BICSI TECHNICIAN EXAM QUESTIONS AND
CORRECT ANSWERS
L Rating - Answer A firestops ability to provide a smoke stop. (air leakage rate)
To prevent the damage of cable jacket, how often must you securely fasten electrical
nonmetallic tubing (ENT) - Answer 3 Feet so it does not damage the cable
What is the minimum dedicated power requirement of a telecommunications enclosure -
Answer 120 V ac/20
The clearance behind the PBB when mounted, should be no less than- - Answer 2inch
clearance behind the PBB when mounted
When installing a plywood backboard, you should use galvanized screws that are a
minimum of ______ longer than the depth of the wall covering, including the plywood -
Answer 0.5in
Application of under carpet telecommunications cable shall be limited to: - Answer The
transition point, TP, is an inter-connection point between horizontal cabling and UTC
Any one conduit segment is allowed to have a maximum of two 90-degree bends. A third
bend may be possible depending on circumstances - Answer Installation runs less than
33 feet
While installing racks and cabinets on an access floor, what must they be attached to? -
Answer To the frame
When installing cabinets on an access floor, how are the cabinets aligned? - Answer
, One edge flush with the floor tile cut line
A telecommunications enclosure TE may be utilized for what purpose? - Answer May be
used to provide a suitable option for moves, adds, and changes without compromising
infection control measures and other restrictions
What diameter threaded rod would you typically use for a heavy-duty ladder rack
installation? - Answer 5/8in
A supplemental bonding network in an ER or data center comprising a group of
conductors arranged in a grid is usually related to what? - Answer Access flooring
Which style of anchor requires that a hole be drilled in the floor where attachment is to
be made? - Answer Expansion anchors
Min seperation from electric motors and transformers? - Answer 48"
What stage of project will you determine the labeling requirements for cables? - Answer
Pre-construction Phase
What document contains the original floor plans with the actual installed outlet
locations, cables, length, and firestopping materials? - Answer Record drawings
What document does a project use to request an explanation, additional information, or
approval of material substitution? - Answer RFI
Comparing design documents with existing conditions, verification of parking access,
and determination of the work hours are examples of what you would learn during -
Answer A job start
T1 - Answer Layout of complete building per floor; serving zone boundaries, backbone
CORRECT ANSWERS
L Rating - Answer A firestops ability to provide a smoke stop. (air leakage rate)
To prevent the damage of cable jacket, how often must you securely fasten electrical
nonmetallic tubing (ENT) - Answer 3 Feet so it does not damage the cable
What is the minimum dedicated power requirement of a telecommunications enclosure -
Answer 120 V ac/20
The clearance behind the PBB when mounted, should be no less than- - Answer 2inch
clearance behind the PBB when mounted
When installing a plywood backboard, you should use galvanized screws that are a
minimum of ______ longer than the depth of the wall covering, including the plywood -
Answer 0.5in
Application of under carpet telecommunications cable shall be limited to: - Answer The
transition point, TP, is an inter-connection point between horizontal cabling and UTC
Any one conduit segment is allowed to have a maximum of two 90-degree bends. A third
bend may be possible depending on circumstances - Answer Installation runs less than
33 feet
While installing racks and cabinets on an access floor, what must they be attached to? -
Answer To the frame
When installing cabinets on an access floor, how are the cabinets aligned? - Answer
, One edge flush with the floor tile cut line
A telecommunications enclosure TE may be utilized for what purpose? - Answer May be
used to provide a suitable option for moves, adds, and changes without compromising
infection control measures and other restrictions
What diameter threaded rod would you typically use for a heavy-duty ladder rack
installation? - Answer 5/8in
A supplemental bonding network in an ER or data center comprising a group of
conductors arranged in a grid is usually related to what? - Answer Access flooring
Which style of anchor requires that a hole be drilled in the floor where attachment is to
be made? - Answer Expansion anchors
Min seperation from electric motors and transformers? - Answer 48"
What stage of project will you determine the labeling requirements for cables? - Answer
Pre-construction Phase
What document contains the original floor plans with the actual installed outlet
locations, cables, length, and firestopping materials? - Answer Record drawings
What document does a project use to request an explanation, additional information, or
approval of material substitution? - Answer RFI
Comparing design documents with existing conditions, verification of parking access,
and determination of the work hours are examples of what you would learn during -
Answer A job start
T1 - Answer Layout of complete building per floor; serving zone boundaries, backbone