Name: Score:


69 Multiple choice questions

Definition 1 of 69
organizations group and manage projects and programs as a portfolio of investments that
contribute to the entire enterprise's success

program


Project procurement management

project charter

project portfolio management

Term 2 of 69
top-down approach

work with project sponsors, the project team, and other people involved in a project to
meet project goals

deals with the day-to-day details of meeting specific goals

unique purpose, temporary,Requires resources, Involves uncertainty


start with the largest items of the project and break them down

Definition 3 of 69
defined by the project team; sometimes referred to as soft logic and should be used with care
since they may limit later scheduling options

Prevention cost


Analogy approach


Discretionary dependencies

Reserve analysis

,Term 4 of 69
Functional Structure

review wbss of similar projects and tailor to your project

functional managers report to the CEO


middle ground between functional and project structures; personnel often report to two or
more bosses; structure can be weak, balanced, or strong matrix


cost incurred to correct an identified defect before the customer receives the product

Term 5 of 69
analogy approach

review WBSs of similar projects and tailor to your project

start with the specific tasks and roll them up

cost Of evaluating processes and their outputs to ensure quality


involve relationships between project and non-project activities

Term 6 of 69
Measurement and test equipment costs

taking steps to enhance opportunities and reduce threats to meeting project objectives

involve relationships between project and non-project activities


capital cost of equipment used to perform prevention and appraisal activities

prioritizing risks based on their probability and impact of occurrence

, Term 7 of 69
Planning risk responses

the art and science of identifying, analyzing, and responding to risk throughout the life of a
project and in the best interests of meeting project objectives

cost incurred to correct an identified defect before the customer receives the product


a description of the work required for the procurement. A SOW is a type of scope statement

taking steps to enhance opportunities and reduce threats to meeting project objectives

Term 8 of 69
Maslow's Hierarchy of Needs

the ratio of actual work completed to the percentage of work planned to have been
completed at any given time during the life of the project or activity


project performance measurement technique that integrates scope, time, and cost data

people's behaviors are guided or motivated by a sequence of needs. Each level of the
hierarchy of needs is a prerequisite for the levels above.

defined by the project team; sometimes referred to as soft logic and should be used with
care since they may limit later scheduling options

Term 9 of 69
Monitoring and controlling risks

capital cost of equipment used to perform prevention and appraisal activities

The project manager and project team members should each prepare. A reflective
statement that documents important things an individual learned from working on the
project. PM combines and creates a project summary report.

prioritizing risks based on their probability and impact of occurrence

monitoring identified and residual risks, identifying new risks, carrying out risk response
plans, and evaluating the effectiveness of risk strategies throughout the life of the project

Información del documento

Subido en
20 de octubre de 2024
Número de páginas
24
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
amzingnurse
4.8
(1570)
Vendido
1576
Seguidores
63
Artículos
3620
Última venta
5 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes