• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

Ccs Construction Specifiers Exam

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

CCS CONSTRUCTION SPECIFIERS EXAM

Vista previa del contenido

CCS CONSTRUCTION SPECIFIERS EXAM
Name 5 documents included in the Project Manual?




- Answers -1. Specifications
2. Contracting forms
3. Conditions of the Contract
4. Bid Requirements

True or False: Addenda and modifications are difficult to add to the bound project
manual and are often compiled in a separate volume. - Answers -TRUE

Project Manual Arrangement: In which section can the project title page, certifications
page, seals page, table of contents, list of drawings and list of schedules be found? -
Answers -INTRODUCTORY INFO

Project Manual Arrangement: In which section can solicitation, advertisement for bids,
instructions for bidders, supplementary instructions to bidders, available information,
preliminary schedules, geotech report, existing conditions info, bid forms, proposal
forms, bid form supplements and representations and certifications be found? - Answers
-BID (PROCUREMENT) REQUIREMENTS

Project Manual Arrangement: In which section can contract forms, agreement forms,
project forms, bond forms, certificates and forms, contract conditions, general and
supplementary conditions be found? - Answers -CONTRACT REQUIREMENTS

Project Manual Arrangement: In which section can General requirements, facility
construction and services, site and infrastructure and process equipment be found? -
Answers -SPECS

Project Manual Arrangement: List the 4 main organizational sections of the Project
Manual. - Answers -Intro, bid requirements, contract requirements and specs.

Developing Specs: Gathering Info- What two types of info are needed before the spec
writer begins writing a section of specs? - Answers -1. Specific project requirements

, 2. Reference material related to products and construction methods applicable to the
spec section.

Developing Specs: Product Selection Decisions - All product selections should be
_________ and the architect must direct or be made aware of product selections. -
Answers -RECORDED

Developing Specs: Product Selection- Name 4 factors to consider when evaluating a
product. - Answers -1. Product
2. Manufacturer
3. How is it installed?
4. How much does it cost- initial and operational?

Developing Specs: Product Selection- Name 5 methods for assembling and recording
spec info. - Answers -1. Notes/ Emails
2. Notebook
3. Checklist
4. Preliminary product description (PPD)
5. Outline specs

Spec Organization and Prep: Basic Decisions - Before a specifier can begin editing or
writing specs, the_____and ______ must be established. - Answers -TYPE and
ORGANIZATION

Spec Organization and Prep: Basic Decisions - The ______ published by the EJCDC is
a useful reference for coordinating parts of cds. For each subject that might be included
in the cds, the recommended primary location, as well as any secondary locations for
info is provided. - Answers -THE UNIFORM LOCATION OF SUBJECT MATTER

Spec Organization and Prep: Format - Info collected should be developed in the 3
part_____. - Answers -SECTION FORMAT

Spec Organization and Prep: Methods of Specifying - What are the 3 methods of
specifying? - Answers -1. describe
2. perform
3. ref standard
4. proprietary

Methods of Specifying: TRUE or FALSE: The specifier should be careful about
combining methods of specifying in the specification of a single product, because this
can be redundant and can result in a conflict. - Answers -TRUE

Spec Organization and Prep: Language - What are the 4 principles of effective
communication? - Answers -1. Clear
2. Concise
3. Correct

Información del documento

Subido en
6 de septiembre de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA
3.8
(380)
Vendido
2244
Seguidores
1452
Artículos
64014
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes