Which of the following OSHA regulations govern suspended personnel platforms? -
ANSWER: OSHA 1926.1431

According to ASME B30.3 The prohibited zone for power lines that are 60 kV is -
ANSWER: 15 ft

According to ASME B30.3, load hoist rotation resistant wire rope has a design factor
of - ANSWER: 5 to 1

According to ASME B30.3 when Lifting a suspended personnel platform design factor
for the rigging hardware is - ANSWER: 5 to 1

According to ASME B30.3 Load hoist ropes that are not rotation resistant must have
a design factor of - ANSWER: 5 to 1

The OSHA construction standard for rigging equipment is - ANSWER: 1926.251

According to ASME B30.3 on who's recommendations should a preventative
maintenance program be set up? - ANSWER: Crane manufacturer

When using cable or nylon spreaders it is important to remember: - ANSWER: The
lower the spreader angle the greater the tension

According to OSHA when testing a man basket how long must the test pick be
maintained? - ANSWER: 5 minutes

According to ASME B30.3 What is the minimum pitch diameter for load hoisting
sheaves? - ANSWER: Not less than 18 times rope diameter

According to ASME B30.3 what is the minimum pitch diameter for load block
sheaves? - ANSWER: Not less than 16 times rope diameter

According to ASME B30.3 what is the minimum pitch diameter for boom hoist
sheaves? - ANSWER: Not less than 15 times rope diameter

According to OSHA when lifting personnel the cranes hook must be the type that -
ANSWER: Can be closed and locked

According to OSHA when working over water with a man basket are the people
inside required to wear a belt/harness? - ANSWER: No harness or belt required

According to ASME B30.3 when working near powerlines where should caution
stickers be installed? - ANSWER: Operator station and at the base of the crane

, According to OSHA a frequent inspection is: - ANSWER: Daily to monthly

According to OSHA a periodic inspection is: - ANSWER: Monthly to annually

Cranes idle for more than six months must have inspections performed: - ANSWER:
Frequent and periodic

Cranes idle for less than six months must have inspections performed: - ANSWER:
Frequent

Cranes lifting personnel platform must have the platform and rigging inspected: -
ANSWER: Prior to each shift

Crane hooks must not be twisted in excess of: - ANSWER: 10 degrees

A Crane hook's throat must not exceed: - ANSWER: 15% of its original size

By order of hitch strength which is the correct answer? - ANSWER:
Basket,vertical ,choker

According to ASME B30.3 And OSHA you should always have at least how many
wraps on the hoist drum? - ANSWER: 2

What is the minimum allowable distance from the crane and power lines under 50
kV? - ANSWER: 10 ft

According to ASME B30.3 How many randomly broken wires must there be to
remove a running wire rope from service? - ANSWER: 12

According to ASME B30.3 when working near power lines when is a signal person
required? - ANSWER: When crane moves within a booms length of power lines

According to OSHA after the crane has been checked out and before personnel lift
operations begin the crew should: - ANSWER: Have a pre-lift meeting

According to OSHA when is it safe to work closer than the allowable distance from
power lines? - ANSWER: When utility company says lines are De-Energized

When should a tagline be used? - ANSWER: When rotation of load would be
dangerous

What is the minimum design factor required for a boom hoist rope? - ANSWER: 3.55

How many broken wires must be present in one strand of one lay for running wire
rope to be removed from service? - ANSWER: 4

Libro relacionado
 image
National Center for Construction Education and Research (U.S.), NCCER Tower Crane Operator Trainee Guide, Level 1
Editorial: 2010 ISBN: 9780132137201 Edición: Desconocido

Información del documento

Subido en
25 de septiembre de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tutorsection1
4.9
(455)
Vendido
55
Seguidores
8
Artículos
1077
Última venta
6 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes