• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 32 páginas
Examen

Leed Ap Bd+C New Exam With Complete Solutions

Document preview thumbnail
Vista previa 4 fuera de 32 páginas

LEED AP BD+C NEW EXAM WITH COMPLETE SOLUTIONS...

Vista previa del contenido

LEED AP BD+C NEW EXAM WITH COMPLETE SOLUTIONS



What % is the default gender ratio for indoor water us reduction calculation? - ANSWER
1 to 1 ; i.e. 50/50 male to female



What energy related systems shall be commissioned? - ANSWER -Mechanical, including
HVAC&R equipment & controls

-Electrical lighting and daylighting controls

-Plumbing, including domestic hot water systems

-Renewable energy sytems



Which of the following device would allow building systems to conserve energy by
moderating humidity and temperature? - ANSWER An economizer



What are the eligible types of systems for Renewable Energy Production? - ANSWER
-Photovoltaic Systems

-Wind Energy Systems

-Solar Thermal Systems

-BioFuel-based electrical systems

-Geothermal heating or electric systems

-Low Impact Hydroelectric power systems

-Wave & tidal power systems



RECs can used to mitigate what types of emissions for Green Power & Carbon Offsets -
ANSWER Scope 2, electricity use



Skyglow What is the cause of Skyglow? ANSWER Stray light from unshielded light
sources and light reflecting off surfaces that then enter the atmosphere and illuminate
and reflect off dust, debris and water vapor.

,Commissioning ANSWER The process by which the owner verifies that the project's
energy-related systems are installed, calibrated and perform as intended.



What are the advantages of commissioning? - ANSWER Decreased Energy
Consumption, Lower Operating Costs, Reduced contractor Callbacks, Better Building
Documentation, Improved Occupant Productivity, Verification that systems perform
with Owner's project requirements.



Regulated or (non process) Energy includes? - ANSWER -Lighting (interior, parking
garage, surface parking, facade or building grounds)

-HVAC

-Service water heating for domestic or space heating purposes



What four basic strategies can enhance energy performance? - ANSWER ORIENTATION



SITE ENERGY SOURCES



EFFICIENT ENVELOPE



ENERGY RECOVERY SYSTEMS



For how long and at what % does a project have to participate to achieve points under
Green Power & Carbon Offsets? - ANSWER 5 year contract & 50% supply of the
project's energy from green power, carbon offsets, or renewable energy certificates.



What is the discounted parking rate for Green Vehicles - ANSWER 20% Discount



What does the Basis of Design need to include? - ANSWER Primary Design
Assumptions, Standards, & Narrative Descriptions

,What 3 options are presented for a compliance path in Optimize Energy Performance
(EA PreRequisite 2)? - ANSWER OPTION 1- Whole Building Energy Simulation



OPTION 2- Prescriptive Compliance Path: ASHRAE 50% Advanced Energy Design



OPTION 3- Prescriptive Compliance Path: Advanced Buildings Core Performance Guide



What are the 2 Options for Enhanced Refrigerant Management - ANSWER OPTION 1- No
refrigerants or low-impact refrigerants



OPTION 2- Calculation of Refrigerant Impact



What are the 3 basic methods for ventilating buildings? - ANSWER Mechanical
Ventilation = ACTIVE VENTILATION



Natural Ventilation= PASSIVE VENTILATION



Mixed-mode Ventilation= BOTH NATURAL + MECH)



What fixtures and fittings must be included in the indoor water use reduction
calculations? -ANSWER Water closets, urinals, lavatory faucets, showers, kitchen sink
faucets, and pre-rinse spray valves



What does Owner's Project Requirements Typically include? -ANSWER Owner & User
Requirements,

Environmental & Sustainability Goals,

Energy Efficiency Goals,

Indoor Environmental Quality Requirements,

, Equipment & System Expectations, Building Occupant &

O&M Personnel Requirements



What refrigerant management program requires the annual leakage of CFC- based
refrigerants to be reduced to 5% or less? - ANSWER EPA Clean Air Act, Title VI, Rule
608



What biofuel systems are NOT eligible for Renewable Energy Production - ANSWER
Combustion of municipal solid waste, Forestry biomass waste other than mill residue,
coated wood, or treated wood.



What are types of emissions that Carbon Offsets can offset to mitigate for Green Power
& Carbon Offsets? - ANSWER Scope 1 or Scope 2 emissions



If Schools are trying to accomplish Site Master Plan, how many other credits must be
met? - ANSWER At least 4 or 6 of these credits:



-LT Credit High Priority Site

-SS Credit Site Development- Protect or Restore Habitat

-SS Credit Open Space

-SS Credit Rainwater Management

-SS Credit Heat Island Reduction

-SS Credit Light Pollution Reduction



What documents are developed as outcome of the fundamental commissioning and
verification? ANSWER Cx Report



Current Facility requirements



Operations and maintenance plan

Información del documento

Subido en
13 de noviembre de 2024
Número de páginas
32
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Easton
3.9
(124)
Vendido
604
Seguidores
221
Artículos
28026
Última venta
1 día hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes