Collecting a representative sample of concrete to be tested is as important as executing the test methods to obtain - answer-Accurate results This practice covers sampling from four types of equipment, which are ___________, ___________, __________, and __________. - answer-stationary mixers, paving mixers, revolving truck mixers, continuous mixers The elapsed time between obtaining the first and final portions of a composite sample shall not exceed - answer-15 min Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - answer-True, need to recombine Start the tests for slump, temp, and air content within ______ after obtaining the final portion of the composite sample? - answer-5 min Start molding specimens for strength tests within ______ after fabricating the composite sample? - answer-15 min The concrete sample must be protected from contamination and - answer-Evaporation The minimum size sample for making strength test specimens is - answer-1 cf When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - answer-2 When sampling from a paving mixer, obtain samples from at least ______ different portions of the pile and combine them into one composite sample for test purposes. - answer-5 When sampling from a revolving drum truck mixer, sample the concrete by collecting _____ or more portions taken at regularly spaced intervals during discharge of the middle portion of this batch. - answer-2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - answer-False When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be _____ _____ before making the test. - answer-Wet Screened The stem of the thermometer is submerged a minimum of ______ into the freshly mixed concrete. - answer-3 in The thermometer shall be capable of accurately measuring the temperature of freshly mixed concrete to ______ throughout a range of ______. - answer-+/- 1 F, 30-120 F The thermometer shall be verified within ______ - answer-at least 1 year of current use The temperature of concrete may be measured in a wheelbarrow. True or False? - answer-True The temperature of concrete may be measured in a wall form. True or False? - answer-True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True or False? - answer-False What must be done to the sample container prior to sampling the concrete? - answer-Dampened What must be done to the concrete surrounding the thermometer after the device is submerged in the fresh concrete? - answer-Push concrete around the steam to ensure the concrete is in full contact with the stem. How long must the thermometer remain in the freshly mixed concrete? - answer-2-5 min After the temp of the concrete is read, what is then required? - answer-Record temp The temperature of the concrete is recorded to the nearest - answer-full degree There is a specified maximum temp of freshly mixed concrete. True or False? - answer-False The sample of concrete used for temp determination must be rodded 25 times. True or False? - answer-False When the concrete contains aggregate larger than allowed for the slump test, the large aggregate must be _____. - answer-Wet screened through 1-1/2 in sieve The mold for making the slump test is in the shape of _____. - answer-Frustum of a cone The height of the slump mold is - answer-12 in The interior surface of the slump mold is allowed to have minor irregularities. True or False? - answer-False For use in the slump test, the end or both ends of the tamping rod must be _____. - answer-Rounded to a hemispherical tip The slump mold should be in a dry condition before beginning the test. True or False? - answer-False, needs to be dampened The surface on which the slump mold will be placed must be - answer-Flat, level, dampened, and rigid The slump mold is filled in _____ layers. - answer-3 Each layer should fill approximately _____ the volume of the mold. - answer-1/3 Rod each layer ___ times uniformly over the cross section with the rounded end of the rod. - answer-25 How deep should the tamping rod penetrate into each layer? - answer-Rod each layer throughout its depth; on the second and third rod should penetrate previous 1 in What must be done if the concrete drops below the top of the slump mold while the top layer is being rodded? - answer-Stop, add more concrete, continue rodding at stopped number Prior to lifting the mold, concrete must be removed from _____. - answer-bottom of the mold, to create a clean surface After the final rodding, the sides of the slump mold should should be tapped lightly with the tamping rod. True or False? - answer-False When raising the slump mold, it should not be rotated or twisted, True or False? - answer-True, vertical How much time is allowed for lifting the slump mold? - answer-5 sec +/- 2 sec The measurement for slump is made from the top of the mold to what point of the concrete specimen? - answer-To the original displaced center of the top surface The slump of the concrete is measured and reported to the nearest - answer-1/4 in How much time is allowed to conduct the slump test from beginning to completion? - answer-2 1/2 min The length of the tamping rod used in this test method is (UW) - answer-at least 4 in more than the measure but no more than 24 in overall length What is the required shape of the tamping end of the rod - answer-Rounded to hemispherical tip What is the required minimum frequency of the vibrator used in this test method? (UW) - answer-9000 VPM The outside diameter or side dimension of the vibrating element must be at least _____ but not greater than _____. - answer-.75 in, 1.5 in What material is the measure made of? - answer-Typically metal What is the minimum thickness of a metal strike-off plate? - answer-1/4 in What is the minimum thickness of a glass or acrylic strike off plate? - answer-1/2 in What is the specified weight of the mallet used on measures that are 1/2 cf or sm

Vista previa del contenido

ACI STUDY QUESTIONS AND ANSWER
Collecting a representative sample of concrete to be tested is as important as
executing the test methods to obtain - answer-Accurate results

This practice covers sampling from four types of equipment, which are ___________,
___________, __________, and __________. - answer-stationary mixers, paving mixers,
revolving truck mixers, continuous mixers

The elapsed time between obtaining the first and final portions of a composite
sample shall not exceed - answer-15 min

Portions of a composite sample shall be thoroughly remixed bfore beginning tests
on the sample. True of False? - answer-True, need to recombine

Start the tests for slump, temp, and air content within ______ after obtaining the
final portion of the composite sample? - answer-5 min

Start molding specimens for strength tests within ______ after fabricating the
composite sample? - answer-15 min

The concrete sample must be protected from contamination and - answer-
Evaporation

The minimum size sample for making strength test specimens is - answer-1 cf

When sampling from a stationary mixer, the batch must be sampled at _____ or
more regularly spaced intervals during discharge of the middle portion of the batch
- answer-2

When sampling from a paving mixer, obtain samples from at least ______ different
portions of the pile and combine them into one composite sample for test purposes.
- answer-5

When sampling from a revolving drum truck mixer, sample the concrete by
collecting _____ or more portions taken at regularly spaced intervals during
discharge of the middle portion of this batch. - answer-2

Concrete samples from a truck mixer must be obtained before any water or
admixtures are added to the mixer at the job site. True or False? - answer-False

When the concrete contains aggregate larger than that permitted for a particular
test method, the sample of concrete must be _____ _____ before making the test. -
answer-Wet Screened

The stem of the thermometer is submerged a minimum of ______ into the freshly
mixed concrete. - answer-3 in

, The thermometer shall be capable of accurately measuring the temperature of
freshly mixed concrete to ______ throughout a range of ______. - answer-+/- 1 F, 30-
120 F

The thermometer shall be verified within ______ - answer-at least 1 year of current
use

The temperature of concrete may be measured in a wheelbarrow. True or False? -
answer-True

The temperature of concrete may be measured in a wall form. True or False? -
answer-True

A composite sample of concrete is required even if the only purpose for obtaining
the sample is to determine temperature. True or False? - answer-False

What must be done to the sample container prior to sampling the concrete? -
answer-Dampened

What must be done to the concrete surrounding the thermometer after the device is
submerged in the fresh concrete? - answer-Push concrete around the steam to
ensure the concrete is in full contact with the stem.

How long must the thermometer remain in the freshly mixed concrete? - answer-2-5
min

After the temp of the concrete is read, what is then required? - answer-Record temp

The temperature of the concrete is recorded to the nearest - answer-full degree

There is a specified maximum temp of freshly mixed concrete. True or False? -
answer-False

The sample of concrete used for temp determination must be rodded 25 times. True
or False? - answer-False

When the concrete contains aggregate larger than allowed for the slump test, the
large aggregate must be _____. - answer-Wet screened through 1-1/2 in sieve

The mold for making the slump test is in the shape of _____. - answer-Frustum of a
cone

The height of the slump mold is - answer-12 in

The interior surface of the slump mold is allowed to have minor irregularities. True
or False? - answer-False

For use in the slump test, the end or both ends of the tamping rod must be _____. -
answer-Rounded to a hemispherical tip

Información del documento

Subido en
16 de octubre de 2024
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$9.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TOPDOCTOR
5.0
(1)
Vendido
10
Seguidores
5
Artículos
3387
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes