Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Examen

SWM DEQ EXAM QUESTIONS NEWEST REAL QUESTIONS

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

SWM DEQ EXAM QUESTIONS NEWEST REAL QUESTIONS

Vista previa del contenido

SWM DEQ EXAM QUESTIONS NEWEST REAL QUESTIONS AND
CORRECT DETAILED ANSWERS (100% CORRECT VERIFIED
ANSWERS) |GUARANTEED PASS A+ (BRAND NEW!!)
The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - ANSWER: Virginia Stormwater Management Act,
Virginia Stormwater Management Program Regulation

VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are - ANSWER: greater than or equal to an acre

The Stormwater Management Act requires the State Water Control Board to -
ANSWER: permit, regulate, and control stormwater runoff

DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts
upon request - ANSWER: 90

The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - ANSWER: staff of a stormwater program,
anyone contracted by a VSMP authority, standard and specification holders

The dual certificate will expire three years from - ANSWER: the latest date of the
certificates

SWM plan must be approved by ___ before land disturbance - ANSWER: VSMP
program authority

The water quality criteria sets a site-based load limit of ____ of total phosphorus for
new development - ANSWER: 0.41 lbs/acre/year

The phosphorus load limit uses the - ANSWER: 10% impervious cover

Part II B and II C water quantity criteria addresses - ANSWER: channel protection and
flood protection

Which two plans in the SWPPP must be approved? - ANSWER: SWM plan, ESC plan

Does the SWM plan address runoff during or after construction? - ANSWER: post-
construction

What is the lower limit of the range of imperviousness that can result in stream
degradation? - ANSWER: 10%

What do land disturbing activities consist of? - ANSWER: excavating, clearing, grading

, LDA threshold for the SWM Act and Regulation - ANSWER: 1 acre or 2500 square
feet for Chesapeake Bay Preservation Act

In situations where an initial exemption was applicable because LDAs were related to
emergency work, VSMP authority shall be advised of the disturbance within -
ANSWER: 7 days of commencing the LDA and shall submit a permit application
within 30 days of starting the land-disturbing activity

Localities with MS4 - ANSWER: must adopt and administer a stormwater program

Localities without MS4 - ANSWER: may choose to administer a VSMP or have DEQ
administer the program

DEQ is responsible for enforcing the ____ while locality ____ are responsible for
enforcing local ordinances - ANSWER: Construction GP, VSMP

A locality VSMP authority must include enforcement authority and a schedule of civil
penalties for enforcement actions in its local ordinance. The maximum penalty the
authority may issue is - ANSWER: $32,500 per violation per day

Any civil penalty assessed by a court as a result of a summons issued by a locality
VSMP authority must be paid - ANSWER: into the locality's treasury

Any person who violates..... shall be subject to a civil penalty not to exceed -
ANSWER: $32, 500

Chesapeake Bay Preservation Areas that result in a land disturbance greater than or
equal to ____ and less than ____ - ANSWER: 2,500 ft^2, 1 acre

CBPA LDAs must have - ANSWER: approved E&SC plan, approved SWM plan, local
approval to start land disturbance, long-term maintenance agreement, construction
record drawings

CBPA LDAs do not require - ANSWER: Construction GP, Pollution prevention Plan,
Additional control measures to address TMDL

State entities and linear projects ___ submit a single set of standards and
specifications to DEQ for approval, federal entities ____ - ANSWER: must, may

Name the 5 steps in order of the permitting process - ANSWER: submittal of ESC
plans and SWM plans, SWM plan review and approval, registration statement entry
into Construction GP, Construction GP approved by DEQ, Locality VSMP authority
approval to start land disturbance

The locality VSMP authority has ___ days to determine the completeness of a
stormwater management plan and to notify the applicant of its determination -
ANSWER: 15

Libro relacionado
 image
Charles H. Kraft SWM/SIS at Forty
Editorial: 2005 ISBN: 9780878083497 Edición: Desconocido

Información del documento

Subido en
17 de noviembre de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
7
Seguidores
1
Artículos
1137
Última venta
4 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes