The purpose of Construction Quality Management is to: - (correct answer)Achieve the
quality established by properly developed requirements through the combined
responsibility, but seperate efforts of contractpr smd government personnel.
Construction Quality Management is the performance of tasks, which ensure that
construction is performed. - (correct answer)According to plans and specifications, on
time, within a defined budget and a safe work environment.
Partnering relationships are based upon: - (correct answer)Building trust and dedication
to common goals
It is the responsibility of Quality Assurance Personnel to: - (correct answer)Periodically
verify that the contractors system of control is working effectively.
An effective contractor quality control program will: - (correct answer)Be an incentive for
work to be done correctly the first time resulting in earlier completion, reduced field
overhead costs, and greater profits.
The success or failure of all contractors is based upon: - (correct answer)The ability to
control costs, finance work, estimate jobs, schedule the work, and maintain effective
quality control.
Quality Assurance Personnel have the responsibility to: - (correct answer)Require
contractors to maintain the quality specified in the plans and specifications.
Inspection is: - (correct answer)The process by which ongoing and completed work is
examined
, During the punch-out inspection of a project: - (correct answer)Quality Assurance
Personnel must assure that the contractor prepares a punch-list and makes corrections.
If there is a disagreement whether the contractors work complies with the contract: -
(correct answer)The government makes the final determination
Characteristics that describe a definable feature of work include: - (correct
answer)Cross-referenced listings to the contractors construction schedule that may
have more than one definable feature under a section of the specifications.
The _____________________ consists of daily checks of the work to assure continuing
compliance with contract requirements. - (correct answer)Follow-up phase
The Quality Assurance Plan: - (correct answer)Is a government management tool
establishing staffing, training, pre-award activities, and surveillance activities.
Testing is extremely important in construction quality management and is performed by:
- (correct answer)Both the contractor and the government
If the contractor does not provide an adequate superintendent, the contract allows the
contracting officer to: - (correct answer)Require the contractor to assume personal
supervision of the work.
The Quality Control Plan: - (correct answer)Is the foundation upon which quality work is
based and outlines planned quality control procedures.
Tests that are unannounced, randomly performed, and repeat quality control tests are: -
(correct answer)Quality Assurance tests
If initial review of the quality control plan shows it to be unacceptable: - (correct
answer)The contractor makes changes before acceptance.
The purpose of Construction Quality Management is to: - (correct answer)Achieve the
quality established by properly developed requirements through the combined
responsibility, but seperate efforts of contractpr smd government personnel.
Construction Quality Management is the performance of tasks, which ensure that
construction is performed. - (correct answer)According to plans and specifications, on
time, within a defined budget and a safe work environment.
Partnering relationships are based upon: - (correct answer)Building trust and dedication
to common goals
It is the responsibility of Quality Assurance Personnel to: - (correct answer)Periodically
verify that the contractors system of control is working effectively.
An effective contractor quality control program will: - (correct answer)Be an incentive for
work to be done correctly the first time resulting in earlier completion, reduced field
overhead costs, and greater profits.
The success or failure of all contractors is based upon: - (correct answer)The ability to
control costs, finance work, estimate jobs, schedule the work, and maintain effective
quality control.
Quality Assurance Personnel have the responsibility to: - (correct answer)Require
contractors to maintain the quality specified in the plans and specifications.
Inspection is: - (correct answer)The process by which ongoing and completed work is
examined
, During the punch-out inspection of a project: - (correct answer)Quality Assurance
Personnel must assure that the contractor prepares a punch-list and makes corrections.
If there is a disagreement whether the contractors work complies with the contract: -
(correct answer)The government makes the final determination
Characteristics that describe a definable feature of work include: - (correct
answer)Cross-referenced listings to the contractors construction schedule that may
have more than one definable feature under a section of the specifications.
The _____________________ consists of daily checks of the work to assure continuing
compliance with contract requirements. - (correct answer)Follow-up phase
The Quality Assurance Plan: - (correct answer)Is a government management tool
establishing staffing, training, pre-award activities, and surveillance activities.
Testing is extremely important in construction quality management and is performed by:
- (correct answer)Both the contractor and the government
If the contractor does not provide an adequate superintendent, the contract allows the
contracting officer to: - (correct answer)Require the contractor to assume personal
supervision of the work.
The Quality Control Plan: - (correct answer)Is the foundation upon which quality work is
based and outlines planned quality control procedures.
Tests that are unannounced, randomly performed, and repeat quality control tests are: -
(correct answer)Quality Assurance tests
If initial review of the quality control plan shows it to be unacceptable: - (correct
answer)The contractor makes changes before acceptance.