• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 12 páginas
Examen

Cdfm Module 4 Exam

Document preview thumbnail
Vista previa 2 fuera de 12 páginas

Exam study book Evolutionary Acquisition of Mark A. Lorell, Julia Lowell, Obaid Younossi - ISBN: 9780833038821 (CDFM MODULE 4 EXAM)

Vista previa del contenido

CDFM MODULE 4 EXAM REAL EXAM 210 QUESTIONS AND
CORRECT ANSWERS(DETAILED ANSWERS)
What is JCIDS (Joint Capabilities Integration and Development System)? - ANSWER:
assesses gaps in military joint warfighting capabilities and recommends solutions to
resolve these gaps

Defense Acquisition System - ANSWER: Process by which DoD acquires weapon
systems and automated information systems

What document provides entry into Milestone A the the Defense Acquisition
System? - ANSWER: Materiel Development Decision

What are the two steps in pre-systems acquisition? - ANSWER: Materiel solution
analysis and technology development

Which milestone is the program initiation? - ANSWER: Milestone B

The MDA may authorize entry into the acquistion system at any point? True or False
- ANSWER: True

What are the most expensive programs? - ANSWER: ACAT IA

Who is the single point of accountability for accomplishing program objectives? -
ANSWER: program manager

What says the DOD may not obligate funds for a major defense acquisition program
after the program enters the Engineering and Manufacting phase? - ANSWER: 10
USC 2435

What is systems engineering? - ANSWER: overarching process that a program team
applies to transition from a stated capability need to an operationally suitable
system. It is the integrating mechanism across the technical efforts

Program managers prepare a _________ for each milestone review, beginning with
Milestone A. - ANSWER: Systems Engineering Plan (SEP)

Integrated Product and Process Development (IPPD) is - ANSWER: mgmt technique
that simultaneously integrates all essential acquisition activities through the use of
multidisciplinary teams to optimize design, manufacturing and supportability
processes.

What are the 3 levels of IPT's - ANSWER: Overachring Integrated Product Team
(OIPT) that oversees entire program, Integrateing Integrated Product Team (IIPT),
and Working Level Integrated Product Team (WIPT) that advise the PM

, What are the 8 technical management processes? - ANSWER: 1. Decision Analysis 2.
Technical Planning 3. Technical Assessment 4. Requirements Management 5. Risk
Management 6. Configuration Management 7. Data Management 8. Interface
Management

What is decision analysis? - ANSWER: provide the basis for evaluating and selecting
alternatives

SEP is a mandated tool for this activity - ANSWER: Technical planning

_______ measures technical progress and the effectiveness of plans and
requirements - ANSWER: technical assessment

What maintains the traceability of all requirements from needs? - ANSWER:
requirements management

_________ is an audit trail of decisions and design modifications - ANSWER:
configuration management

What answers the question of "did you build it right"? - ANSWER: verification

What answers "is this the right solution"? - ANSWER: validation

What is a system of system engineering? - ANSWER: satisfy capabilities thru multiple
and interacting systems. Not to be confused with a "family of systems"

What is the formal entry point into the acquisition process? - ANSWER: Material
Solution Analysis Phase

What is not a decision point but opens the gate if all criteria has been met? -
ANSWER: MDA

Which pases enters approved ICD and study guidance for conducting AOA and is
guided by ICD and AOA plan? - ANSWER: materiel solution analysis phase

Which phase reduces technology risks, determine and mature the appropriate set of
technologies to be integrated into a full system and to demonstrate critical
technologies on prototypes? - ANSWER: technology development phase

The MDA for an MDAP, without the authority to delegate, shall sign a certification
memorandum for record prio to ______________? - ANSWER: Milestone A

What follows the completion of technology development? - ANSWER: Milestone B
decision

Libro relacionado
 image
Mark A. Lorell, Julia Lowell, Obaid Younossi Evolutionary Acquisition
Editorial: 2006 ISBN: 9780833038821 Edición: Desconocido

Información del documento

Subido en
11 de octubre de 2024
Número de páginas
12
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
2
Seguidores
0
Artículos
760
Última venta
3 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes