• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

Apm- Pfq

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

Exam study book APM PFQ & BOK7 STUDY GUIDE PACK. of - ISBN: 9781913305048 (APM- PFQ)

Vista previa del contenido

APM- PFQ EXAM LATEST 2024 ACTUAL EXAM TEST BANK
Who is responsible for configuration management? - ANSWER: The PM

What role provides the link between the business and the project? - ANSWER: The
project sponsor

What is the aim of resource smoothing? - ANSWER: To schedule activities within the
limit of their float

What are 3 ways that stakeholders can be identified? - ANSWER: Brainstorming,
analysis of project context and asking team members.

Who signs of the PMP? - ANSWER: The project sponsor

Who should identify risks on a project? - ANSWER: Any stakeholder

Who must project issues be escalated to? - ANSWER: The project sponsor

Benefits may be tangible or intangible - ANSWER: True

What does the product breakdown structure help to define? - ANSWER: The
products of a project

Who manages interrelationships between activities in a working group? - ANSWER: A
single person

Suppliers can be both internal and external to the organisation - ANSWER: True

What is portfolio management particularly concerned with avoiding? - ANSWER:
Capacity bottlenecks

What is resource levelling? - ANSWER: Re-allocating the resource so that the total
resources available is not exceeded but the end date might move.

What does project planning provide? - ANSWER: A framework within which the
project can be managed effectively.

Define scheduling - ANSWER: The process used to determine the overall project
duration and when activities and events are planned to happen.

Define liquidated damages - ANSWER: Pre-estimated losses

What is a benefit of splitting a project into phases? - ANSWER: Helps to manage risk,
helps with planning, helps to manage stakeholder expectations.

, What document includes the project success criteria? - ANSWER: The business case

When is the business case formally reviewed? - ANSWER: At decision gates

When is the project sponsor's focus for the project reflected? - ANSWER: The
importance that the sponsor gives to time, cost and quality of the project.

What is the best technique for team building? - ANSWER: Motivation

Define change control - ANSWER: The process that ensures that all changes made to
a projects baselined scope, time, cost and quality objectives or agreed benefits are
identified, evaluated, approved, rejected, or deferred.

What is the risk management procedure? - ANSWER: Identify risks, define owners,
establish probability, establish impact, mitigate the risks and maintain a risk
management diary.

What phase is the PMP first drafted? - ANSWER: The definition phase

What do Bar or Gantt charts show? - ANSWER: An overview of the tasks against a
common timescale

What does an effective project quality system do? - ANSWER: Quality is focused on
prevention of errors

What is the aim of the product breakdown structures? - ANSWER: To identify the
deliverables for the project.

What is the use of an issue log? - ANSWER: A summary of all project issues, their
analysis and status.

What do project milestones represent? - ANSWER: Well defined events

What does change control least likely affect? - ANSWER: Quality assurance

What is the difference between a project and business as usual? - ANSWER: Projects
manage change whereas BAU manages a repetitive process

What are the stages of the linear project lifecycle? - ANSWER: Concept, definition,
deployment, transition

What is the extended linear project lifecycle? - ANSWER: Users use the products to
create outcomes (adoption, benefits and operations)

What stage does a product lifecycle contain that a project lifecycle doesn't? -
ANSWER: Termination (use the products until they discontinue)

Libro relacionado
 image
Editorial: 2020 ISBN: 9781913305048 Edición: Desconocido

Información del documento

Subido en
21 de septiembre de 2024
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
maxmaxwellmm254
4.9
(135)
Vendido
9
Seguidores
1
Artículos
839
Última venta
1 año hace


Reseñas de compradores verificados




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes