Examen

EPA 608 Type III Practice Questions

Document preview thumbnail
Vista previa 2 fuera de 10 páginas

A) 2 psig. B) 5 psig. C) 10 psig. D) 15 psig. Answer: C - answerA typical setting for the high pressure cut-out control on a recovery unit used for evacuating the refrigerant from a low pressure chiller is: A) adding compressed air, since it will be removed from the system by the Purging unit. B) operating the purge system. C) adding HCFC-22. D) raising system pressure by heating with circulated hot water or heating blankets. Answer: D - answerA charged low pressure refrigeration system can be efficiently leak checked by: A) low head pressure. B) low suction pressure. C) high head pressure. D) high liquid level. Answer: C - answerThe existence of air in a low pressure system, causes __________. A) Do not siphon refrigerant by mouth. B) Avoid spilling liquid refrigerant on the skin. C) Use gloves and safety goggles when working with liquid refrigerant. D) all of the above Answer: D - answerWhich safety precaution should be adhered to for low pressure systems? A) 60.3F. B) 74.5F. C) 79.7F. D) 80.2F. Answer: B - answerRefrigerant-11 at 14.7 PSIA will boil at about: A) the system was charged with contaminated refrigerant. B) the condenser or chiller barrel tubes are leaking. C) the purge unit is not operating properly. D) the purge unit needs adjustment. Answer: B - answerWhen there is excessive moisture collecting in the purge unit of a low pressure refrigeration system, this indicates that the __________. A) A1 B) B2 C) A2 D) All refrigerant safety groups Answer: D - answerASHRAE Standard 15 - 1994 requires equipment room refrigerant sensors for what safety group classification? A) 21.1" Hg vacuum B) 19.7" Hg vacuum C) 18.1" Hg vacuum D) 16.9" Hg vacuum Answer: D - answerWhen recharging a refrigeration system with R-11, what vapor pressure is necessary in the shells before charging with liquid? A) Immediately disconnect the recycling or recovery equipment and open the system for service. B) Wait for at least a few minutes to see if the system pressure rises, indicating that there is still refrigerant in liquid form or in the oil. C) Immediately break the vacuum with nitrogen and open the system for service. D) Immediately pressurize the system with nitrogen and perform a leak check. Answer: B - answerAfter reaching the required recovery vacuum on a chiller, you should: A) blow all water from the tubes. B) remove any water from the machine. C) vent refrigerant. D) determine if a tube leaks. Answer: D - answerA hydrostatic tube test kit is used to: A) Vapor charging increases pressure slowly, preventing failure of the rupture disk. B) Vapor charging is faster than liquid charging. C) Liquid charging is more difficult to control than vapor charging. D) Liquid charged into a deep vacuum will cause the refrigerant to boil and may lower temperatures enough to freeze the water in the tubes. Answer: D - answerWhen charging a chiller, refrigerant vapor is introduced into the system before charging with liquid. This is because: A) trapped water to freeze. B) trapped oil to freeze. C) trapped refrigerant to freeze. D) valves to freeze. Answer: A - answerWhen evacuating a system, the use of too large a vacuum pump can cause: A) chiller tubes B) shaft seal C) charging connections D) shaft bearings Answer: B - answerOn a low-pressure chiller with an open-type compressor, the ________________ is very susceptible to leaks. A) Leave the purge unit on-line at all times. B) System pressure should be maintained slightly above atmospheric. C) Open the air vents on the condenser. D) Intermittently operate the system with no load. Answer: B - answerWhat steps may be taken to prevent air accumulation into an idle low pressure refrigeration system? A) 5% B) 15% C) 20% D) 35% Answer: D - answerCommercial and industrial process refrigeration systems must be repaired when the leak rate exceeds ______ percent of the charge per year. A) water pumps should be on, and the recovery compressor should be off. B) system water pumps should be on, the recovery compressor should be on, and the recovery condenser water should be off. C) system water pumps, the recovery compressor, and the recovery condenser water should all be on. D) system water pumps should be off, and the recovery compressor should be on. Answer: C - answerWhen recovering vapor from a low pressure refrigeration system the: A) the evaporator B) the condenser C) the compressor intercooler D) the recovery service vessel Answer: A - answerWhere does refrigerant go after it leaves the purge unit of a low pressure centrifugal system? A) top of the condenser. B) compressor oil sump. C) top of the evaporator. D) suction elbow. Answer: A - answerThe purge unit takes its suction from the: A) replacement of an evaporator coil B) replacement of a filter-drier C) replacement of a switch D) replacement of a purge unit Answer: A - answerWhich of the following repairs would ALWAYS be considered "major" under EPA's regulations? A) liquid to absorb excess moisture. B) purge unit to operate. C) system water to freeze. D) refrigerant liquid to freeze. Answer: C - answerCharging refrigerant liquid into a refrigeration system when it is under a 29 inch Hg vacuum can cause the: A) none B) 10 lbs C) 20 lbs D) 100 lbs Answer: D - answerAccording to the EPA, there is approximately _______ refrigerant vapor left in an average 350 ton R- 11 chiller at 0 psig pressure once all the R-11 liquid has been removed? A) a new filter drier has been installed. B) there has been a compressor burnout. C) the unit is not cooling properly. D) recycled refrigerant has been added to the unit. Answer: B - answerAn oil sample should be taken when __________________. A) the purge units remove moisture B) the system operates below atmospheric pressure C) pur

Vista previa del contenido

EPA 608 TYPE III PRACTICE QUESTIONS AND
ANSWERS
A) 2 psig.
B) 5 psig.
C) 10 psig.
D) 15 psig.
Answer: C - answerA typical setting for the high pressure cut-out control on a recovery unit
used for evacuating the refrigerant from a low pressure chiller is:

A) adding compressed air, since it will be removed from the system by the Purging unit.
B) operating the purge system.
C) adding HCFC-22.
D) raising system pressure by heating with circulated hot water or heating blankets.
Answer: D - answerA charged low pressure refrigeration system can be efficiently leak
checked by:

A) low head pressure.
B) low suction pressure.
C) high head pressure.
D) high liquid level.
Answer: C - answerThe existence of air in a low pressure system, causes __________.

A) Do not siphon refrigerant by mouth.
B) Avoid spilling liquid refrigerant on the skin.
C) Use gloves and safety goggles when working with liquid refrigerant.
D) all of the above
Answer: D - answerWhich safety precaution should be adhered to for low pressure systems?

A) 60.3F.
B) 74.5F.
C) 79.7F.
D) 80.2F.
Answer: B - answerRefrigerant-11 at 14.7 PSIA will boil at about:

A) the system was charged with contaminated refrigerant.
B) the condenser or chiller barrel tubes are leaking.
C) the purge unit is not operating properly.
D) the purge unit needs adjustment.
Answer: B - answerWhen there is excessive moisture collecting in the purge unit of a low
pressure refrigeration system, this indicates that the __________.

A) A1
B) B2
C) A2
D) All refrigerant safety groups
Answer: D - answerASHRAE Standard 15 - 1994 requires equipment room refrigerant sensors
for what safety group classification?

A) 21.1" Hg vacuum
B) 19.7" Hg vacuum
C) 18.1" Hg vacuum
D) 16.9" Hg vacuum

, Answer: D - answerWhen recharging a refrigeration system with R-11, what vapor pressure
is necessary in the shells before charging with liquid?

A) Immediately disconnect the recycling or recovery equipment and open the system for
service.
B) Wait for at least a few minutes to see if the system pressure rises, indicating that there is
still refrigerant in liquid form or in the oil.
C) Immediately break the vacuum with nitrogen and open the system for service.
D) Immediately pressurize the system with nitrogen and perform a leak check.
Answer: B - answerAfter reaching the required recovery vacuum on a chiller, you should:

A) blow all water from the tubes.
B) remove any water from the machine.
C) vent refrigerant.
D) determine if a tube leaks.
Answer: D - answerA hydrostatic tube test kit is used to:

A) Vapor charging increases pressure slowly, preventing failure of the rupture disk.
B) Vapor charging is faster than liquid charging.
C) Liquid charging is more difficult to control than vapor charging.
D) Liquid charged into a deep vacuum will cause the refrigerant to boil and may lower
temperatures enough to freeze the water in the tubes.
Answer: D - answerWhen charging a chiller, refrigerant vapor is introduced into the system
before charging with liquid. This is because:

A) trapped water to freeze.
B) trapped oil to freeze.
C) trapped refrigerant to freeze.
D) valves to freeze.
Answer: A - answerWhen evacuating a system, the use of too large a vacuum pump can
cause:

A) chiller tubes
B) shaft seal
C) charging connections
D) shaft bearings
Answer: B - answerOn a low-pressure chiller with an open-type compressor, the
________________ is very susceptible to leaks.

A) Leave the purge unit on-line at all times.
B) System pressure should be maintained slightly above atmospheric.
C) Open the air vents on the condenser.
D) Intermittently operate the system with no load.
Answer: B - answerWhat steps may be taken to prevent air accumulation into an idle low
pressure refrigeration system?

A) 5%
B) 15%
C) 20%
D) 35%
Answer: D - answerCommercial and industrial process refrigeration systems must be
repaired when the leak rate exceeds ______ percent of the charge per
year.

A) water pumps should be on, and the recovery compressor should be off.

Información del documento

Subido en
11 de noviembre de 2024
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TOPDOCTOR
5.0
(1)
Vendido
10
Seguidores
5
Artículos
3387
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes