• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

Project Management: Six Sigma

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

Six Sigma - answer-seeks to improve the quality of process outputs by identifying and removing the causes of defects (errors) and minimizing variability in manufacturing and business processes -structured and data driven to drive near perfect quality goal - "Zero Defects" The goal of six sigma - answer-to attain less than 3.4 Defects Per Million Opportunities (DMO) Six Sigma History - answer-Originated by Motorola in 1979 -in early to mid 1980s, Motorola developed the new standard and created the method -$20MM in savings for Motorola's pager production line -change in mindset (Cost of Poor Quality) and culture Six Sigma became famous when - answer-Jack Welsh (chairman and CEO of GE) made it central to his successful business strategy at General Electric in 1995 -reported $200MM in savings in the first year of implementation (1996) 2 aspects of Six sigma - answer-1. Use of technical tools -statistical quality control -seven tools of quality 2. People involvement -All employees responsible to identify quality problems -all employees trained to use technical tools -Define, Measure, Analyze, Improve, Control - answer-DMAIC Six Sigma Training levels - answer-yellow belt, green belt, black belt, master black belt yellow belt - answer-basic understanding of Six Sigma methodology and tools in the DMAIC problem solving process. Team member on process improvement project green belt - answer-A TRAINED TEAM MEMBER allowed to work on small, carefully defined Six Sigma projects, requiring less than a Black Belt's full time commitment black belt - answer-THOROUGH KNOWLEDGE OF SIX SIGMA PHILOSOPHIES AND PRINCIPLES. Coaches successful project teams. Identifies projects and selects project team members. master black belt - answer-a proven mastery of process variability reduction, waste reduction and growth principles and can effectively present training at all levels Total Quality Management - answer-An integrated organizational effort to improve quality at entry level: -Quality Gurus -Voice of the customer -costs of quality -quality tools -ISO 9000 Quality Gurus - answer-experts that significantly contributed to our current understanding and practice of quality management today W. Edwards Deming - answer-quality guru -considered the "father" of TQM -stressed management's responsibility for quality -developed "14 points" to guide companies in quality improvement Philip Crosby - answer--Coined phrase "quality is free" as defects are costly - introduced concept of zero defects -focus on prevention and not inspection Joseph M. Juran - answer-defined quality as "fitness for use" -developed concept of cost and quality 14 points - answer-W. Edwards Deming 3. cease dependence on inspection to improve quality 5. Constantly improve the production and service system 7. Institute leadership 9. Break down barriers between departments 14. Put everyone to work to accomplish the transformation Four Absolutes of Quality - answer-Philip Crosby 1. The definition of quality is conformance to requirements 2. The system of quality is prevention 3. Performance standard is 0 defects 4. The measure of quality is the price of nonconformance Joseph Juran - answer-1.Quality Planning, identify internal / external customers & needs: -Develop products satisfying those needs. -Mangers set goals, priorities, and compare results. 2. Quality Control and determine what to control: Establish standards of performance. Measure performance, interpret the difference, take action. 3.Quality Improvement, show need for improvement: -Identify projects for improvement. -Implement remedies -Provide control to maintain improvement Objectives of Malcolm Baldrige National Quality Award - answer-1. Stimulate firms to improve 2. Recognize firms for quality achievements 3. Establish guidelines so that organizations can evaluate their improvement and provide guidance to others Categories measured in Malcolm Baldrige National Quality Award - answer-1. Leadership 2. Strategic Planning 3. Customer and Market Focus 4. Information and Analysis 5. Human Resource Focus 6. Process Management 7. Business Results Voice of the customer - answer-Quality is meeting or exceeding customer expectations Tools to help determine customer wants: -Focus groups -Market surveys -Customer interview prevention costs - answer--costs incurred in the process of preventing poor quality -includes costs of preparing and implementing a quality plan appraisal costs - answer--costs incurred in the process of uncovering defects -includes testing, evaluating, and inspecting quality internal failure costs - answer--costs of defects before they reach the customer -include scrap, rework, and material losses external failure costs - answer--costs of failure at customer site -includes returns, repairs, and recalls Seven tools of quality control - answer-1. Cause and Effect Diagrams (aka root cause analysis) 2. Flowcharts 3. Checklists 4. Control Charts 5. Scatter Diagrams 6. Pareto Analysis 7. Histograms flow diagrams - answer-annotated boxes representing process to show the flow of products or customers. check sheets - answer-determine frequencies for specific problems. pareto charts - answer-for presenting data in an organized fashion, indicating process problems from most to least severe. cause and effect diagrams - answer-(Fishbone or Ishikawa diagrams) - used to aid in brainstorming and isolating the causes of a problem. statistical process control - answer-Allows firms to: -Visually monitor process performance -Compare the performance to desired levels or standards -Take corrective action firms - answer--Gather process performance data -Create control charts to monitor process variability -Then collect sample measurements of the process over time and plot on charts. acceptance sampling - answer-When shipments are received from suppliers, samples are taken and measured against the quality acceptance standard. Shipment is assumed to have the same quality. -Sampling is less time-consuming than testing every unit but can result in errors acceptance sampling: producer's risk - answer-A buyer rejects a shipment of good quality units because the sample quality level did not meet standards (type I error) acceptance sampling: consumer's risk - answer-Buyer accepts a shipment of poor-quality units because the sample falsely provides a positive answer (type II error) natural variations - answer-Expected and random (can't control) assignable variations - answer-Have a specific cause (can control) variable data - answer-Continuous, (e.g., Weight) attribute data - answer-Indicate some attribute such as color and satisfaction, or beauty. variable control charts - answer-1. x-bar chart tracks central tendency of sample means 2. R-chart tracks sample ranges

Vista previa del contenido

Project Management: Six Sigma
Six Sigma - answer-seeks to improve the quality of process outputs by identifying
and removing the causes of defects (errors) and minimizing variability in
manufacturing and business processes
-structured and data driven to drive near perfect quality goal - "Zero Defects"

The goal of six sigma - answer-to attain less than 3.4 Defects Per Million
Opportunities (DMO)

Six Sigma History - answer-Originated by Motorola in 1979
-in early to mid 1980s, Motorola developed the new standard and created the
method
-$20MM in savings for Motorola's pager production line
-change in mindset (Cost of Poor Quality) and culture

Six Sigma became famous when - answer-Jack Welsh (chairman and CEO of GE)
made it central to his successful business strategy at General Electric in 1995
-reported $200MM in savings in the first year of implementation (1996)

2 aspects of Six sigma - answer-1. Use of technical tools
-statistical quality control
-seven tools of quality
2. People involvement
-All employees responsible to identify quality problems
-all employees trained to use technical tools

-Define, Measure, Analyze, Improve, Control - answer-DMAIC

Six Sigma Training levels - answer-yellow belt, green belt, black belt, master black
belt

yellow belt - answer-basic understanding of Six Sigma methodology and tools in the
DMAIC problem solving process. Team member on process improvement project

green belt - answer-A TRAINED TEAM MEMBER allowed to work on small, carefully
defined Six Sigma projects, requiring less than a Black Belt's full time commitment

black belt - answer-THOROUGH KNOWLEDGE OF SIX SIGMA PHILOSOPHIES AND
PRINCIPLES. Coaches successful project teams. Identifies projects and selects
project team members.

master black belt - answer-a proven mastery of process variability reduction, waste
reduction and growth principles and can effectively present training at all levels

Total Quality Management - answer-An integrated organizational effort to improve
quality at entry level:
-Quality Gurus
-Voice of the customer

, -costs of quality
-quality tools
-ISO 9000

Quality Gurus - answer-experts that significantly contributed to our current
understanding and practice of quality management today

W. Edwards Deming - answer-quality guru
-considered the "father" of TQM
-stressed management's responsibility for quality
-developed "14 points" to guide companies in quality improvement

Philip Crosby - answer--Coined phrase "quality is free" as defects are costly
- introduced concept of zero defects
-focus on prevention and not inspection

Joseph M. Juran - answer-defined quality as "fitness for use"
-developed concept of cost and quality

14 points - answer-W. Edwards Deming
3. cease dependence on inspection to improve quality
5. Constantly improve the production and service system
7. Institute leadership
9. Break down barriers between departments
14. Put everyone to work to accomplish the transformation

Four Absolutes of Quality - answer-Philip Crosby
1. The definition of quality is conformance to requirements
2. The system of quality is prevention
3. Performance standard is 0 defects
4. The measure of quality is the price of nonconformance

Joseph Juran - answer-1.Quality Planning, identify internal / external customers &
needs:
-Develop products satisfying those needs.
-Mangers set goals, priorities, and compare results.
2. Quality Control and determine what to control:
Establish standards of performance.
Measure performance, interpret the difference, take action.
3.Quality Improvement, show need for improvement:
-Identify projects for improvement.
-Implement remedies
-Provide control to maintain improvement

Objectives of Malcolm Baldrige National Quality Award - answer-1. Stimulate firms
to improve
2. Recognize firms for quality achievements
3. Establish guidelines so that organizations can evaluate their improvement and
provide guidance to others

Información del documento

Subido en
30 de septiembre de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TOPDOCTOR
5.0
(1)
Vendido
10
Seguidores
5
Artículos
3387
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes