What is Lean Six Sigma? - answer-- It is the network of activities that support the efforts to continually improve on all aspects of the organization, in conjunction with standard accounting practices that demonstrate the impact of continual improvement and variation reduction on the organizations bottom line.
- It is a structure and disciplined process designed to deliver perfect products and services on a consistent basis. Aims at improving the bottling line by finding and eliminating the causes of mistakes and defects in business processes.
Why do we need LSS? - answer-- To continuously improve the processes to control quality and measure the success of such quality and process in order to satisfy the customer in the least amount of money possible in order to improve the bottom line.
What does DMAIC stand for? - answer-Define, Measure, Analyze, Improve, Control
What is a variation? - answer-Change in data, function caused by one of four factors
What are the three causes of a variable? - answer-Special Causes, Common Causes, tampering or Structural
Who is Walter Stewart? - answer-Creator of the Statistical Quality Control, Brought together the economical, statistical and engineering disciplines.
Who is W. Edward Deming? - answer-Toyota Model and known as the creator of modern LSS methods. Ford hired him after the 1980's collapse of the US Automotive in the Market.
DMAIC - What does Define mean? - answer-Define the process that is to be improved
The process improvement goals that are consistent with customer demands and company strategy.
DMAIC - What does Measure mean? - answer-Define the baseline for current process
Where you collect the data using a data collection plan
DMAIC - What does Analyze mean? - answer-Identify gaps between current performance and goal performance
Root-cause analysis - in order to brainstorm what is the difference between cause and effects
Identify sources of variation
DMAIC -What does Improve mean? - answer-Optimize the process based upon the analysis using techniques like Design of Experiments
DMAIC - What does Control mean? - answer-Set-up pilot runs to establish process capability. Transition to production and thereafter continuously measure the process and institute control mechanisms to ensure that variances ae corrected before they result in defects
What does DMADV stand for? - answer-Define, Measure, Analyze, Design, Verify
What is a DMADV used for? - answer-Focused on customer satisfaction, process is not established
What is a DMAIC used for? - answer-Process improvement, Process has been created and is used to identify and eliminate waste
DMADV - What does Define mean? - answer-The end product or services as needed by the customer
DMADV - What does Measure mean? - answer-Establish the customer's needs and specification
DMADV - What does Analyze mean? - answer-Identify various options that may meet or exceed customer needs
DMADV - What does Design mean? - answer-Create the new process to meet customer needs
DMADV - What does Verify mean? - answer-Confirm the new design to ensure that the process meets customer needs
Define Lean? - answer-Producing the max amount of sellable products or services at the lowest operational cost while optimizing inventory levels.
What are the three concepts of lean? - answer-Value, Waste, Process of creating waste without waste
In lean, define Value? - answer-Defined by the customer based on their perception of the usefulness and necessity of a given product or service.
In lean, define Waste? - answer-Over Production and Inventory
In lean, define Process of creating value without waste? - answer-Testing a product for function.
This process may add a bit of time for the customer but it assures the customer is getting a high quality product
What are the three activities in a value stream? - answer-Value Added, Non-value Added, Business Value Added
Define Value Added activities? - answer-arts of the process that add worth from the perspective or the external customer
Define non-value added activities? - answer-Any activity that consumes resources and produces no added value to the product or service
Define business value added activities? - answer-Required waste for a business
Three concepts of Value Stream? - answer-Flow of Materials, Inputs to Outputs, Flow of Information
Define the Flow of Materials? - answer-Material flows from supplier and is transported from Supplier to Organization
The transformation of raw materials into finished goods
Define Inputs to Outputs? - answer-The flow of information required to support the flow of material and transformation of goods and services
Define the flow of information? - answer-Creating and sending a purchase order to the supplier, Shipping notice
Value Stream Mapping? - answer-Simple graphics and icons to illustrate the movement of material and information. Helps uncover hidden wastes within an organization.
What are the 7 types of waste? - answer-Overproduction, Excess Motion, Waiting, Inventory, Excess movement of material, Defect Correction, Excess processing
What is the theory of constraints? - answer-Weakest link in the chain
What are the six approaches to the theory of constraints? - answer-System Approach, Identify, Exploit, Subordinate, Elevate, Repeat
What does the system approach mean in the theory of constraints? - answer-Trusting the system to do its job
What does identify mean in the theory of constraints? - answer-Find the process that limits the effectiveness of the system
What does exploit mean in the theory of constraints? - answer-Decide how to make the weakest link work as effectively as possible
What does elevate mean in the theory of constraints? - answer-If the system needs upgrading, it may need and extensive revision
What does repeat mean in the theory of constraints? - answer-As the constraint becomes stronger and is no longer the constraint, these steps can be performed on the newly formed constraint.
What are the 5S's? - answer-Sort, straighten, shine, standardize, Sustain
What is a visual factory? - answer-Provides visual cues and communication tools to impart information visually
What is a Kaizen? - answer-a gradual unending improvement by doing little things better and setting/achieving increasingly higher standards. Takes time - continuously improving
What is Kaizen Event? - answer-Breakthrough improvement in short time span - Small impactful group for 3-5 days
What is a Poke Yoke? - answer-Japanese term that means mistake proofing. A device that one prevents incorrect parts from being made or assembled or easily identifies a flaw or error.
What is standard work? - answer-All jobs are organized around human motion to create an efficient sequence without waste
What is Total Productive Maintenance? - answer-Series of methods to ensure every machine in a production process is always able to perform its required task so production is never interrupted
What is a Pull System or a Kanban? - answer-Supplier activities dictated by actual customer requirements and scheduling based on customer orders and usage. Materials "Pulled" through the supplier's processes by actual customer demand.
Who and What is an executive sponsor? - answer-High ranking in organization. Direct And set priorities for Organization
Who and what is a champion? - answer-o Business Leader who ensures resources are available
o Identify And select project and black belts for projects
Who and what is a process owner? - answer-o Person who coordinates various functions and work activities at all levels of a process. Authority to change process and mange's entire process throughout.
Can be Sponsor or Champion
Who and what is a MBB? - answer-Stands for Master Black Belt - Six Sigma Expert responsible for strategic implementations in an organization. Qualified to teach other six sigma facilitators the methods and application in all functions. Resource for using statistical process control in processes
Who and what is a black belt? - answer-Full time team leader responsible for implementing process improvement projects within a business to drive up customer satisfaction and productivity levels.
Who and what is a green belt? - answer-o Part-time or full-time job who has been trained in six sigma improvement methods
Assist black belts in functional area
What does SME stand for? - answer-Subject Matter Expert
What is a process? - answer-A set of interrelated work activities characterized by a set of specific inputs and value added tasks that make up a procedure for a set of specific outputs.
Always will be an input and an output to a process
What are the 7 M's of process inputs? - answer-Man, material, methods, mother nature, management, measurement system
Define he AS-IS Process Mapping? - answer-Capture the current state
Define Value Stream? - answer-All activities, both value added and non-value added, required to bring a product from raw material state, into the hands of the customer, bring a customer requirement from order to delivery and bring a design from concept to launch
Define Project Management? - answer-Application of knowledge, skills, tools, and techniques to a broad range of activities to meet the requirements of a particular project
Difference between LSS and Project Management? - answer-LSS has a defined problem while Project management is the work of finishing a project in a timely and cost saving manner
Difference between Project Management and Program Management? - answer-Temporary vs. Permanent
Short term vs Long Term
What is difference between Project Management and Lean Six Sigma? - answer-Project management focuses on Time while LSS focuses on Quality
What is the difference between project management and process management? - answer-Process is not as large as project. Process focuses on one field while projects can take on multiple task.
Wha
Vista previa del contenido
LEAN SIX SIGMA QUIZ
What is Lean Six Sigma? - answer-- It is the network of activities that support the efforts
to continually improve on all aspects of the organization, in conjunction with standard
accounting practices that demonstrate the impact of continual improvement and
variation reduction on the organizations bottom line.
- It is a structure and disciplined process designed to deliver perfect products and
services on a consistent basis. Aims at improving the bottling line by finding and
eliminating the causes of mistakes and defects in business processes.
Why do we need LSS? - answer-- To continuously improve the processes to control
quality and measure the success of such quality and process in order to satisfy the
customer in the least amount of money possible in order to improve the bottom line.
What does DMAIC stand for? - answer-Define, Measure, Analyze, Improve, Control
What is a variation? - answer-Change in data, function caused by one of four factors
What are the three causes of a variable? - answer-Special Causes, Common Causes,
tampering or Structural
Who is Walter Stewart? - answer-Creator of the Statistical Quality Control, Brought
together the economical, statistical and engineering disciplines.
Who is W. Edward Deming? - answer-Toyota Model and known as the creator of
modern LSS methods. Ford hired him after the 1980's collapse of the US Automotive in
the Market.
DMAIC - What does Define mean? - answer-Define the process that is to be improved
The process improvement goals that are consistent with customer demands and
company strategy.
DMAIC - What does Measure mean? - answer-Define the baseline for current process
Where you collect the data using a data collection plan
DMAIC - What does Analyze mean? - answer-Identify gaps between current
performance and goal performance
Root-cause analysis - in order to brainstorm what is the difference between cause and
effects
Identify sources of variation
DMAIC -What does Improve mean? - answer-Optimize the process based upon the
analysis using techniques like Design of Experiments
DMAIC - What does Control mean? - answer-Set-up pilot runs to establish process
capability. Transition to production and thereafter continuously measure the process
, and institute control mechanisms to ensure that variances ae corrected before they
result in defects
What does DMADV stand for? - answer-Define, Measure, Analyze, Design, Verify
What is a DMADV used for? - answer-Focused on customer satisfaction, process is not
established
What is a DMAIC used for? - answer-Process improvement, Process has been created
and is used to identify and eliminate waste
DMADV - What does Define mean? - answer-The end product or services as needed by
the customer
DMADV - What does Measure mean? - answer-Establish the customer's needs and
specification
DMADV - What does Analyze mean? - answer-Identify various options that may meet or
exceed customer needs
DMADV - What does Design mean? - answer-Create the new process to meet
customer needs
DMADV - What does Verify mean? - answer-Confirm the new design to ensure that the
process meets customer needs
Define Lean? - answer-Producing the max amount of sellable products or services at
the lowest operational cost while optimizing inventory levels.
What are the three concepts of lean? - answer-Value, Waste, Process of creating waste
without waste
In lean, define Value? - answer-Defined by the customer based on their perception of
the usefulness and necessity of a given product or service.
In lean, define Waste? - answer-Over Production and Inventory
In lean, define Process of creating value without waste? - answer-Testing a product for
function.
This process may add a bit of time for the customer but it assures the customer is
getting a high quality product
What are the three activities in a value stream? - answer-Value Added, Non-value
Added, Business Value Added