NCCCO TOWER CRANE EXAM ACTUAL EXAM

Vista previa del contenido

NCCCO TOWER CRANE EXAM ACTUAL EXAM
Splices in rall tracks shall have - ANSWER: Smooth Joints

Hydraulic systems should have their proper fluid level checked - ANSWER: Daily

If power fails during operations, the following shouldn't apply - ANSWER: Do your
best to finish moving load where it was designated to go

If load is undetermined who is to find out if load weight does not exceed crane rating
at radius at which the load is to be lifted - ANSWER: Person responsible for lift

Where should climbing instructions be kept - ANSWER: ON Site

All climbing operations shall be performed under the supervision of - ANSWER:
Qualified person

When cranes are erected, load limiting devices shall be tested for proper setting and
operation - ANSWER: Before crane is placed in service

Hooks shall be equipped with latches unless the application makes the use of the
latch - ANSWER: Impractical

Size and position of signs or panels must satisfy the limitations of - ANSWER:
Manufacturer

Fall prevention measures are needed for working at locations where you are
exposed - ANSWER: To a fall of 6ft or more

Travel distance on hand levers shall not be greater - ANSWER: than 14 inches from
neutral position

For power lines rated 175KV the minimum clearance between the lines and any part
of the crane or load is - ANSWER: 15ft

All controls shall be tested by the operator at the - ANSWER: start of new shift

Before each climbing operation all load members of the support system shall be -
ANSWER: Inspected

Chain slings are required to be - ANSWER: ID tagged

Welding on loads suspended by the crane can only be done if the load has -
ANSWER: Insulated slings

How much does an average cubic yard of concrete weight - ANSWER: 4,000 lbs

, Main power switch for tower crane is - ANSWER: At base of crane

Items not listed in the frequent inspection checklist are - ANSWER: Hydraulic pumps
and valves for excessive wear or damage

When is it necessary to determine that there is no practical alternative way to
perform the needed work or to gain access to the area - ANSWER: Personnel Lift

Each series of voice signals shall contain three elements stated in the following order
- ANSWER: Function and Direction - Distance and speed - Function stop

When lifting personnel communication shall be maintained between three of the
next four - ANSWER: Person(s) being lifted - Operator - Signal person

The condition when the tower load block or hook assembly comes in contact with
the upper - ANSWER: Two-blocking

Load bearing members of the climbing and support system shall be inspected before
each - ANSWER: Climbing operation

Where shall a wind velocity indicating device be mounted - ANSWER: At or near the
top of crane

A velocity readout shall be provided - ANSWER: At the operators station

The area inside the self erecting tower cranes tail swing must be - ANSWER:
Barricaded

The self erecting tower crane must be properly grounded according with the -
ANSWER: National electric code (NEC)

Self Erecting tower crane erection must be performed by - ANSWER: Qualified
person

Extensive planning must occur before a self erecting tower crane arrives on the job
site. The plan should be divided into two major sections as follows - ANSWER:
Delivery, set up, erection and dismantle - Lifting operations

According to ASME B30.3 the minimum wraps to be left on a hoist drum are -
ANSWER: 3

How much does a cubic foot of steel weigh - ANSWER: 490lbs

When operating a tower crane and there is an uncontrolled movement, the operator
should - ANSWER: Engage emergency stop

Libro relacionado
 image
National Center for Construction Education and Research (U.S.), NCCER Tower Crane Operator Trainee Guide, Level 1
Editorial: 2010 ISBN: 9780132137201 Edición: Desconocido

Información del documento

Subido en
25 de septiembre de 2024
Número de páginas
11
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tutorsection1
4.9
(455)
Vendido
55
Seguidores
8
Artículos
1077
Última venta
6 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes