All Geodetic Engineering surveys shall be conducted using ______ - ANSWER
survey grade GNSS receivers
(Geodetic Control Survey)
Project area selected shall be based on the recommendation of
the__________concerned - ANSWER Regional Executive Director (RED)
(Geodetic Control Survey)
Survey Order as defined in Section 15 of DAO No. 2007-29 shall be issued by
the - ANSWER NAMRIA Administrator
A copy of the ________ shall be transmitted to the contractor and shall signal
the start of survey activities - ANSWER Contract with the Notice to Proceed
The date when the contractor received the said documents shall serve as the
official date of - ANSWER Commencement of the Project
(Geodetic Control Survey Party 3 Basic Components)
a.) ________ for general supervision, coordination activities, administrative and
other related matters. - ANSWER Project Main Office
Chief of Party shall be a - ANSWER licensed Geodetic Engineer
(Geodetic Control Survey Party 3 Basic Components)
b.) _______ for data research, computations, cartographic, and other related
activities - ANSWER Office Operations
,Manpower shall include computer literate personnel with knowledge on -
ANSWER GNSS processing software.
(Geodetic Control Survey Party 3 Basic Components)
c.) _____ for reconnaissance, monument setting, observations, and other
related activities. - ANSWER Field Operations
Field Operations are composed of - ANSWER 1) Survey Control Team
2) Reconnaissance and Monument Recovery Team
3) Monument Setting Team
All personnel in the three components mentioned (Geodetic Control Survey)
shall be listed in the proposed - ANSWER Geodetic Control Work Plan
The Geodetic Control Work Plan shall be composed of - ANSWER Project
Management and Technical Plans
The Work Plan with the aforementioned documents together with the sketch
plan of the project site shall be forwarded to the ______ for approval before
the commencement of the project - ANSWER NAMRIA
The approved Work Plan shall form part of the - ANSWER Survey Returns
Composed of:
1.) Geodetic Control Survey Party
2.) Financial Plan
3.) Equipment complement for the project and their corresponding allocation
in the different phases of work, both in the office and in the field.
4.) The estimated duration of the project expressed in number of days as per
, component project activities shall be presented in an Activity Graph, Time
and Motion Diagram, PERT-CPM, etc. - ANSWER Project Management Plan
Composed of:
1.) NAMRIA Topographic Map of the area (used as Base Map)
2.) Estimated number of control points to be established
3.) Proposed leveling measurement activities (if NAMRIA has no available
data of the area) - ANSWER Technical Plan
Using available NAMRIA Topographic Map of the area, the estimated
boundary sketch of the project site shall be plotted on appropriate scale. This
shall be used as the _________ for the Geodetic Network Design. - ANSWER
base map
The individual status of reference points of previously established Geodetic
Control and Project Control Network adjacent to or within the project area
shall be _______,_______ and ________ - ANSWER researched, evaluated and
verified
The corresponding _______ both in the Local and in the Philippine Plane
Coordinate System (PPCS), of the reference point shall be determined -
ANSWER Geographic Position and Plane Coordinates (GPPC)
The network design shall be composed of ________ control points and shall
serve as guide in the conduct of actual ground survey. - ANSWER
COMPLETE SOLUTION
All Geodetic Engineering surveys shall be conducted using ______ - ANSWER
survey grade GNSS receivers
(Geodetic Control Survey)
Project area selected shall be based on the recommendation of
the__________concerned - ANSWER Regional Executive Director (RED)
(Geodetic Control Survey)
Survey Order as defined in Section 15 of DAO No. 2007-29 shall be issued by
the - ANSWER NAMRIA Administrator
A copy of the ________ shall be transmitted to the contractor and shall signal
the start of survey activities - ANSWER Contract with the Notice to Proceed
The date when the contractor received the said documents shall serve as the
official date of - ANSWER Commencement of the Project
(Geodetic Control Survey Party 3 Basic Components)
a.) ________ for general supervision, coordination activities, administrative and
other related matters. - ANSWER Project Main Office
Chief of Party shall be a - ANSWER licensed Geodetic Engineer
(Geodetic Control Survey Party 3 Basic Components)
b.) _______ for data research, computations, cartographic, and other related
activities - ANSWER Office Operations
,Manpower shall include computer literate personnel with knowledge on -
ANSWER GNSS processing software.
(Geodetic Control Survey Party 3 Basic Components)
c.) _____ for reconnaissance, monument setting, observations, and other
related activities. - ANSWER Field Operations
Field Operations are composed of - ANSWER 1) Survey Control Team
2) Reconnaissance and Monument Recovery Team
3) Monument Setting Team
All personnel in the three components mentioned (Geodetic Control Survey)
shall be listed in the proposed - ANSWER Geodetic Control Work Plan
The Geodetic Control Work Plan shall be composed of - ANSWER Project
Management and Technical Plans
The Work Plan with the aforementioned documents together with the sketch
plan of the project site shall be forwarded to the ______ for approval before
the commencement of the project - ANSWER NAMRIA
The approved Work Plan shall form part of the - ANSWER Survey Returns
Composed of:
1.) Geodetic Control Survey Party
2.) Financial Plan
3.) Equipment complement for the project and their corresponding allocation
in the different phases of work, both in the office and in the field.
4.) The estimated duration of the project expressed in number of days as per
, component project activities shall be presented in an Activity Graph, Time
and Motion Diagram, PERT-CPM, etc. - ANSWER Project Management Plan
Composed of:
1.) NAMRIA Topographic Map of the area (used as Base Map)
2.) Estimated number of control points to be established
3.) Proposed leveling measurement activities (if NAMRIA has no available
data of the area) - ANSWER Technical Plan
Using available NAMRIA Topographic Map of the area, the estimated
boundary sketch of the project site shall be plotted on appropriate scale. This
shall be used as the _________ for the Geodetic Network Design. - ANSWER
base map
The individual status of reference points of previously established Geodetic
Control and Project Control Network adjacent to or within the project area
shall be _______,_______ and ________ - ANSWER researched, evaluated and
verified
The corresponding _______ both in the Local and in the Philippine Plane
Coordinate System (PPCS), of the reference point shall be determined -
ANSWER Geographic Position and Plane Coordinates (GPPC)
The network design shall be composed of ________ control points and shall
serve as guide in the conduct of actual ground survey. - ANSWER