Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 46 páginas
Examen

CPSA Study Notes Questions & 100% Correct Answers- Latest Test | Graded A+ | Passed

Document preview thumbnail
Vista previa 4 fuera de 46 páginas

Risk Management Process (Format: 1. answer 2. answer etc.) -:- 1. Risk Assessment 2. Risk Treatment 3. Controls implementation 4. Supervision and Evaluation Risk Assessment is done based on (Format: 1. answer 2. answer etc) -:- 1. Asset value 2. Vulnerability 3. Threat 4. Probability 2 0 2 4 / 2 0 2 5 | © copyright | This work may not be copied for profit gain | Excell! 2 | P a g e | G r a d e A + | 2 0 2 4 / 2 0 2 5 5. Impact The steps involved in Risk Assessment are (Format: 1. R 2. V 3. P) -:- 1. Resource Identification 2. Vulnerability and threat identification 3. Probability and impact analysis Define resource -:- Anything of value to a company A vulnerability is a security hole or weakness in a system, these include: (Format: 1. answer 2. answer etc) -:- 1. Errors in code 2. Misconfiguration 2 0 2 4 / 2 0 2 5 | © copyright | This work may not be copied for profit gain | Excell! 3 | P a g e | G r a d e A + | 2 0 2 4 / 2 0 2 5 3. Inadequate access control 4. Inadequate natural disaster protection 5. Social engineering A threat is the circumstances or activities that may use vulnerabilities on resources. These include: (Format: 1, 2 and 3) Order: E, D and H -:- External, Deliberate actions and Human error Name the 4 methods of deal

Vista previa del contenido

2024 /2025 |© copyright | This work may not be copied for profit gain | Excell!


CPSA Study Notes Questions & 100% Correct
Answers- Latest Test | Graded A+ | Passed
Risk Management Process (Format:


1. answer


2. answer


etc.)


✓ -:- 1. Risk Assessment

2. Risk Treatment


3. Controls implementation


4. Supervision and Evaluation




Risk Assessment is done based on (Format:


1. answer


2. answer


etc)


✓ -:- 1. Asset value

2. Vulnerability


3. Threat


4. Probability


1|Page | Grade A+| 2024/2025

,2024 /2025 |© copyright | This work may not be copied for profit gain | Excell!
5. Impact




The steps involved in Risk Assessment are (Format:


1. R


2. V


3. P)


✓ -:- 1. Resource Identification

2. Vulnerability and threat identification


3. Probability and impact analysis




Define resource


✓ -:- Anything of value to a company




A vulnerability is a security hole or weakness in a system, these include: (Format:


1. answer


2. answer


etc)


✓ -:- 1. Errors in code

2. Misconfiguration



2|Page | Grade A+| 2024/2025

,2024 /2025 |© copyright | This work may not be copied for profit gain | Excell!
3. Inadequate access control


4. Inadequate natural disaster protection


5. Social engineering




A threat is the circumstances or activities that may use vulnerabilities on

resources. These include: (Format: 1, 2 and 3)


Order: E, D and H


✓ -:- External, Deliberate actions and Human error




Name the 4 methods of dealing with Risk (Format: 1, 2, 3 and 4)


Order: M, A, T and Ac


✓ -:- Mitigation, Avoidance, Transference and Acceptance




Why would a company choose Acceptance when dealing with risk?


✓ -:- Budget




What does transference mean when dealing with risk?


✓ -:- Outsource or insure




Security controls can be (Format: 1, 2, 3)

3|Page | Grade A+| 2024/2025

, 2024 /2025 |© copyright | This work may not be copied for profit gain | Excell!
Order: P, D, R


✓ -:- Preventative, Detective, Reactive




Types of Security controls (Format: 1, 2, 3)


Order: P, T, A


✓ -:- Physical, Technical, Administrative




Risk Management Reports should be: (Format 1, 2)


✓ -:- Clear and easy to understand, Management friendly




Why is Risk management a repetitive process? 4 reasons(Format:


1. answer


2. answer


etc)


Order: B, I, (S or H), H


✓ -:- 1. Business systems will change over time

2. Information systems will change over time


3. Software and Hardware update/replacement is inevitable


4. Human resources will fluctuate



4|Page | Grade A+| 2024/2025

Información del documento

Subido en
3 de septiembre de 2024
Número de páginas
46
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.09

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ScholarsAscend
3.7
(79)
Vendido
484
Seguidores
39
Artículos
29513
Última venta
13 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes