• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 1 fuera de 2 páginas
Examen

NCCCO Questions Test 1

Document preview thumbnail
Vista previa 1 fuera de 2 páginas

Where is the best location for leveling a crane? Upperworks When determining the "gross load" the best method is: Get an accurate load weight and add the rigging. By order of hitch strength, which is the correct answer? Basket, vertical, choker What is the purpose of using a jib? Increase height When taking a side strain on a boom, what concerns the operator most? Boom damage You should always have at least how many wraps on a hoist drum? 2 On a load chart, values above the bold line mean: Capacities based on structural competence. The primary purpose for a rooster sheave or Auxiliary boom point is to: Separate the hoist lines. What is the proper procedure when using an insulating link or a boot near power lines? Be sure to maintain the correct allowable distance from the lines. When the number of layers of rope on a drum increases, the: Allowable line pull decreases. What is the minimum allowable distance from the crane and power lines under 50kV? 10 ft. The term "Upperworks or Superstructure" refer to the area of the crane: Above the turntable Side loading may be caused by: Starting or stopping the swing too rapidly. What is the best procedure to follow when underground utilities may be present? Contact local utility company Eccentric main boom tip reeving causes: Twisting of the boom How many randomly broken wires must there be to remove a running wire rope from service? 6 When lifting personnel in a man-basket using 6x19 wire rope, the minimum safety factor is? 7 What is the safety factor required when using non rotating wire rope and lifting personnel in a man-basket? 10

Vista previa del contenido

NCCCO Questions Test 1
gh gh gh




Whereghisghtheghbestghlocationghforghlevelingghaghcrane? Upperworks
Whenghdeterminingghthegh"grossghload"ghtheghbestghmethodghis:
Getghanghaccurateghloadghweightghandghaddghtheghrigging.
Byghorderghofghhitchghstrength,ghwhichghisghtheghcorrectghanswer? Basket,ghvertical,ghchoker
Whatghisghtheghpurposeghofghusingghaghjib? Increaseghheight
Whenghtakingghaghsideghstrainghonghaghboom,ghwhatghconcernsghtheghoperatorghmost? Boomghdamage
Youghshouldghalwaysghhaveghatghleastghhowghmanyghwrapsghonghaghhoistghdrum? 2
Onghaghloadghchart,ghvaluesghaboveghtheghboldghlineghmean:
Capacitiesghbasedghonghstructuralghcompetence.
TheghprimaryghpurposeghforghaghroosterghsheaveghorghAuxiliaryghboomghpointghisghto:
Separateghtheghhoistghlines.
Whatghisghtheghproperghprocedureghwhenghusingghanghinsulatingghlinkghorghaghbootghnearghpowerghlines?
Beghsureghtoghmaintainghtheghcorrectghallowableghdistanceghfromghtheghlines.
Whenghtheghnumberghofghlayersghofghropeghonghaghdrumghincreases,ghthe:
Allowableghlineghpullghdecreases.
Whatghisghtheghminimumghallowableghdistanceghfromghtheghcraneghandghpowerghlinesghundergh50kV?
10ghft.
Theghtermgh"UpperworksghorghSuperstructure"ghreferghtoghtheghareaghofghtheghcrane:
Aboveghtheghturntable
Sideghloadingghmayghbeghcausedghby: Startingghorghstoppingghtheghswingghtooghrapidly.
Whatghisghtheghbestghprocedureghtoghfollowghwhenghundergroundghutilitiesghmayghbeghpresent?
Contactghlocalghutilityghcompany
Eccentricghmainghboomghtipghreevingghcauses: Twistingghofghtheghboom
Howghmanyghrandomlyghbrokenghwiresghmustghthereghbeghtoghremoveghaghrunningghwireghropeghfromghservi
ce? 6
Whenghliftingghpersonnelghinghaghman-
basketghusinggh6x19ghwireghrope,ghtheghminimumghsafetyghfactorghis? 7
Whatghisghtheghsafetyghfactorghrequiredghwhenghusingghnonghrotatingghwireghropeghandghliftingghpersonnelghi
nghaghman-basket? 10
Whoghhasghtheghresponsibilityghforghdeterminingghtheghcorrectghweightghofghaghload? Supervisor
Whenghworkingghnearghpowerghlines,ghwhenghisghaghsignalghpersonghrequired?
Whenghcraneghmovesghwithinghaghboom'sghlengthghofghpowerghlines.
Whenghanghoperatorghleavesghtheghcrane,ghheghmustghfirst:
Putghtheghloadghonghtheghgroundghandghputghallghdogsghorghpawlsghin.
Ifghreplacingghtheghhoistghlineghwireghropeghonghaghcrane,ghhowghdoghyoughdetermineghtheghsizeghofghtypeghofgh
wireghropeghtoghuse? UseghManufacturer'sghoperatorsghmanualghorghloadghchart.
Afterghtheghcraneghhasghbeenghcheckedghoutghandghbeforeghcraneghliftghoperationsghbegin,ghtheghcrewghshoul
d: Haveghaghpre-liftghmeeting
AccordingghtoghANSIghB30.5ghpersonnelghplatformghliftsghshouldghnotghbeghmadeghwithghwindghinghexcessg
hof: 20ghmph
Whenghisghitghsafeghtoghworkghcloserghthanghtheghallowableghdistanceghfromghpowerghlines?
Whenghutilityghcompanyghsayghtheghlinesghareghde-energized

Información del documento

Subido en
7 de septiembre de 2024
Número de páginas
2
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
33
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes