• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 46 páginas
Examen

SAFe Scrum Master Study Guide 5.0 with Complete Solutions

Document preview thumbnail
Vista previa 4 fuera de 46 páginas

SAFe Scrum Master Study Guide 5.0 with Complete Solutions Agile frameworks - ️️ SAFe Scrum Crystal Kanban eXtreme Programming (XP) Feature-driven development What does a Scrum Master do? - ️️ - Servant leaders and coaches for an Agile Team. - Help educate team in Scrum, XP, Kanban and SAFe, ensuring the agreed Agile process is being followed. - Help remove impediments and foster an environment for high-performing team dynamics, continuous flow and relentless improvement. - Facilitates team events - Works with RTE to ensure train meets PI objectives - Fosters normalized estimating within the team - Assists the PO in backlog for PI and IP. ©PREP4EXAMS@2024/2025 [REAL-EXAM-DUMPS] Sunday, August 4, 2024 12:41 AM WEST VIRGINIA UNIVERSIRTY- (WV) : 26506 2 - Attends scrum of scrum meetings. Scrum Master Responsibilities - ️️ Exhibits lean-agile leadership Supports the team rules Facilitates the team's progress toward team goals Leads team efforts in relentless improvement Facilitates meetings Supports the PO Eliminates impediments Promotes SAFe quality practices Builds a high-performing team Protects and communicates Responsibilities on the train Coordinates with other teams Facilitates preparation and readiness for ART events Supports estimating ART - ️️ Agile Release Train ©PREP4EXAMS@2024/2025 [REAL-EXAM-DUMPS] Sunday, August 4, 2024 12:41 AM WEST VIRGINIA UNIVERSIRTY- (WV) : 26506 3 PO - ️️ Product Owner Program Increment (PI) Planning - ️️ A cadence-based, face-to-face event that serves as the heartbeat of the Agile Release Train (ART), aligning all the teams on the ART to a common mission and vision. Innovation and Planning Iteration - ️️ Occurs every PI and serves multiple purposes. It acts as an estimating buffer for meeting PI objectives, as well as providing dedicated time for innovation, continuing education, and PI planning and Inspect and Adapt (I&A) events. Inspect & Adapt (I&A) - ️️ A significant event, held at the end of each PI, where the current state of the solution is demonstrated and evaluated by the train. Teams reflect and identify improvement backlog items via a structured, problem-solving workshop Iteration - ️️ A basic building block of Agile development. Each is a standard, fixed- length timebox, where Agile Teams deliver incremental value in the form of working, tested software and systems. Cycle - Defines, builds, integrates, & test. What is the recommended timebox duration for an Iteration? - ️️ 2 week

Vista previa del contenido

©PREP4EXAMS@2024/2025 [REAL-EXAM-DUMPS] Sunday, August 4, 2024 12:41 AM



WEST VIRGINIA UNIVERSIRTY- (WV) : 26506

SAFe Scrum Master Study Guide 5.0 with Complete Solutions


Agile frameworks - ✔️✔️SAFe


Scrum


Crystal


Kanban


eXtreme Programming (XP)


Feature-driven development


What does a Scrum Master do? - ✔️✔️- Servant leaders and coaches for an Agile Team.


- Help educate team in Scrum, XP, Kanban and SAFe, ensuring the agreed Agile

process is being followed.


- Help remove impediments and foster an environment for high-performing team

dynamics, continuous flow and relentless improvement.


- Facilitates team events


- Works with RTE to ensure train meets PI objectives


- Fosters normalized estimating within the team


- Assists the PO in backlog for PI and IP.



1

,©PREP4EXAMS@2024/2025 [REAL-EXAM-DUMPS] Sunday, August 4, 2024 12:41 AM



WEST VIRGINIA UNIVERSIRTY- (WV) : 26506
- Attends scrum of scrum meetings.


Scrum Master Responsibilities - ✔️✔️Exhibits lean-agile leadership


Supports the team rules


Facilitates the team's progress toward team goals


Leads team efforts in relentless improvement


Facilitates meetings


Supports the PO


Eliminates impediments


Promotes SAFe quality practices


Builds a high-performing team


Protects and communicates


Responsibilities on the train


Coordinates with other teams


Facilitates preparation and readiness for ART events


Supports estimating


ART - ✔️✔️Agile Release Train




2

,©PREP4EXAMS@2024/2025 [REAL-EXAM-DUMPS] Sunday, August 4, 2024 12:41 AM



WEST VIRGINIA UNIVERSIRTY- (WV) : 26506
PO - ✔️✔️Product Owner


Program Increment (PI) Planning - ✔️✔️A cadence-based, face-to-face event that serves

as the heartbeat of the Agile Release Train (ART), aligning all the teams on the ART to

a common mission and vision.


Innovation and Planning Iteration - ✔️✔️Occurs every PI and serves multiple purposes. It

acts as an estimating buffer for meeting PI objectives, as well as providing dedicated

time for innovation, continuing education, and PI planning and Inspect and Adapt (I&A)

events.


Inspect & Adapt (I&A) - ✔️✔️A significant event, held at the end of each PI, where the

current state of the solution is demonstrated and evaluated by the train. Teams reflect

and identify improvement backlog items via a structured, problem-solving workshop


Iteration - ✔️✔️A basic building block of Agile development. Each is a standard, fixed-

length timebox, where Agile Teams deliver incremental value in the form of working,

tested software and systems.




Cycle - Defines, builds, integrates, & test.


What is the recommended timebox duration for an Iteration? - ✔️✔️2 weeks; however, 1-

4 weeks is acceptable, depending on the business context.




3

, ©PREP4EXAMS@2024/2025 [REAL-EXAM-DUMPS] Sunday, August 4, 2024 12:41 AM



WEST VIRGINIA UNIVERSIRTY- (WV) : 26506
Who participates in the Inspect & Adapt (I&A) phase? - ✔️✔️All stakeholders, including:


1. The Agile Teams


2. Release Train Engineer (RTE)


3. System and Solution Architect Engineering


4. Product Management, Business Owners, and others on the Train


What results from the I&A phase? - ✔️✔️Improvement backlog items that go to the

Program Backlog for the next PI Planning event


3 parts of I&A - ✔️✔️PI System Demo


Quantitative Measurement


Retrospective and Problem-Solving Workshop


Purpose of PI System Demo - ✔️✔️To show all the Features the ART has developed

over the course of the PI


Leads: PM, PO, System Team


Attend: BO, Stakehlders, PM, RTE, SM & Teams


PI System Demo Timebox - ✔️✔️~1 hr or less


What is one primary measurement to be considered in quantitative metrics? -

✔️✔️Program predictability measure



4

Información del documento

Subido en
15 de agosto de 2024
Número de páginas
46
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
OliviaWest
2.7
(23)
Vendido
119
Seguidores
17
Artículos
8334
Última venta
4 meses hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes