These materials should be used when setting up on soft surfaces such as soft ground,
asphalt or backfilled material - ANSWER: Timber or steel

On crawler cranes, which boom position creates the greatest ground pressure -
ANSWER: Over the corner

Allows the weight of the crane and load to be distributed over a greater surface area.
Should be used under outrigger floats at all times. - ANSWER: Blocking

Blocking should be at least how many times the surface area of the float - ANSWER:
3

Overhead power lines must be considered to be in this condition until electrical
authorities indicate otherwise - ANSWER: Energized

No part of the crane or load must ever enter this area around an energized power
line - ANSWER: Prohibited zone

The prohibited zone must be enlarged as this increases - ANSWER: kV

What minimum distance does OSHA require be maintained when voltage up to 350
kV is unknown - ANSWER: 20 foot

What minimum distance is required if the voltage is over 350 kV and unknown -
ANSWER: 50 foot

This person must be appointed any time the crane is working within a boom's length
of the prohibited zone - ANSWER: Qualified signal person

The use of these should be avoided when lifting near power lines, however if
necessary should be non-conductive type - ANSWER: Tag lines

Avoid operating cranes or handling materials in this area of power lines - ANSWER:
Above power lines

What does an operator do if the crane comes in contact with a power line -
ANSWER: Remain in the cab

If it is necessary to leave the crane cab before power lines are de-energized after
contact, how does the operator exit the cab - ANSWER: Jump

A crane can also become electrically charged when working close to these (radio,
microwave, cell) - ANSWER: transmission towers

, Before traveling on site with a load, be sure that this is allowed by the - ANSWER:
Manufacturer

Ensure the boom low enough when traveling with a load to avoid the possibility of
this - ANSWER: Backward collapse

Always travel in this direction when traveling with a load - ANSWER: Toward the
load

Most manufacturers do not permit travel with a load when the boom is in these
settings - ANSWER: Boom extension, jib, or pinned section

To prevent a lattice boom crane from tipping forward, the boom should be in this
position before traveling down an incline - ANSWER: Raised

To prevent a lattice boom crane from tipping backwards, the boom should be in this
position when traveling up an incline - ANSWER: Lowered

Responsible for seeing that the ground conditions are adequate to support the
equipment. - ANSWER: Controlling entity

Responsible for informing the user and the operator of the equipment of the
location of hazards beneath the equipment set-up area (such as voids, tanks,
utilities) - ANSWER: Controlling entity

Responsible for establishing a system to coordinate the operations of two cranes
that operate within each other's working radius - ANSWER: Controlling entity

hoist rope & reeving, op aids & safety devices, cab windows/equipment, hooks &
latches, fluid levels (crankcase oil, coolant, hydraulic oil, etc.), elec equipment,
leveling device, control & drive mechanisms, fire extinguisher, air/hydraulic system -
ANSWER: Key items of inspection

firm & reasonably level surface, no buried pipes, utilities, sewers, tanks, etc. -
ANSWER: Access to job site

Important to accomplish when setting up a crane on a grade - ANSWER: Leveling the
crane

Load chart capacities are based on the crane being level within this percentage -
ANSWER: 1%

Use this tool placed under or close to the boom foot for an accurate measure of level
- ANSWER: carpenter's level

Swing the boom to this degree over the side and check for level again - ANSWER: 90
degrees

Libro relacionado
 image
Desconocido Mobile Crane Operator
Editorial: 2009 ISBN: 9781100136004 Edición: Desconocido

Información del documento

Subido en
25 de septiembre de 2024
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tutorsection1
4.9
(455)
Vendido
55
Seguidores
8
Artículos
1077
Última venta
6 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes