Lean Tools and Techniques

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

8 wastes of Lean - answer-Defects, Overproduction, Waiting, Non-Utilized Talent, Transportation, Inventory, Motion, and Extra-Processing are a list of the most common reasons for excess cycle time in a process. 5S - answer-A workplace organization technique composed of 5 primary phases: Sort, Set In Order, Shine, Standardize, and Sustain. The steps describes how to organize a work space for efficiency and effectiveness by identifying and storing the items used, maintaining the area and items, and sustaining the new order. 5 Whys - answer-A simple but effective method of analyzing and solving problems by asking "why" five times, or as many times as needed in order to move past symptoms and determine root cause. A3/Improvement charter - answer-A one page project report. This one-pager contains the problem, the analysis of the process, the identified root causes, potential solutions and action plan all on a large sheet of paper. Analyze Phase - answer-The third phase of the DMAIC process which focuses on identifying the root cause (or causes) of a process problem. Brainstorming - answer-A free-thinking group method for generating ideas to find a conclusion for a specific problem by gathering a list of ideas spontaneously contributed by its members. Change Management - answer-A collective term for all approaches to prepare, support, and help individuals, teams, and organizations in making organizational change. Cellular Manufacturing - answer-A modern adaptation of assembly line production whereby sets of tasks are completed by teams by splitting the production process into a number of self-contained units. The goal is to move as quickly as possible, make a wide variety of similar products, while making as little waste as possible. Paired Comparisons - answer-A tool that helps you work out the importance of a number of options relative to one another, making it easier to choose the most important problem to solve, or to pick the solution that will be most effective. It also helps you set priorities where there are conflicting demands on your resources. The tool is particularly useful when you don't have objective data to use to make your decision. It's also an ideal tool to use to compare different, subjective options, for example, where you need to decide the relative importance of qualifications, skills, experience, and teamworking ability when hiring people for a new role. Control Phase - answer-The last phase of DMAIC which ensures that improved processes continue to work predictably and meet the customers' expectations. In short, this phase ensures any gains are maintained. Control Chart - answer-Time charts designed to display signals or warnings of special cause variation. Traditionally, they are mostly designed to monitor process parameters when underlying form of the process distributions are known. The purpose is to determine whether a process should undergo a formal examination for quality-related problems. Control Plan - answer-A guide to continued monitoring of the process, and the response plan for each of the measures being monitored. The team should use this to ensure that the process does not slip back into the ways of the old process. Critical to Quality (CTQ) - answer-Internal critical quality parameters that relate to the wants and needs of the customer. It is what's important to the quality of the process or service to ensure the things that are important to the customer. Customer - answer-The groups or individuals who receive the goods and services of of the process. Cycle Time - answer-The measurement of the time elapsed from the beginning of a process or a step to its end. Data Collection - answer-The process of gathering and measuring information on targeted variables in an established system, which then enables one to answer relevant questions and evaluate outcomes. The goal is to capture quality evidence that allows analysis to lead to the formulation of convincing and credible answers to the questions that have been posed. Defect - answer-Any process output, product, or service that does not meet customer requirements. One of the 8 Wastes. Defective - answer-Term applied to any process, product, or service with one or more defects. Define Phase - answer-The first phase of the DMAIC method which involves defining the problem or opportunity, determining the voice of the customer/customer requirements, and outlining the project purpose/scope. DMAIC - answer-A data-driven improvement cycle used for improving, optimizing and stabilizing business processes and designs. Stands for Define, Measure, Analyze, Improve, and Control. Over-processing - answer-Refers to the concept of adding more features or producing a product or service of higher quality than required by the customer. One of the 8 Wastes. Facilitator/Facilitation skills - answer-An intermediary who helps parties involved in a process improvement project collaborate. Can either be a third party or a team member/leader. Esssential skills of what organizational development professionals refer to as the process of group facilitation Failure Modes & Effects Analysis (FMEA) - answer-A risk management tool that identifies and quantifies the influence of potential failures in a system. The tool evaluates the severity, occurrence and detection of risks to prioritize which ones are the most urgent. Fishbone Diagram - answer-A structured brainstorming tool designed to assist an improvement team in listing potential causes of a specific effect. Also called cause- and effect diagram. Flow - answer-The ideal state of processes such that units and services move through each process step at the rate of customer demand. Goal Statement - answer-States the desired results of a process improvement project. It is a fundamental part of any Project Charter. Pulse Meeting - answer-Daily meeting that is approximately 15 minutes long with direct reports. Improve Phase - answer-The fourth phase of the DMAIC process that focuses on identifying opportunities and implementing solutions. Inventory - answer-The materials, parts, or units sitting unused in a process. Just-In-Time (aka JIT) - answer-A system for producing and delivering the right items, at the right time, in the right place, and in the right amounts. This concept is integral to the idea of a Pull system. Kaizen Event (aka Rapid Improvement Event) - answer-In practice, generally spans from 1 to 5 days and involves key process participants focusing on solving a narrowly scoped process improvement opportunity. By improving standardized programmes and processes, this concept aims to eliminate waste (lean manufacturing). Kanban (aka signboard) - answer-Japanese term that translates to "card" or "board" and indicates some form of signal within a process. Part of Just In Time (JIT) processing where either a physical or electronic device indicates that it's time to order inventory, process a unit or move to the next step in a process. Work items are visualized to give participants a view of progress and process, from start to finish. Work is pulled as capacity permits, rather than work being pushed into the process when requested. Kano Model - answer-A theory for product development and customer satisfaction. The data is typically collected via a standardized questionnaire. The questionnaire can be on paper, collected in an interview, or conducted in an online survey. It is a technique that categorizes customer requirements into three types: 1. Delighters 2. Satisfiers 3. Dissatisfiers. Heijunka - answer-Also called Production leveling is a technique for reducing the mura (unevenness) which in turn reduces muda (waste). It was vital to the development of production efficiency in the Toyota Production System and lean manufacturing. The goal is to produce intermediate goods at a constant rate so that further processing may also be carried out at a constant and predictable rate. In-Frame/Out of Frame - answer-A tool used in the Initiate Phase to draw boundaries by engaging the team in terms of scope of process change, timelines, etc. It also ensures that there is no 'Scope Creep' later in the project. Is/Is Not - answer-An analysis tool that can be one of the most useful tools to sharpen the definition and scope of a Six Sigma project. This analysis should be completed during or immediately after project selection. This analysis validates the project and creates a specific project problem statement. Line Balancing (Yamazumi) - answer-A tool to leveling the workload across all processes in a cell or value stream to remove bottlenecks and excess capacity. Yamazumi is a Japanese word that literally means to stack up. Process tasks are individually represented in a stacked bar chart, these can be categorized as either Value Added, Non-Value Added or Waste. The mean duration time of each task is recorded and

Vista previa del contenido

Lean Tools and Techniques
8 wastes of Lean - answer-Defects, Overproduction, Waiting, Non-Utilized Talent, Transportation,
Inventory, Motion, and Extra-Processing are a list of the most common reasons for excess cycle time in a
process.

5S - answer-A workplace organization technique composed of 5 primary phases: Sort, Set In Order,
Shine, Standardize, and Sustain. The steps describes how to organize a work space for efficiency and
effectiveness by identifying and storing the items used, maintaining the area and items, and sustaining
the new order.

5 Whys - answer-A simple but effective method of analyzing and solving problems by asking "why" five
times, or as many times as needed in order to move past symptoms and determine root cause.

A3/Improvement charter - answer-A one page project report. This one-pager contains the problem, the
analysis of the process, the identified root causes, potential solutions and action plan all on a large sheet
of paper.

Analyze Phase - answer-The third phase of the DMAIC process which focuses on identifying the root
cause (or causes) of a process problem.

Brainstorming - answer-A free-thinking group method for generating ideas to find a conclusion for a
specific problem by gathering a list of ideas spontaneously contributed by its members.

Change Management - answer-A collective term for all approaches to prepare, support, and help
individuals, teams, and organizations in making organizational change.

Cellular Manufacturing - answer-A modern adaptation of assembly line production whereby sets of tasks
are completed by teams by splitting the production process into a number of self-contained units. The
goal is to move as quickly as possible, make a wide variety of similar products, while making as little
waste as possible.

Paired Comparisons - answer-A tool that helps you work out the importance of a number of options
relative to one another, making it easier to choose the most important problem to solve, or to pick the
solution that will be most effective. It also helps you set priorities where there are conflicting demands
on your resources. The tool is particularly useful when you don't have objective data to use to make
your decision. It's also an ideal tool to use to compare different, subjective options, for example, where
you need to decide the relative importance of qualifications, skills, experience, and teamworking ability
when hiring people for a new role.

Control Phase - answer-The last phase of DMAIC which ensures that improved processes continue to
work predictably and meet the customers' expectations. In short, this phase ensures any gains are
maintained.

Control Chart - answer-Time charts designed to display signals or warnings of special cause variation.
Traditionally, they are mostly designed to monitor process parameters when underlying form of the

, process distributions are known. The purpose is to determine whether a process should undergo a
formal examination for quality-related problems.

Control Plan - answer-A guide to continued monitoring of the process, and the response plan for each of
the measures being monitored. The team should use this to ensure that the process does not slip back
into the ways of the old process.

Critical to Quality (CTQ) - answer-Internal critical quality parameters that relate to the wants and needs
of the customer. It is what's important to the quality of the process or service to ensure the things that
are important to the customer.

Customer - answer-The groups or individuals who receive the goods and services of of the process.

Cycle Time - answer-The measurement of the time elapsed from the beginning of a process or a step to
its end.

Data Collection - answer-The process of gathering and measuring information on targeted variables in
an established system, which then enables one to answer relevant questions and evaluate outcomes.
The goal is to capture quality evidence that allows analysis to lead to the formulation of convincing and
credible answers to the questions that have been posed.

Defect - answer-Any process output, product, or service that does not meet customer requirements.
One of the 8 Wastes.

Defective - answer-Term applied to any process, product, or service with one or more defects.

Define Phase - answer-The first phase of the DMAIC method which involves defining the problem or
opportunity, determining the voice of the customer/customer requirements, and outlining the project
purpose/scope.

DMAIC - answer-A data-driven improvement cycle used for improving, optimizing and stabilizing
business processes and designs. Stands for Define, Measure, Analyze, Improve, and Control.

Over-processing - answer-Refers to the concept of adding more features or producing a product or
service of higher quality than required by the customer. One of the 8 Wastes.

Facilitator/Facilitation skills - answer-An intermediary who helps parties involved in a process
improvement project collaborate. Can either be a third party or a team member/leader. Esssential skills
of what organizational development professionals refer to as the process of group facilitation

Failure Modes & Effects Analysis (FMEA) - answer-A risk management tool that identifies and quantifies
the influence of potential failures in a system. The tool evaluates the severity, occurrence and detection
of risks to prioritize which ones are the most urgent.

Fishbone Diagram - answer-A structured brainstorming tool designed to assist an improvement team in
listing potential causes of a specific effect. Also called cause- and effect diagram.

Información del documento

Subido en
30 de septiembre de 2024
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TOPDOCTOR
5.0
(1)
Vendido
10
Seguidores
5
Artículos
3387
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes