Examen

Erosion and Sediment Control exam questions with 100- correct answers

Document preview thumbnail
Vista previa 4 fuera de 38 páginas

Erosion and Sediment Control exam questions with 100- correct answers

Vista previa del contenido

Erosion and Sediment
Control exam questions with
100% correct answers

Minimum Standard 1 - answer Stabilization


permanent or temporary soil stabilization shall be
applied to denuded areas within seven days after
final grade is reached on any portion of the site;
temporary soil stabilization shall be applied within
seven days to denuded areas that may not be at
final grade but will remain dormant for longer than
14 days; permanent stabilization shall be applied
to areas that are to be left dormant for more than
one year


Site NOT at Final Grade - answer - stabilize in 14
days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


Site at Final Grade - answer - stabilize in 7 days
(recommended immediately)
- permanently or temporarily seed and mulch

,- mulch/matting/straw


Minimum Standard 2 - answer Stock Piles, Waste
and Borrow Areas


during construction, soil stock piles and borrow
areas shall be stabilized or protected with
sediment trapping measures


mulch prevents erosion by protecting the surface
from raindrop impact and silt fence intercepts and
detains from disturbed areas


Minimum Standard 3 - answer Permanent
Vegetation


permanent vegetation cover shall be established
on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be
considered established until a ground cover is
achieved that is uniform, mature enough to
survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from
disturbed area

,this is the standard used to verify that a site is
ready for release of bonds or surety


Minimum Standard 4 - answer First-Step Measures


Sediment basins and traps, perimeter dikes,
sediment barriers and other measures intended to
trap sediment shall be constructed as a first step
in any land-disturbing activity and shall be made
functional before upslope land disturbance takes
place


a certain amount of initial land disturbance may be
required to provide access for equipment to install
the perimeter controls, but site clearing and
grading should be kept to a minimum until the
perimeter controls are in place


intercepts and detains small amounts of sediment
from disturbed areas during construction operation
to prevent sediment from leaving the site and
decrease velocity of sheet flows and low-to-
moderate level channel flow


Perimeter Controls - answer assures that sediment
does not leave the perimeter of the land-disturbing
area once site clearing, grading, and construction
commences

, Examples: silt fences, sediment traps, sediment
basins, construction entrance, temporary
diversions, diversions


Minimum Standard 5 - answer Earthen Structure
Stabilization


stabilization measures shall be applied to earthen
structures such as dams, dikes, and diversions
immediately after installation


reduce erosion and sedimentation and reduce
damage from sediment and runoff to downstream
or off-site areas


Minimum Standard 6 - answer Traps and Basins


sediment traps and basins shall be designed and
constructed based upon the total drainage area
(not just disturbed area) to be served by the trap
or basin


Sediment Traps - answer minimum storage
capacity shall be 134 cubic yards per acre of
drainage area and shall only control drainage areas
less than 3 acres

Información del documento

Subido en
25 de agosto de 2024
Número de páginas
38
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$16.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GUARANTEEDSUCCESS
4.3
(253)
Vendido
695
Seguidores
314
Artículos
24783
Última venta
22 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes