HCAD 325 Final Exam Questions and Answers

Document preview thumbnail
Vista previa 4 fuera de 37 páginas

HCAD 325 Final Exam Questions and Answers

Vista previa del contenido

HCAD 325 Final Exam




Jose is the supervisor of the laboratory. One of his testing machines seems to be giving different results
for the same sample. To make sure he is delivering correct results, Jose uses a second machine to check
the results of the first. This action represents which cost of quality type?



a. Prevention

b. Internal failure

c. Appraisal

d. External failure - Answer-c. Appraisal



Which of the following is not a common theme found in successful Six Sigma programs?



a. Top management support

b. Use of quantitative measures

c. Use of Taguchi methods

d. Team-based projects - Answer-c. Use of Taguchi methods



The term "Six Sigma" represents what goal?

,a. Six standard deviations from the median

b. 3.4 defects per million opportunities

c. Six defects per million opportunities

d. Sigma level quality - Answer-b. 3.4 defects per million opportunities



Jose, the lab manager, wants to improve the quality in his laboratory with a Six Sigma program. He
wants Sandy, his chemistry supervisor, to attend a Six Sigma training program so that she can oversee all
Six Sigma projects that will occur in the lab. Sandy will be trained as a ______________.



a. master black belt

b. yellow belt

c. green belt

d. black belt - Answer-d. black belt



What is the correct project cycle for a Six Sigma project?



a. Analyze, define, measure, improve, control

b. Measure, define, analyze, improve, control

c. Define, measure, analyze, improve, control

d. Define, improve, analyze, control - Answer-c. Define, measure, analyze, improve, control



What variables are measured in the measurement phase of a Six Sigma project?



a. Process duration, process variability, critical to quality

b. Process input, process output, process duration

c. Process input, process output, critical to quality

,d. Process error rate, process output, process duration - Answer-c. Process input, process output,
critical to quality



Which tool is not part of the analyze phase of a Six Sigma project?



a. Regression analysis

b. Gantt chart

c. Pie chart

d. Bar graph - Answer-b. Gantt chart



Jose is checking his laboratory equipment using test control samples that are designed to give the same
results and are used to calibrate the equipment. When he runs 100 samples, he gets two results that are
greater than 3 standard errors of the mean. These results are called what?



a. 2 sigma quality

b. Special variation

c. Error bars

d. Common variation - Answer-b. Special variation



Jose is measuring the time it takes a technician to do a new test. He expects the test to take no more
than 5 minutes and no less than 3 minutes. After observing a number of tests, he calculates the standard
deviation of the test as 0.3 minutes. What is the process capability of the test?



a. 0.0

b. 1.8

c. 1.1

d. 2.0 - Answer-c. 1.1

, Jose has a new test that has three steps. He calculates that in each step some of the sample must be
discarded. Step 1 has a discard rate of 2 percent, step 2 has a discard rate of 5 percent, and step 3 has a
discard rate of 1 percent. How much of the sample is available after step 3?



a. 82.0 percent

b. 75.5 percent

c. 86.5 percent

d. 99.1 percent - Answer-c. 86.5 percent



What is the primary goal of Lean?



a. Eliminate defects

b. Eliminate waste

c. Improve financial performance

d. Maximize employee productivity - Answer-b. Eliminate waste



Tiffany is the day shift supervisor in the imaging department. She has redesigned the patient intake
system so that patients are only asked their name and birthdate once. The old system asked the patient
this information three times. What type of waste did Tiffany reduce?



a. Waiting

b. Motion

c. Overproduction

d. Overprocessing - Answer-d. Overprocessing

Información del documento

Subido en
7 de noviembre de 2024
Número de páginas
37
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$17.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Zanaya
4.5
(12)
Vendido
78
Seguidores
29
Artículos
10176
Última venta
6 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes