QUESTIONS AND ANSWERS
If unused mortar stiffens due to hydration of cement, what must you do? - ANSWER:
Discard the mortar

What minimum time must you wait before caulking or grouting new tiles? -
ANSWER: 24-48 Hours

How long should you wait before installing tile on a shower pan? - ANSWER: 24
Hours

Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive
strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: -
ANSWER: Type-B Soils

If 65 street lights are fed by a 2275 volt series circuit, what is the voltage across each
light? - ANSWER: 35V

In a series circuit, the total voltage is divided equally.

For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in
Type-B soil is: - ANSWER: 1:1 (45°)

A Pittsburgh joint is used in: - ANSWER: HVAC ductwork

The drain for a pressure relief valve on a water heater should be extended to: -
ANSWER: The outside of the building

What is the minimum slope toward the drain of a shower pan? - ANSWER: 1/4" per
foot (2%)

What is the diameter of #3 rebar? - ANSWER: 3/8"

If a vendor fails to provide an MSDS, you have the right to call: - ANSWER: Cal/OSHA
or DOSH

When installing a door jamb, you need shims at: - ANSWER: Both hinge and strike
sides, three on each side.

Which of the following is used to adhere vinyl floors?

A. Epoxy cement
B. Asphalt mastic
C. Latex primer

,D. White glue - ANSWER: Epoxy cement

When do you need bracing for a drywall wall? - ANSWER: Diagonal bracing is needed
every 25' for any drywall wall.

How should you clear the roots from a construction site? - ANSWER: Clear roots to
12" below grade.

Dividing watts by amps gives you: - ANSWER: Volts

The most frequent on-the-job roofing accidents are: - ANSWER: Falls

Which of the following is NOT a type of wood block flooring?

A. Parquet
B. Wood Mosaic
C. Wood Tile
D. All of the above. - ANSWER: Wood tile

Lightweight concrete is best used for:

A. Curb and Gutter
B. Second floor decking
C. First floor slab on grade
D. Footings - ANSWER: Second floor decking

The tool used to carry grout needed to patch a small hole is a:

A. Hawk
B. Poling board
C. Spot board
D. Mason's scutch - ANSWER: Spot Board

Which pipe is NOT appropriate for industrial wastes?

A. Cast iron
B. Schedule 40 ABS DWV
C. Extra strength vitrified clay
D. Copper - ANSWER: Copper

Where do you need a fire wall?

A. Between a living room and a bedroom
B. Between a bedroom and a bathroom
C. Between a kitchen and a bath
D. A separation wall between a dwelling and an attachment - ANSWER: A separation
wall between a dwelling and an attachment.

,What is the minimum clearance between rough ground and untreated subfloor
joists? - ANSWER: 18 inches

Who may remove asbestos? - ANSWER: Contractor with Asbestos Certification on
license.

Which of the following is NOT likely to be found in significant proportions in granular
soil?

A. Gravel
B. Sand
C. Silt
D. Clay - ANSWER: Clay

Stiles and rails are used on which of the following?

A. Furred walls
B. Roofs
C. Windows
D. Slabs - ANSWER: Windows.

A stile is the vertical edges of the window and the rails are the bottom and top.

What does a high slump test indicate? - ANSWER: Too much water.

Metal concrete forms should be?

A. Oiled
B. Watered
C. Placed against gravel
D. Discarded after each use - ANSWER: Oiled

What does the R mean in a description of insulation? - ANSWER: Resistance

What kind of door would you install for someone with a disability?

A. Automatic with minimum of 3 seconds to close
B. Automatic with maximum of 5 seconds to open
C. Manual with maximum of 8.5 pounds to operate
D. Either A or C - ANSWER: Either A or C

Triple-walled metal chimney installations are regulated by: - ANSWER: ICC

ICC-IBC-IRC is the international code council. IBC is international building code
commercial. IRC is the international residential code.

, If you are a general contractor, you should call a specialty contractor when: -
ANSWER: You encounter an unfamiliar trade.

When a stairway serves a public building, what is the minimum number of steps for
which a handrail is required? - ANSWER: Two

What is the minimum underlayment for asphalt shingles? - ANSWER: 15 pounds

How long should you wait before sealing new tile work? - ANSWER: 2 weeks

When do you install insulation? - ANSWER: After the electrical and plumbing are
approved.

When do you NOT need an exhaust fan in a bathroom? - ANSWER: When there is a
window in the bathroom.

What is a bush-hammer used for? - ANSWER: Roughen surface of hardened
concrete.

When you say a wall is perfect it is: - ANSWER: Both plumb and straight.

The purpose of a batter board in concrete work is: - ANSWER: Support layout strings
when location foundations.

What is the difference between a hip jack rafter and a common rafter? - ANSWER: A
hip jack runs from the top plate to a hip rafter, but a common rafter runs to the ridge
board.

When should you float a concrete surface? - ANSWER: As soon as the water sheen
evaporates

When installing drywall screws you should:

A. Countersink
B. Drive just below the face of the board
C. Leave slightly above the surface
D. Use the highest torque setting - ANSWER: Drive just below the face of the board
without breaking the paper.

Before placing tile with mastic, you should: - ANSWER: Seal the surface.

At an excavation, an Underground Service Alert (U.S.A) marking on the dirt that uses
red paint or chalk means: - ANSWER: Electric power

How many diameters is the minimum lap (overlap) between sections of rebar in
reinforced masonry?

Libro relacionado
 image
Editorial: 2016 ISBN: 9781530838523 Edición: Desconocido

Información del documento

Subido en
11 de octubre de 2024
Número de páginas
31
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
1
Seguidores
0
Artículos
760
Última venta
9 meses hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes