• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 21 páginas
Examen

Nicet Level 2 Study Graded A {2024/2025

Document preview thumbnail
Vista previa 3 fuera de 21 páginas

Nicet Level 2 Study Graded A {2024/2025} What is the Tack coat color distortion when applied? - CORRECT ANSWER Brown to Black What is the Asphalt Compaction Tolerance? - CORRECT ANSWER 1/4" What grade is asphalt considered? - CORRECT ANSWER Open Grade When should asphalt be placed after Tack Coat has been applied? - CORRECT ANSWER Within 4 Hours of the Tack Coat application Where and how should you sample Asphalt? - CORRECT ANSWER From the truck and in 3 increments, each increment from a different quadrant What is a another method of testing Asphalt? - CORRECT ANSWER Coring full de

Vista previa del contenido

Nicet Level 2 Study Graded A {2024/2025}




What is the Tack coat color distortion when applied? - CORRECT
ANSWER Brown to Black


What is the Asphalt Compaction Tolerance? - CORRECT ANSWER 1/4"

What grade is asphalt considered? - CORRECT ANSWER Open Grade

When should asphalt be placed after Tack Coat has been applied? -
CORRECT ANSWER Within 4 Hours of the Tack Coat application


Where and how should you sample Asphalt? - CORRECT ANSWER From
the truck and in 3 increments, each increment from a different
quadrant

What is a another method of testing Asphalt? - CORRECT ANSWER
Coring full depth sections of the roadway and amount is based on
contract or provisions.

How do you test asphalt? - CORRECT ANSWER Asphalt is tested based
on nuclear density gauge

What is the testing tolerance for Density Nuclear gauge? - CORRECT
ANSWER +/- 1% on density and +/-2% on moisture


What is the Asphalt compaction tolerance? - CORRECT ANSWER +/-0.5
percent

What is the Asphalt compaction requirement? - CORRECT ANSWER
95% compaction

,What is the offset of the longitudinal joint for Asphalt - CORRECT
ANSWER Each joint should be offset by 6"


Asphalt Tickets should contain What information - CORRECT ANSWER
Contract Number, Item Number, Job mix formula, Tonnage, Date and
Time

What s the Pavement surface tolerance? - CORRECT ANSWER 1/4"
tolerance

How to measure surface tolerance? - CORRECT ANSWER Straight edge
or string line

How should Asphalt roller pattern begin - CORRECT ANSWER Outside
edges working to center line

How is Asphalt Finished? - CORRECT ANSWER either by compaction or
temp reduction

What do you inspect for surface prep when is come to Concrete
Paving? - CORRECT ANSWER Inspect Sub grade soils and grading
uniformity

What is Concrete paving subbase thickness and characteristics? -
CORRECT ANSWER Thickness of 4-6" and Uniformity, pumping, control
and erosion Resistances

What is the Concrete paving surface coverage? - CORRECT ANSWER
Min of 2"

What is the Min and Max of Dowel overlapping - CORRECT ANSWER 2"
to 6" and 2" of clear cover

How are Tiebars placed and what is the spacing? - CORRECT ANSWER
Drilled into the Slap or placed in the keyway and 1' Spacing

What is the load transfer assemblies spacing - CORRECT ANSWER
Every 15' 1/2"

, What should be placed on forms before concrete placement? -
CORRECT ANSWER Form oil to provide neat edges


What is the Transverse joint spacing? - CORRECT ANSWER Every 4'

When does Concrete pavement curing process begin? - CORRECT
ANSWER Immediately after finishing


How long does concrete pavement take to cure? - CORRECT ANSWER
Minimum of 14 days to achieve compressive strength

What are concrete paving curing methods - CORRECT ANSWER Burlap
(Wet Cure), Liquid Membrane( preferred method)

When can the curing compound be sprayed on concrete surface? -
CORRECT ANSWER immediately after film disappeared


What is the concrete paving finishing tolerance? - CORRECT ANSWER
1/4" for 5' or 1/8th for 10'

How is finishing tolerances tested - CORRECT ANSWER by means of
string line or straight edge.
String line: for alignment and grade
Straight edge: finishing

What are the testing methods of concrete? - CORRECT ANSWER Air:
5.0%, Slump: 3-4" (+/-.5), Temp: Min 40-55 and MAx- 90 degrees

What is the air acceptance? - CORRECT ANSWER +/- 0.5 to 1.5%

What is the purpose of slump test? - CORRECT ANSWER To test
workability of concrete

How long should Longitudinal joints be? - CORRECT ANSWER Should
not exceed 14'

Información del documento

Subido en
17 de octubre de 2024
Número de páginas
21
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$22.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CornelWest
3.7
(269)
Vendido
1680
Seguidores
1131
Artículos
14041
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes