As a construction manager for a road construction project, you would perform the following
tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment
- Ensure the project is completed on time - =- Hire skilled workers to perform the construction
work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time


For CMP101, what are the 2 types of construction?
- Building and Non-building construction
- Residential and Commercial construction - =Building and Non-building construction


GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction
- None of these - =General Contractor


On a NON-RESIDENTIAL construction project, the Owner may directly hire the following
entities:
(SELECT ALL THAT APPLY)

,- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor
- Construction Manager - =- Architect
- Construction Manager


On a residential construction project from the following construction activities, what activity
would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation
- Excavation for foundation - =Excavation for foundation


Mechanical Plans are labeled in the title box as _______________ for the first mechanical plan.
- None of these
- E1
- A1
- S1
- P1 - =None of these


Which of the following discuss the quantity of work to be performed on a proposed
construction project?
- Construction Plans/Drawings
- None of these
- Construction Specifications
- Construction Bid Form - =Construction Plans/Drawings

, Select the activities that must be completed prior to starting the sheetrock (drywall) installation
stage
- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation
- Interior Trims installation
- Interior Painting - =- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation


During the _______________________ the owner has occupied the new building, but the
contractor is still responsible to fix any issues arising due to poor construction quality
- Warranty Period
- Construction Period
- Design Period
- Procurement Period - =Warranty Period


Which period in history gave rise to the building trades as we know them today?
- Egypt and the pyramids
- Roman empire
- Middle Ages
- Greek influence
- Puranese - =Middle Ages


Select the project delivery method in which a company will perform work at a CERTAIN
PERCENTAGE regardless of final profit or loss that occurs on the construction project
- Design-Bid-Build

Escuela, estudio y materia

Institución
CMP 101
Grado
CMP 101

Información del documento

Subido en
1 de septiembre de 2024
Número de páginas
26
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
hurryben
3.0
(1)

Conoce al vendedor

Seller avatar
hurryben Harvard University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
12
Miembro desde
2 año
Número de seguidores
5
Documentos
1808
Última venta
11 meses hace

3.0

1 reseñas

5
0
4
0
3
1
2
0
1
0

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes