answers
B. It must be in an area designated as a Restricted Area - .......🔷ANSWERS🔶......✔✔ When
designing a new multi-story government Special Access Program Facility (SAPF), the architect
provided identical drawings for two three-story buildings to the security officer. One drawing is for a
building on the installation to be occupied only by contracting Company X. The other is for the
command headquarters building on the installation.The design reveals floor-to-ceiling windows on
the second floor for the main conference rooms and front office staff. The drawings indicate a
parking lot adjacent to the building separated by a four-foot-wide, handicap-accessible sidewalk. The
architect placed emergency exits and stairwells at each end of the building with door hardware on
the exterior to facilitate access/egress. The floor plans show interior office and conference room
doors with GSA-approved locks and connectivity to the building access control badge system. The
front door drawings indicate a large safety glass key lock entry door with the unit logo and
designation etched in the glass. The single entry door provides access into the building lobby where
visit control staff will greet people and in-process visitors. The plans identify lock boxes to be placed
inside the lobby for visitors and employees to store their electronic digital devices and other
prohibited items. The architect designed an open lobby leading to interior hallways, an elevator and
access to the stairways. He placed the access control system central processing unit (CPU) behind
the visit control desk. Typically, the CPU is located in the dispatch center.
As a result, which of the following is true regarding the placement of the CPU?
A. It may remain in the building lobby because the doors serve as adequate access control.
B. It must be in an area designated as a Restricted Area.
C. It must be in an area designated as a Sensitive Comp
True - .......🔷ANSWERS🔶......✔✔ True or False. Hinge pins that are located on the exterior side of
emergency exit doors in the SAPF must be spot welded or have set screws installed to prevent
removal of the door.
, C. Bollard or berm - .......🔷ANSWERS🔶......✔✔ Which of the following man-made barriers could
be an appropriate measure to impede vehicle passage between the parking lot and the building?
A. Bollard or chain link fence
B. Berm or moat
C. Bollard or berm
D. Berm or chain link fence
The five steps in the DoD risk management model - .......🔷ANSWERS🔶......✔✔ 1. Assess Assets
2. Assess Threats
3. Assess Vulnerabilities
4. Assess Risks
5. Determine Countermeasures
Three core components of the risk assessment process - .......🔷ANSWERS🔶......✔✔ 1. Asset
criticality
2. Threat assessment
3. Vulnerability assessment
Physical security survey - .......🔷ANSWERS🔶......✔✔ A formal, recorded assessment of an
installation's overall security program
Physical security inspection - .......🔷ANSWERS🔶......✔✔ A formal, recorded compliance of
physical procedures and measures implemented by a unit or activity to protect its assets
DoD Component Commanders - .......🔷ANSWERS🔶......✔✔ Who makes the determination of
when physical security surveys and inspections are required?