• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

OP M choice

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

Exam of 9 pages for the course OP M choice at OP M choice (OP M choice)

Vista previa del contenido

OP M choice Q&A
d. start from here may be on friday test - (correct answer)Which of the following is true
of a p-chart?

a. The lower control limit is found by subtracting a fraction from the average number of
defects.

b. The lower control limit indicates the minimum acceptable number of defects.

c. The lower control limit may be below zero.

d. The lower control limit may be at zero.

e. The lower control limit is the same as the lot tolerance percent defective. d. The lower
control limit may be at zero.


c. - (correct answer)The normal application of a p-chart is in

a. process sampling by variables

b. acceptance sampling by variables

c. process sampling by attributes

d. acceptance sampling by attributes

e. none of the above


b. - (correct answer)The local newspaper receives several complaints per day about
typographic errors. Over a sevenday

period, the publisher has received calls from readers reporting the following number of
errors:

4, 3, 2, 6, 7, 3, and 9. Based on these data alone, what type of control chart(s) should
the publisher

use?

a. p-chart

b. c-chart

c. x -chart

d. R-chart

, e. x - and R-charts



b. - (correct answer)A manufacturer uses statistical process control to control the quality
of the firm's products. Samples

of 50 of Product A are taken, and a defective/acceptable decision is made on each unit
sampled.

For Product B, the number of flaws per unit is counted. What type(s) of control charts
should be
used?

a. p-charts for A and B

b. p-chart for A, c-chart for B

c. c-charts for both A and B

d. p-chart for A, mean and range charts for B

e. c-chart for A, mean and range charts for B



c. - (correct answer)A nationwide parcel delivery service keeps track of the number of
late deliveries (more than 30 minutes past the time promised to clients) per day. They
plan on using a control chart to plot their results. Which type of control chart(s) would
you recommend?

a. x - and R-charts

b. p-charts
c. c-charts

d. x -, but not R-charts
e. both p- and c-charts



d. - (correct answer)A run test is used

a. to examine variability in acceptance sampling plans

b. in acceptance sampling to establish control

c. to examine points in a control chart to check for natural variability

Información del documento

Subido en
31 de octubre de 2024
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
douglasmugwe82
5.0
(1)
Vendido
2
Seguidores
0
Artículos
4215
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes