• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 1 fuera de 4 páginas
Examen

Systems Analysis and Design Chapter 3

Document preview thumbnail
Vista previa 1 fuera de 4 páginas

Systems Analysis and Design Chapter 3 action words ️Words that signal a sequence of events activity ️Basic units of work that a project manager plans, schedules, and monitors calendar view ️Shows tasks as an overlay on the actual calendar code review ️A type of structured walk-through that takes place during the SDLC concurrent task ️One of several tasks that can start at the same time critical path ️A series of tasks whose delay would affect a project's completion date Critical Path Method ️Developed by private industry to manage complex projects dependent tasks ️Tasks that must be completed one after another duration ️The amount of time it will take to complete a task event ️Examples may include the start of user training or completion of interviews Gantt chart ️Horizontal bar chart that represents a set of tasks Microsoft Project ️Program having a dominant share of the project management software industry milestone ️Recognizable reference point that can be used to monitor progress network diagram ️Microsoft's name for a PERT chart open source ️Type of program that is supported by a community of users and developers predecessor task ️Must be completed before another task can start program evaluation review technique ️Developed by the U.S. Navy to manage very complex projects project coordinator ️Handles administrative responsibilities for a project team project creep ️Process in which projects expand gradually without specific authorization project leader ️Used interchangeably with the term project manager project management ️Includes planning, scheduling, and reporting on information system development project manager ️A project team member who is usually a senior systems analyst project monitoring ️Requires guiding, supervising, and coordinating a project team's workload project planning ️Includes identifying all project tasks and estimating their completion time project reporting ️Includes regular progress reports to management, users, and the project team project scheduling ️Involves the creation of a specific timetable, usually in the form of charts project status meetings ️Opportunity for project manager to seek input and hold brainstorming sessions project triangle ️Includes three legs, which often represent cost, scope, and time qualitative risk analysis ️Estimates the probability that a risk will occur and its degree of impact quantitative risk analysis ️Can involve a modeling process called what-if analysis risk ️An event that could affect a project negatively risk identification ️Lists each risk and assesses the likelihood that it could affect a project risk management ️Process whose purpose is to minimize the impact of risk

Vista previa del contenido

Systems Analysis and Design Chapter 3
action words ✔️Words that signal a sequence of events



activity ✔️Basic units of work that a project manager plans, schedules, and monitors



calendar view ✔️Shows tasks as an overlay on the actual calendar



code review ✔️A type of structured walk-through that takes place during the SDLC



concurrent task ✔️One of several tasks that can start at the same time



critical path ✔️A series of tasks whose delay would affect a project's completion date



Critical Path Method ✔️Developed by private industry to manage complex projects



dependent tasks ✔️Tasks that must be completed one after another



duration ✔️The amount of time it will take to complete a task



event ✔️Examples may include the start of user training or completion of interviews



Gantt chart ✔️Horizontal bar chart that represents a set of tasks



Microsoft Project ✔️Program having a dominant share of the project management software industry



milestone ✔️Recognizable reference point that can be used to monitor progress

Información del documento

Subido en
9 de septiembre de 2024
Número de páginas
4
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CertifiedGrades
3.9
(38)
Vendido
149
Seguidores
61
Artículos
8729
Última venta
1 mes hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes