AZ ROC Final Exam Questions And All Complete Answers

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

20 days - Answer Deadline for filing preliminary 20-day notice (late notices are only effective for up to 20 days before filing). A.R.S. § 33-981 60 days - Answer Deadline to file a lien after a "notice of completion" is filed. A.R.S. § 33-993(A) 120 days - Answer Deadline to file a lien after "completion," if a notice of completion is not filed. A.R.S. § 33-993(A 6 months - Answer Deadline for enforcing a lien (by filing a lawsuit). 10 days - Answer Deadline to dispute a lien after notice of owner's intent to retain payment for the lien from payment to the contractor. A.R.S. § 33-994 20 days - Answer Deadline for releasing a lien that has been paid in full or following written request, to avoid owing penalties and damages. A.R.S. § 33-1006 a contractor license is required when the total cost, including materials is more than - Answer $1000 which state agency has the authority to issue a contractor license - Answer ROC what is the role of the ROC - Answer ALL OF THE ABOVE if you have a B- general license which of the items below must be subcontracted ? - Answer all of the above -repairing an hvac

Vista previa del contenido

AZ ROC Final Exam Questions And All
Complete Answers.
20 days - Answer Deadline for filing preliminary 20-day notice (late notices are only effective for up to
20 days before filing). A.R.S. § 33-981



60 days - Answer Deadline to file a lien after a "notice of completion" is filed. A.R.S. § 33-993(A)



120 days - Answer Deadline to file a lien after "completion," if a notice of completion is not filed. A.R.S.
§ 33-993(A



6 months - Answer Deadline for enforcing a lien (by filing a lawsuit).



10 days - Answer Deadline to dispute a lien after notice of owner's intent to retain payment for the lien
from payment to the contractor. A.R.S. § 33-994



20 days - Answer Deadline for releasing a lien that has been paid in full or following written request, to
avoid owing penalties and damages. A.R.S. § 33-1006



a contractor license is required when the total cost, including materials is more than - Answer $1000



which state agency has the authority to issue a contractor license - Answer ROC



what is the role of the ROC - Answer ALL OF THE ABOVE



if you have a B- general license which of the items below must be subcontracted ? - Answer all of the
above



-repairing an hvac

, -installing a pool



-wiring a homes electrical circuit



which of the following commercial license classifications is permitted to subcontract electical work -
Answer B-1 General Commercial Contractor



A B- general residential contractor must subcontract what type of work - Answer electrical, boilers, and
water wells



what business type is eligible for a contractor license - Answer llc, sole prop, and partnership



a new qualifying party must have at least two years of experience performing or supervising the type of
work covered by a license within the last - Answer 10 years



a military spouse who is relocating to arizona may waive the trade exam if they have had a license in a
comparable classification for: - Answer 1 year



a person who has been convicted of contracting without a license is barred from being part of a license
application for: - Answer 1 year



one person may act as the qualifying party for up to two licensees if he owns at least _________ of each
entity - Answer 25%



if the qualifying party stops working for the licensee, the licensee and the qualifying party must notify
the ROC within _____ - Answer 15 days



if a qualifying party dissasociates with the licensee, the licensee must requalify with a new party in -
Answer 60 days



once the application has been submitted a license app and paid the fees the ROC must return, deny, or
approve an app in_____ - Answer 60 days

Información del documento

Subido en
8 de octubre de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
COCOSOLUTIONS
4.1
(39)
Vendido
236
Seguidores
16
Artículos
9903
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes