What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? - ANSWER-Splicing What should be of major concern when considering surfaces for crane set up locations? - ANSWER-Voids, tanks, loose fill, depressions Which items are included in the suspended weight when calculating parts of line? - ANSWER-Load weight, rigging, load block What site condition must an operator be concerned about prior to setting up a crane? - ANSWER-Soil stability must be sufficient What is an example of duty cycle crane operations? - ANSWER-High speed concrete placement Where must barriers be erected in accessible areas to provide protection in the cranes work area? - ANSWER-Within the equipment's rotating superstructure According to ASME B30.5, How frequently is a crane operator required to have a physical? - ANSWER-Every 3 years What is the result of rapid hoist acceleration? - ANSWER-Produces hook loads higher than actual weight Wire rope lubricant should not: - ANSWER-hinder visual inspection On what principle is crane stability based? - ANSWER-leverage

Vista previa del contenido

NCCCO CORE Exam Questions With
comprehensive, Verified Solutions

What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? -
ANSWER-Splicing



What should be of major concern when considering surfaces for crane set up locations?
- ANSWER-Voids, tanks, loose fill, depressions



Which items are included in the suspended weight when calculating parts of line? -
ANSWER-Load weight, rigging, load block



What site condition must an operator be concerned about prior to setting up a crane? -
ANSWER-Soil stability must be sufficient



What is an example of duty cycle crane operations? - ANSWER-High speed concrete
placement



Where must barriers be erected in accessible areas to provide protection in the cranes
work area? - ANSWER-Within the equipment's rotating superstructure



According to ASME B30.5, How frequently is a crane operator required to have a
physical? - ANSWER-Every 3 years



What is the result of rapid hoist acceleration? - ANSWER-Produces hook loads higher
than actual weight



Wire rope lubricant should not: - ANSWER-hinder visual inspection



On what principle is crane stability based? - ANSWER-leverage

, Who must confirm that an overhead power line is de-energized? - ANSWER-Line owner



The use of equipment to hoist personnel is prohibited except where the employer can
demonstrate what? - ANSWER-Other methods would be more hazardous



Which of the following would not cause the effect of impact loading on the crane?

A. Sudden snatching of the load

B. Rapid hoist acceleration

C. High boom angle operations in windy conditions

D. Graduated lever control application - ANSWER-D. Graduated lever control
application



According to OSHA 1926 subpart cc, How frequently must operational aides be
checked? - ANSWER-Each shift



What is the minimum number of parts of line required to lift a load that weighs 38,588
lbs. ? - ANSWER-4



Which factor is the most important to consider about site access? - ANSWER-
Compaction of approach roads



What is one purpose of the load moment indicator? - ANSWER-To warn the operator of
an overload condition



How are construction site hazards and restrictions located and identified? - ANSWER-A
pre-operational work site inspection



How many calendar days may a crane work with a broken anti two-block devise, after
receipt of the parts? - ANSWER-7

Información del documento

Subido en
21 de octubre de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.69

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Vaster
5.0
(2)
Vendido
5
Seguidores
1
Artículos
847
Última venta
3 meses hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes