*When6using6the6preheat6alternative6weld6method,6the6temperature6shall6be6checked6__
_6to6assure6the6minimum6temperature6is6maintained6during6welding.
A)6one6inch6or6two6times6the6material6thickness6whichever6is6greater,6on6each6side6of6the
6groove.
B)6two6inches6or6two6times6the6material6thickness,6whichever6is6great,6on6each6side6of6th
e6groove
C)6Three6inches6or6three6times6the6material6thickness,6whichever6is6greater,6in6each6side
6of6the6groove
D)6Four6inches6or6four6times6the6material6thickness6whichever6is6greater6on6each6side6of6
the6groove6-6ans--D
*For6a6roof6to6be6considered6as6frangible:
A)6the6top6angle6shall6be6larger6than626X6263/166in
B)6the6top6angle6attachments6weld6shall6me6a6minimum6of63/16"
C)6The6roof6support6members6shall6not6be6attached6tot6he6roof6plate
D)6the6roof6support6members6shall6be6attached6to6the6roof6plate6-6ans--C
*What6are6the6examiner6qualification6for6visual6examination6for6tank6inspection?
A)6Shall6comply6with6ASME6Sect6V,6article69
B)6Shall6have6visual6capable6of6reading6a6standard6Jaeger6J-16chart
C)6Shall6have6biennial6visual6examination6by6a6license6optometrist
D)6There6are6no6requirements6-6ans--D
*Sulfuric6acid6corrosion6can6be6inspected6and6monitored6with:
A)6Shear6wave6ultrasonic6testing
B)6Visual6Inspection
C)6Coupons6and6ER6probes
D)6Wet6fluorescent6magnetic6particle6testing6-6ans--C
*What6is6the6maximum6interpass6temperature6permitted,6in6API6653,6when6using6the6pre
heat6alternative6to6PWHT6welding6method?
A)6600°F
B)6450°F
C)6300°F
D)6800°F6-6ans--A
*Radiographic6examinations6are6required6for6all6of6the6following6except:
,A)6New6and6replaced6shell6insert6plate6and6door6sheet6welds
B)6All6repairs6to6butt-welds6that6are6examined6ultrasonically
C)6New6annular6plate6joints
D)6Shell6Butt-welds6on6reconstructed6tanks6-6ans--B
*For6tanks6constructed6of6material6having6a6yield6strength6equal6to6or6less6than6_____,6it6
may6not6be6necessary6to6raise6all6nozzles,6when6installing6a6new6bottom6in6an6existing6ta
nk,6if6certain6conditions6are6met.
A)6700006psi
B)6600006psi
C)6500006psi
D)6400006psi6-6ans--C
*A6tank,6built6to6the6ninth6edition6of6API6650,6is6to6have6a6new6bottom6installed.6The6instal
lation6will6be6performed6by6slotting6the6shell6and6inserting6the6new6bottom.6The6shell6plat
e6material6is6A-5166Gr.6606and6the6new6shell6to6bottom6weld6will6be6made6using6low-
hydrogen6electrodes.6An6existing6NP26126reinforced6shell6penetration6does6not6meet6the
6minimum6weld6spacing6requirements6of6the6current6API66506edition.6There6is65-
1/26inches6between6the6toe6of6the6shell6to6bottom6weld6and6the6toe6of6reinforcing6plate6fill
et6weld.6The6inspector6should:
A)6Order6the6penetration6raised6to6comply6with6the6current6API66506weld6spacing6require
ments
B)6Order6the6penetration6raised6to6obtain6a6minimum6of666inches6between6the6toe6of6the6
shell6to6bottom6weld6and6the6toe6of6reinforcing6plate6fillet6weld.
C)6Accept6the6penetration6provided6the6penetration6weld6and6the6shell6to6bottom6weld6ar
e6blend6ground6and6examined6by6the6appropr6-6ans--C
*Permanent6attachment6welds,6made6on6A-
5166Gr.6606plate6shall6be6examined6by6which6of6the6following6methods?
A)6Magnetic6particle
B)6Liquid6Penetrant
C)6Either6Magnetic6particle6or6liquid6penetrant
D)6Visual6-6ans--D
*During6an6inspection,6an6inspector6finds6lap-
welded6patch6on6a6tank6shell.6Some6patches6are6thinner6than60.500"6and6others6are6thic
ker6than60.500".6No6patch6plate6is6thinner6that60.1875".6What6should6the6inspector6do?
A)6All6patches6thicker6than60.50"6must6be6removed6and6repairs6made6in6accordance6with
6API6653
B)6Consult6with6engineer6experienced6in6tank6design
C)6all6existing6welded6on6patch6plates6are6acceptable6provided6they6meet6the6size6and6lo
cation6requirements6of6API6653
D)6All6of6the6existing6patch6plates6must6be6removed6and6repairs6made6in6accordance6wit
h6API66536-6ans--C
*in6regards6to6seismic6design,6reconstructed6tanks:
, A)6shall6meet6the6stability6requirments6of6the6current6applicable6standards
B)6Require6the6anchoring6of6the6tank6even6if6not6used6on6the6original6tank
C)6Require6the6installation6of6thickened6bottom6plates6under6the6bottom6shell6course6of6n
ot6existing
D)6Shall6meet6the6stability6requirments6of6the6"as-built"6standard6-6ans--A
*New6welds6(Not6repair6welds)6on6tank6bottom6plates6should6be6examined:
A)6By6vacuum6box6and6tracer6gas
B)6By6magnetic6particle6and6visual
C)6By6visual6only
D)6By6visual6and6vacuum6box6-6ans--D
*API66536requires6the6perimeter6welds6on6the6welded6on6patches6on6the6critical6zone6be:
A)6Two-pass6and6examined6by6visually6and6by6MT6or6PT
B)6Welded6on6pathc6plats6are6not6permitted6for6repairs6in6the6critical6Zone
C)6Single6pass6and6examined6visually6and6by6MT6or6PT
D)6Single6pass6and6examined6visually6and6by6vacuum6box6test6-6ans--A
*The6inspector6finds6a6thin6area6in6the6shell6of6a61506ft.6diameter6riveted6tank.6The6maxi
mum6horizontal6dimension6of6the6thin6area6in6four6inches6and6the6maximum6vertical6dime
nsion6is6one6inch.6The6nearest6edge6of6the6thin6area6is6twelve6inche6from6a6vertical6seam
6and6fifteen6inches6from6horizontal6seam.6it6is6decided6to6make6the6repair6using6a6weld-
on6lap6patch.6Which6is6the6minimum6repair6plate6dimension?
A)6A6lap6patch6is6not6permitted6on6a6riveted6shell
B)6Four6inches
C)6Two6inches
D)6Six6inches6-6ans--B
*New6lap6welded6shell6patch6plate6attachment6welds6shall6be6examined6by6which6of6the6f
ollowing?
A)6Visually6and6by6MT6or6PT
B)6MT6or6PT6only
C)6Vacuum6box6and6solution6film
D)6Visually6only6-6ans--A
*A6locally6thinned6area6is6found6in6a6106year6old6tank.6The6thinned6area6is6located6near6a
6weld6in6the6third6shell6course6from6the6bottom;6206feet6below6the6maximum6liquid6level.6
The6tank6was6built6to6API66506eighth6edition6requirments6with6RT6done6as6required6by6th
e6basic6standard.6The6tank6is62006feet6in6diameter6and6406feet6high.6The6RN6specific6gra
vity6of6the6product6stored6in6the6tank6is60.86.6The6tank6material6allowable6stress6is633,00
06psi.6The6joint6efficiency6is61.0.6What6minimum6thickness6is6required?
A)60.2576inches
B)60.2986inches
C)60.3196inches
D)60.2716inches6-6ans--D
ONLY
*When6using6the6preheat6alternative6weld6method,6the6temperature6shall6be6checked6__
_6to6assure6the6minimum6temperature6is6maintained6during6welding.
A)6one6inch6or6two6times6the6material6thickness6whichever6is6greater,6on6each6side6of6the
6groove.
B)6two6inches6or6two6times6the6material6thickness,6whichever6is6great,6on6each6side6of6th
e6groove
C)6Three6inches6or6three6times6the6material6thickness,6whichever6is6greater,6in6each6side
6of6the6groove
D)6Four6inches6or6four6times6the6material6thickness6whichever6is6greater6on6each6side6of6
the6groove6-6ans--D
*For6a6roof6to6be6considered6as6frangible:
A)6the6top6angle6shall6be6larger6than626X6263/166in
B)6the6top6angle6attachments6weld6shall6me6a6minimum6of63/16"
C)6The6roof6support6members6shall6not6be6attached6tot6he6roof6plate
D)6the6roof6support6members6shall6be6attached6to6the6roof6plate6-6ans--C
*What6are6the6examiner6qualification6for6visual6examination6for6tank6inspection?
A)6Shall6comply6with6ASME6Sect6V,6article69
B)6Shall6have6visual6capable6of6reading6a6standard6Jaeger6J-16chart
C)6Shall6have6biennial6visual6examination6by6a6license6optometrist
D)6There6are6no6requirements6-6ans--D
*Sulfuric6acid6corrosion6can6be6inspected6and6monitored6with:
A)6Shear6wave6ultrasonic6testing
B)6Visual6Inspection
C)6Coupons6and6ER6probes
D)6Wet6fluorescent6magnetic6particle6testing6-6ans--C
*What6is6the6maximum6interpass6temperature6permitted,6in6API6653,6when6using6the6pre
heat6alternative6to6PWHT6welding6method?
A)6600°F
B)6450°F
C)6300°F
D)6800°F6-6ans--A
*Radiographic6examinations6are6required6for6all6of6the6following6except:
,A)6New6and6replaced6shell6insert6plate6and6door6sheet6welds
B)6All6repairs6to6butt-welds6that6are6examined6ultrasonically
C)6New6annular6plate6joints
D)6Shell6Butt-welds6on6reconstructed6tanks6-6ans--B
*For6tanks6constructed6of6material6having6a6yield6strength6equal6to6or6less6than6_____,6it6
may6not6be6necessary6to6raise6all6nozzles,6when6installing6a6new6bottom6in6an6existing6ta
nk,6if6certain6conditions6are6met.
A)6700006psi
B)6600006psi
C)6500006psi
D)6400006psi6-6ans--C
*A6tank,6built6to6the6ninth6edition6of6API6650,6is6to6have6a6new6bottom6installed.6The6instal
lation6will6be6performed6by6slotting6the6shell6and6inserting6the6new6bottom.6The6shell6plat
e6material6is6A-5166Gr.6606and6the6new6shell6to6bottom6weld6will6be6made6using6low-
hydrogen6electrodes.6An6existing6NP26126reinforced6shell6penetration6does6not6meet6the
6minimum6weld6spacing6requirements6of6the6current6API66506edition.6There6is65-
1/26inches6between6the6toe6of6the6shell6to6bottom6weld6and6the6toe6of6reinforcing6plate6fill
et6weld.6The6inspector6should:
A)6Order6the6penetration6raised6to6comply6with6the6current6API66506weld6spacing6require
ments
B)6Order6the6penetration6raised6to6obtain6a6minimum6of666inches6between6the6toe6of6the6
shell6to6bottom6weld6and6the6toe6of6reinforcing6plate6fillet6weld.
C)6Accept6the6penetration6provided6the6penetration6weld6and6the6shell6to6bottom6weld6ar
e6blend6ground6and6examined6by6the6appropr6-6ans--C
*Permanent6attachment6welds,6made6on6A-
5166Gr.6606plate6shall6be6examined6by6which6of6the6following6methods?
A)6Magnetic6particle
B)6Liquid6Penetrant
C)6Either6Magnetic6particle6or6liquid6penetrant
D)6Visual6-6ans--D
*During6an6inspection,6an6inspector6finds6lap-
welded6patch6on6a6tank6shell.6Some6patches6are6thinner6than60.500"6and6others6are6thic
ker6than60.500".6No6patch6plate6is6thinner6that60.1875".6What6should6the6inspector6do?
A)6All6patches6thicker6than60.50"6must6be6removed6and6repairs6made6in6accordance6with
6API6653
B)6Consult6with6engineer6experienced6in6tank6design
C)6all6existing6welded6on6patch6plates6are6acceptable6provided6they6meet6the6size6and6lo
cation6requirements6of6API6653
D)6All6of6the6existing6patch6plates6must6be6removed6and6repairs6made6in6accordance6wit
h6API66536-6ans--C
*in6regards6to6seismic6design,6reconstructed6tanks:
, A)6shall6meet6the6stability6requirments6of6the6current6applicable6standards
B)6Require6the6anchoring6of6the6tank6even6if6not6used6on6the6original6tank
C)6Require6the6installation6of6thickened6bottom6plates6under6the6bottom6shell6course6of6n
ot6existing
D)6Shall6meet6the6stability6requirments6of6the6"as-built"6standard6-6ans--A
*New6welds6(Not6repair6welds)6on6tank6bottom6plates6should6be6examined:
A)6By6vacuum6box6and6tracer6gas
B)6By6magnetic6particle6and6visual
C)6By6visual6only
D)6By6visual6and6vacuum6box6-6ans--D
*API66536requires6the6perimeter6welds6on6the6welded6on6patches6on6the6critical6zone6be:
A)6Two-pass6and6examined6by6visually6and6by6MT6or6PT
B)6Welded6on6pathc6plats6are6not6permitted6for6repairs6in6the6critical6Zone
C)6Single6pass6and6examined6visually6and6by6MT6or6PT
D)6Single6pass6and6examined6visually6and6by6vacuum6box6test6-6ans--A
*The6inspector6finds6a6thin6area6in6the6shell6of6a61506ft.6diameter6riveted6tank.6The6maxi
mum6horizontal6dimension6of6the6thin6area6in6four6inches6and6the6maximum6vertical6dime
nsion6is6one6inch.6The6nearest6edge6of6the6thin6area6is6twelve6inche6from6a6vertical6seam
6and6fifteen6inches6from6horizontal6seam.6it6is6decided6to6make6the6repair6using6a6weld-
on6lap6patch.6Which6is6the6minimum6repair6plate6dimension?
A)6A6lap6patch6is6not6permitted6on6a6riveted6shell
B)6Four6inches
C)6Two6inches
D)6Six6inches6-6ans--B
*New6lap6welded6shell6patch6plate6attachment6welds6shall6be6examined6by6which6of6the6f
ollowing?
A)6Visually6and6by6MT6or6PT
B)6MT6or6PT6only
C)6Vacuum6box6and6solution6film
D)6Visually6only6-6ans--A
*A6locally6thinned6area6is6found6in6a6106year6old6tank.6The6thinned6area6is6located6near6a
6weld6in6the6third6shell6course6from6the6bottom;6206feet6below6the6maximum6liquid6level.6
The6tank6was6built6to6API66506eighth6edition6requirments6with6RT6done6as6required6by6th
e6basic6standard.6The6tank6is62006feet6in6diameter6and6406feet6high.6The6RN6specific6gra
vity6of6the6product6stored6in6the6tank6is60.86.6The6tank6material6allowable6stress6is633,00
06psi.6The6joint6efficiency6is61.0.6What6minimum6thickness6is6required?
A)60.2576inches
B)60.2986inches
C)60.3196inches
D)60.2716inches6-6ans--D