ADVANCED RIGGING TEST QUESTIONS AND ANSWERS

Vista previa del contenido

Name: Score:


43 Multiple choice questions

Term 1 of 43
a test lift is recommended before

acceleration

a critical lift

lift plan

centered lift

Term 2 of 43
lift plans are mandatory for

steel erection or multiple-crane lifts

longer than they are wide

longer than they are wide

at different degrees of offset

Term 3 of 43
the load block weight is considered part of the weight of the _______

load to be lifted, not including rigging


total weight of the crane including its own structure

the maximum load capacity of the crane itself


the weight of the rigging equipment used in lifting

,Term 4 of 43
if the boom length falls between values listed on the load chart, the operator should use the
capacity rating for the

the average load radius based on previous lifts

next longer load radius to be compensated for the boom length


shorter load radius to ensure safety during lifting

the maximum boom length allowed for the crane

Term 5 of 43
during critical lift operation, the operator must obey a(n) _______ signal at all times

emergency stop

load signal


safety check

lift command

Term 6 of 43
what dynamic occurs when a load is hoisted from a point other than directly over the load

pendulum effect


delayed density dependence

pendulum theory

resonance effect

Term 7 of 43
interpolation is permitted is determining load capacities

True

False

,Term 8 of 43
in preparing for multiple-crane lifting, the load blocks of each crane have to be positioned
relative to the loads center of gravity using the formula ________

deducted from


the ground to the center of the boom point sheaves

(net capacity crane one) x A =
(net capacity crane two) x B

ordinary, critical, pre-engineered production

Term 9 of 43
crane manufactures produce separate load/capacity charts for certain operational quadrants

True

False

Term 10 of 43
cranes are typically built to be

longer than they are wide

steel erection or multiple-crane lifts

example is vertebrae

next longer load radius to be compensated for the boom length

Term 11 of 43
when a bundle of rebar is being lifted with two slings in a choker hitch, the sling eyes should
be threaded in the opposite direction to improve load stability

True


False

, Term 12 of 43
leverage is defined as

the power applied to a lever to cause the load to move


the weight of the lever itself

the distance from the pivot point to the load

the angle at which the lever is positioned

Term 13 of 43
as a crane swings to various quadrants, the distance that the load is positioned from the
tipping axis

pendulum effect

acceleration

raising or lowering the load


may change dramatically

Term 14 of 43
a document that outlines all weight, rigging, and configuration requirements for a lift is a

lift inspection

wire rope


a critical lift

lift plan

Term 15 of 43
critical lifts always require

an erected jib


a beam clamp

an equalizer beam

wire rope slings

Información del documento

Subido en
24 de septiembre de 2024
Número de páginas
36
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$9.50

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
selftest
4.2
(13)
Vendido
51
Seguidores
6
Artículos
2606
Última venta
2 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes