• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

SAFe Scrum Master 5.1 Study Guide with Complete Solutions

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

SAFe Scrum Master 5.1 Study Guide with Complete Solutions During PI planning who owns the planning of stories into iterations? - Answer-Agile teams Who commits to the Iteration goals at the end of Iteration planning? - Answer-Team Becoming a coach requires a shift from old behaviors to new ones. What are three examples of old behaviors? - Focusing on deadlines - Focusing on business value delivery - Asking the team for the answers - Driving toward specific outcomes - Fixing problems for the team - Facilitating team problem solving - Answer-Not sure which 3 What are 2 critical areas that differentiate agile from the waterfall development - Answer- incremental delivery of value and fast feedback Which type of enabler does a System Architect review during a System Demo? -enabler epics EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED FIRST PUBLISH SEPTEMBER 2024 Page 2/6 -enabler stories -enabler features -enabler capabilities - Answer-not sure Why do teams have an iteration Retrospective? - Answer-To Adjust and identify ways to improve Which demo is performed in the IP iteration - Answer-The PI System Demo What are two good scrum master facilitation practices - Answer-Create an environment of safety so that everyone feels comfortable contributing to the discussion Ensure all voices are heard Each PI planning meeting evolves over time, and ending PI planning with a Retrospective will help to do what? - Answer-Continuously Improve the event The business must depend on the team for what in order to do any meaningful planning - Answer- Commitment to the plan What is the purpose of the plan-do-check-adjust cycle as applied to iterations -to give the art team members a process tool to keep the train on the tracks -to create a continuous flow of work to support the delivery pipeline (not this one) -to provide a regular, predictable development cadence to

Vista previa del contenido

EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024




SAFe Scrum Master 5.1 Study Guide with
Complete Solutions

During PI planning who owns the planning of stories into iterations? - Answer✔✔-Agile teams


Who commits to the Iteration goals at the end of Iteration planning? - Answer✔✔-Team


Becoming a coach requires a shift from old behaviors to new ones. What are three examples of old

behaviors?




- Focusing on deadlines


- Focusing on business value delivery


- Asking the team for the answers


- Driving toward specific outcomes


- Fixing problems for the team


- Facilitating team problem solving - Answer✔✔-Not sure which 3


What are 2 critical areas that differentiate agile from the waterfall development - Answer✔✔-

incremental delivery of value and fast feedback


Which type of enabler does a System Architect review during a System Demo?


-enabler epics


Page 1/6

, EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024


-enabler stories


-enabler features


-enabler capabilities - Answer✔✔-not sure


Why do teams have an iteration Retrospective? - Answer✔✔-To Adjust and identify ways to improve


Which demo is performed in the IP iteration - Answer✔✔-The PI System Demo


What are two good scrum master facilitation practices - Answer✔✔-Create an environment of safety so

that everyone feels comfortable contributing to the discussion


Ensure all voices are heard


Each PI planning meeting evolves over time, and ending PI planning with a Retrospective will help to do

what? - Answer✔✔-Continuously Improve the event


The business must depend on the team for what in order to do any meaningful planning - Answer✔✔-

Commitment to the plan


What is the purpose of the plan-do-check-adjust cycle as applied to iterations


-to give the art team members a process tool to keep the train on the tracks


-to create a continuous flow of work to support the delivery pipeline (not this one)


-to provide a regular, predictable development cadence to produce an increment of value


-to allow the team to perform some final backlog refinement for upcoming iteration planning -

Answer✔✔-not sure



Page 2/6

Información del documento

Subido en
7 de octubre de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EmillyCharlotte
3.6
(34)
Vendido
155
Seguidores
5
Artículos
12350
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes