000 psi




Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 3/23

Información del documento

Subido en
18 de noviembre de 2024
Número de páginas
23
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
SophiaBennett
3.6
(29)
Vendido
159
Seguidores
5
Artículos
9084
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes