NYS Asbestos Investigator UPDATED Exam Questions and CORRECT Answers Asbestos types - CORRECT ANSWER- Chrysotile, Amosite, Crocidolite, Anthophyllite Actinolite Tremolite ACM is defined as what? - CORRECT ANSWER- Asbestos-containing material, defined as any material containing more than 1% asbestos by weight

Vista previa del contenido

NYS Asbestos Investigator UPDATED
Exam Questions and CORRECT Answers

Asbestos types - CORRECT ANSWER- ✔✔Chrysotile,
Amosite,
Crocidolite,
Anthophyllite
Actinolite
Tremolite


ACM is defined as what? - CORRECT ANSWER- ✔✔Asbestos-containing material, defined
as any material containing more than 1% asbestos by weight


When did the EPA guidance go into effect? - CORRECT ANSWER- ✔✔March 31, 1986



Friable Asbestos - CORRECT ANSWER- ✔✔means any ACM applied to ceilings, walls,
structural activities that can be crumbled pulverized or reduced to powder by hand pressure


Local Education Agency (LEA) - CORRECT ANSWER- ✔✔public school district or any
owner of a private, non-profit or secondary education facility


Response action - CORRECT ANSWER- ✔✔means methods to protect human health and
the environment from ACM


What is the goal AHERA? - CORRECT ANSWER- ✔✔To identify the presence of ACM in a
school facility


When is a response action required? - CORRECT ANSWER- ✔✔When damage or potential
damage occurs


ACBM - CORRECT ANSWER- ✔✔Asbestos Containing Building Material

,homogenous area - CORRECT ANSWER- ✔✔means an area of surfacing material, thermal
insulation, or miscellaneous material that is uniform in color and texture


miscellaneous building materials - CORRECT ANSWER- ✔✔materials that are not included
in thermal or surfacing, interior building components; floor and ceiling tiles, wall paper, glue


operations and maintenance program - CORRECT ANSWER- ✔✔A program of work
practices regarding ACBM


Surfacing Material - CORRECT ANSWER- ✔✔material sprayed, troweled on or applies to
surfaces (acoustical plaster or fire proofing materials)


Thermal System Insulation is considered what? - CORRECT ANSWER- ✔✔insulation
applied to pipes, fittings, boilers, tanks, ducts or other structural components to prevent heat
loss or gain.


How many samples at minimum should be taken for surfacing material for 1,000 SF or less -
CORRECT ANSWER- ✔✔At least 3


How many samples at minimum should be taken for surfacing material for 1,000 SF to 5,000
SF - CORRECT ANSWER- ✔✔At least 5


How many samples at minimum should be taken for surfacing material for 5,000 SF or
greater - CORRECT ANSWER- ✔✔at least 7


What is the recommended sample number for surfacing material - CORRECT ANSWER-
✔✔always 9


How many samples of thermal insulation should be taken in general? - CORRECT
ANSWER- ✔✔At least 3 bulk samples in a random matter of each homogenous material

, When can you take 1 sample of thermal insulation - CORRECT ANSWER- ✔✔If the
material is a patch and is less than 6 linear feet


When do you not need to sample thermal insulation? - CORRECT ANSWER- ✔✔If it is
fiberglass


How many samples are required for miscellaneous material - CORRECT ANSWER- ✔✔2 or
as many as to determine if it is ACM or not


PLM - CORRECT ANSWER- ✔✔Polarized Light Microscopy



TEM - CORRECT ANSWER- ✔✔transmission electron microscopy



Can bulk samples be composited - CORRECT ANSWER- ✔✔No



When is a material considered asbestos? - CORRECT ANSWER- ✔✔If at least one sample
has greater than 1% ACM


What does the lab need to provide on the report? - CORRECT ANSWER- ✔✔name, address,
person performing and signature, and date of analysis


If there is ACM or suspect ACM what must be done in the report? - CORRECT ANSWER-
✔✔You need to report the square or linear feet, position of material, floor, and condition of
the material


What should diagrams/blueprint have on them for the report/inspection? - CORRECT
ANSWER- ✔✔Date of sampling, address, specific locations of sampled materials, square
footage, PACM


What must be on the DEP form regarding the inspectors? - CORRECT ANSWER- ✔✔Name,
address, and signature of each licensed inspector or investigator, and their accreditation
number

Información del documento

Subido en
16 de septiembre de 2024
Número de páginas
23
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$9.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MGRADES
4.0
(232)
Vendido
1526
Seguidores
109
Artículos
107179
Última venta
4 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes