NPDES - Answer✔✔-National Pollution Discharge Elimination System
NPDES Exemptions - Answer✔✔-Facility that discharges to a POTW
Facility that allows discharge evaporation
Facility that allows infiltration/percolation
Waters of the United States (WOTUS) - Answer✔✔-Any of the following that could be used:
1) Wetlands,
2) Sloughs
3) Prairie pothohles
4) Wet meadows
5) Playa lakes
6) Natural ponds
Phase II Discharges - Answer✔✔-Commercial, Retail, light industrial and institutional activity
Construction activities under 5 acres
Municipal separate storm water drain system for less than 100,000.
Page 1/9
, EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024.
Phase II Discharge Exempted Activities - Answer✔✔-Agricultural Discharges
Discharges from Oil and Gas operations
Silviculture Activities
NOI - Answer✔✔-Notice of intent, names general operator and site information
SWPPP - Answer✔✔-Storm Water Pollution Prevention Plan
BMP - Answer✔✔-Best Management Practice
NOT - Answer✔✔-Notice of Termination
Submitted after site stabilization
Rainfall Erosivity Factor (R) - Answer✔✔-
TMDL - Answer✔✔-Total Maximum Daily Load
Construction rainfall erosivity waiver - Answer✔✔-Waver for runnoff permit requirement if
certain dry conditions permit.
SWMP - Answer✔✔-Stormwater Management Plan
MEP - Answer✔✔-Maximum extent practicable
Six Minimum Measures for NPEDS - Answer✔✔-1) Public Education and Outreach
2) Public Participation and Involvement
3) Illicit Discharge Detection and Elimination
Page 2/9