CPESC Exam Study Guide with Complete Solutions NPDES - Answer-National Pollution Discharge Elimination System NPDES Exemptions - Answer-Facility that discharges to a POTW Facility that allows discharge evaporation Facility that allows infiltration/percolation Waters of the United States (WOTUS) - Answer-Any of the following that could be used: 1) Wetlands, 2) Sloughs 3) Prairie pothohles 4) Wet meadows 5) Playa lakes 6) Natural ponds Phase II Discharges - Answer-Commercial, Retail, light industrial and institutional activity Construction activities under 5 acres Municipal separate storm water drain system for less than 100,000. EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 2/9 Phase II Discharge Exempted Activities - Answer-Agricultural Discharges Discharges from Oil and Gas operations Silviculture Activities NOI - Answer-Notice of intent, names general operator and site information SWPPP - Answer-Storm Water Pollution Prevention Plan BMP - Answer-Best Management Practice NOT - Answer-Notice of Termination Submitted after site stabilization Rainfall Erosivity Factor (R) - Answer- TMDL - Answer-Total Maximum Daily Load Construction rainfall erosivity waiver - Answer-Waver for runnoff permit requirement if certain dry conditions permit. SWMP - Answer-Stormwater Management Plan MEP - Answer-Maximum extent practicable Six Minimum Measures for NPEDS - Answer-1) Public Education and Outreach 2) Public Participation and Involvement 3) Illicit Discharge Detection and Elimination EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 3/9 4) Construction Site Runnoff 5) Post-Construction Runoff Control 6) Pollution Prevention/Good housekeeping Triennial Review Process - Answer-Required for states every three years to evaluate their water quality standards. TMDL - Answer-Section 303(d) CWA; establishes loading factors for discharges to watersheds. 303(d) list - Answer-a list of impaired waters, too damaged for use (swimming) and is reissued every two years. Not expected to meet water quality standards Construction Site NTU Monitoring - Answer-Sites larger than 10 ac must have NTU discharge less than 280 except after a 2yr 24hr storm max. Six (6) Planning Stages for stormwater Planning for Construction - Answer-1) Site evaluation and design development 2) Assessment 3) Control selection and plan design 4) Certification and notification 5) Construction implementation

Vista previa del contenido

EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024.




CPESC Exam Study Guide with
Complete Solutions

NPDES - Answer✔✔-National Pollution Discharge Elimination System


NPDES Exemptions - Answer✔✔-Facility that discharges to a POTW


Facility that allows discharge evaporation


Facility that allows infiltration/percolation


Waters of the United States (WOTUS) - Answer✔✔-Any of the following that could be used:


1) Wetlands,


2) Sloughs


3) Prairie pothohles


4) Wet meadows


5) Playa lakes


6) Natural ponds


Phase II Discharges - Answer✔✔-Commercial, Retail, light industrial and institutional activity


Construction activities under 5 acres


Municipal separate storm water drain system for less than 100,000.

Page 1/9

, EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024.



Phase II Discharge Exempted Activities - Answer✔✔-Agricultural Discharges


Discharges from Oil and Gas operations


Silviculture Activities


NOI - Answer✔✔-Notice of intent, names general operator and site information


SWPPP - Answer✔✔-Storm Water Pollution Prevention Plan


BMP - Answer✔✔-Best Management Practice


NOT - Answer✔✔-Notice of Termination


Submitted after site stabilization


Rainfall Erosivity Factor (R) - Answer✔✔-


TMDL - Answer✔✔-Total Maximum Daily Load


Construction rainfall erosivity waiver - Answer✔✔-Waver for runnoff permit requirement if

certain dry conditions permit.


SWMP - Answer✔✔-Stormwater Management Plan


MEP - Answer✔✔-Maximum extent practicable


Six Minimum Measures for NPEDS - Answer✔✔-1) Public Education and Outreach


2) Public Participation and Involvement


3) Illicit Discharge Detection and Elimination

Page 2/9

Información del documento

Subido en
15 de octubre de 2024
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Emillect
3.0
(4)
Vendido
34
Seguidores
2
Artículos
2999
Última venta
4 meses hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes