• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

Lean Bronze Certification Flashcards _ Study Guide With Correct Answers..pdf

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

Lean Bronze Certification Flashcards _ Study Guide With Correct Answers..pdf

Vista previa del contenido

9/11/24, 7:22 PM



Lean Bronze Certification
Jeremiah




Practice questions for this set
Terms in this set (118)

Continuous Flow high production volume, highly standardized commodity products

automatically stopping the process when something is wrong and then fixing the
Jidoka
problems on the line itself as they occur

An improvement process focused on improving the condition of a machine and then
Autonomous Maintenance
identifying, standardizing and training on operator maintenance tasks

Signal for a need or problem with equipment or process. Example of visual
Andon light
management


Lean Bronze Certification




1/5

, 9/11/24, 7:22 PM
This helps to capture and share knowledge in a structured way. Its commonly used as a
A3 document problem-solving tool. This should also be used as a coaching tool between a coach
and a learner. Reference Managing to Learn by John Shook.

Empowered Employees The heart and soul of a lean organization according to Masaaki Imai (Gemba Kaizen)

Sort The first step of 5S

Highland Park The Ford Factory that housed the Model T production

A general agreement by team members. Not everyone may fully agree with the idea
consensus
but no one is openly opposed and they can "live with it".

To align the tactical actions and improvements to the strategic objectives of the
Goal of Hoshin Kanri business. This is a layered process which should be flowed from the higher level group
and then down to the next level.

cross-functional team Employees from different areas coming together to complete a task or solve a problem

A type of system is used when product variation is high and it doesn't make sense to
Sequential pull system keep an inventory of each product. With this type of system, we control the overall
inventory in the system by only releasing when a trigger is created.

According to Dennis (Lean Production Simplified), the greatest enabler of mass
interchangeable parts
production

"Separating Man from Machine" describes the ability to have one operator run multiple
Standardized Work & Jidoka
machines. This is enabled by

Standardized Work Route of the operator is clear and documented

Little's law The relationship between work in process (WIP), throughput and lead time

PQCDSM A core set of goals and measures that we are tracking on a daily basis.

Value Stream The entire sequence of work required to bring a product from raw material to delivery

"The Goal" by Goldratt popularized this concept which focuses on bottleneck
Theory of Constraints
management

Joseph Juran This person introduced the Pareto principle as it applies to quality control

PERT Calculations (Optimistic + 4 x Most Likely + Pessimistic) / 6

PERT A scheduling and program planning method

SMART goal Specific, Measurable, Achievable, Realistic and Timely

Transportation, Inventory, Motion, Waiting, Overprocessing, Overproduction, and
7 types of Muda
Defects

waste The fundamental concept behind lean manufacturing is the elimination of __________

WIP calculaton Leadtime x Throughput

set in order a place for everything and everything in its place

NUMMI The name of the joint venture between GM and Toyota

Concentration diagrams "Measles Charts" are another way to describe what tool

Taiichi Ohno Who is most often referred to as the godfather of lean manufacturing

Reduction of changeover times SMED (Single Minute Exchange of Dies) focuses on

Value Stream Mapping Learning to See by Shook and Rother is widely regarded as the foundation of what

JIT and Jidoka The pillars of the Toyota Production System (TPS)
Red tag area During the 5S Sort phase, where should we put items that we don't think we need

Lean
Gemba Bronze
walks Certification An opportunity for leaders to walk the floor, ask questions, understand reality and learn


2/5

Información del documento

Subido en
11 de septiembre de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$8.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Denyss
5.0
(2)
Vendido
25
Seguidores
3
Artículos
6242
Última venta
6 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes