EGS4625 Exam 4 Study Guide

Document preview thumbnail
Vista previa 2 fuera de 12 páginas

EGS4625 Exam 4 Study Guide

Vista previa del contenido

EGS4625 Exam 4 Study
Guide
Key Performance Indicators (KPIs) - Answer The quantifiable metrics a company uses to
evaluate progress toward critical success factors

SMART metrics - Answer Specific, Measurable, Actionable, Relevant, Timely

Specific - Answer Targeted to the objective

Measurable - Answer Data are accurate and complete

Actionable - Answer Good vs bad, so action is clear

Relevant - Answer Measure things that are important

Timely - Answer You can get the data without delay

Financial KPI Components - Answer > Technical completion of scope

> Measurement of performance against budgets

> Measurement of performance against schedule

Pick a point in time to measure - Answer - Design and Consulting Projects - at least
monthly

- Construction and similar projects - major milestones

Align and compare to Project Plan (Baseline, Risk Register) - Answer - Progress (actual
work performed)

- Costs actually incurred; costs to complete the project

- Risks that materialized or passed and impacts

Tricks - 'Rubber' baselines - Answer Changing the baseline without change control

Tricks - Client Milestones - Answer Omitting their milestones

Tricks - Contractor Constraints - Answer Front loading

Inserting tight third party constraints to excuse contractor schedule slips

Fundamental Cost Management Concepts - Answer - What work was scheduled to have

, been completed?

- What was the cost estimate for the work scheduled?

- What work has been accomplished?

- What was the estimated cost for the work completed?

- What costs have been incurred?

- What are the variances from the planned budgets?

The Estimate At Complete (EAC) - Answer Your estimate of either the project's costs
[labor and expense] or price at the end of the project

Costs and price are important to your _________ and only price is important to your
_________ - Answer Organization, customer

_________ is a component of the _________. - Answer The Estimate To Complete, Estimate
at Complete

ACCURATE DETERMINATION OF THE _____ IS ONE OF THE PM'S MOST DIFFICULT
TASKS! - Answer Estimate At Complete (EAC)

Statusing Methodology: Multiple Approaches - Answer % complete determination using:

- Milestones with weighted values

- % complete is additive when each milestone is reached

- Each milestone weighted by budgeted value

- Requires short duration tasks

- Requires WBS structured to include milestones

Fixed Formula - Answer - Tied to start and finish of tasks

- Purchased materials work well with this method

- Requires short-span duration tasks

% complete estimate - Answer Most subjective but easy to use > 'Pressure' to claim
more progress than actually done > Not recommended

% complete with milestone 'gates' - Answer Gates tied to hard milestones placed
intermittently that contain preset values on what can be earned > Gaining acceptance

Quantification: - Answer budgeted and staff held accountable

• Quarantine: - Answer LOE (level of effort) tasks separate from all others

Información del documento

Subido en
17 de septiembre de 2024
Número de páginas
12
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Flat
3.6
(5)
Vendido
41
Seguidores
5
Artículos
2117
Última venta
5 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes