Project methodology of six sigma. Used for projects into creating new product or process designs.
DMAIC - answer-Define-trying to accomplish what
Measure-where should we focus
Analyze-what are root causes
Improve-what solutions to use
Control-what controls do we need to sustain performance
A six-sigma process: define, measure, analyze, improve, and control. Used for projects in and improving in existing business process.
DOE - answer-dyspnea on exertion
DPO - answer-defects per opportunity or (DPU)/(total defect opportunities)
DPMO - answer-defects per million opportunities
FMEA - answer-Failure Mode and Effects Analysis. (Risk analysis). Useful tool for evaluating potential solutions. Failure modes or problems are anticipated for each best potential solution and there six predicted. Each problem is that evaluated in terms of severity of the problem, how frequently the problem will occur, and how Easley the problem can be detective.
DVF model - answer-Dissatisfaction x vision x first steps resistance.
Dissatisfaction with the current situation: pain,threat current performance service gaps must be shared but not everyone has the same dissatisfaction.
Vision of a positive, compelling future state: clearly stated and understandable to everyone, consistent, ennobling, challenging, accessible.
First steps in the direction of the vision: Practical plan with attainable steps. How we might behave with one another. Communicated.
Resistance to change: always present when change occurs.
PDCA - answer-A continuous improvement model of plan, do, check, act.
PDSA - answer-Plan
Do
Study
Act
A four step method to test an improvement or innovation idea
SDSA - answer-Standardize, do, study, act
SIPOC - answer-Suppliers, Inputs, Process, Outputs, Customers. A diagram that depicts high-level critical information about a process on one page.
Hansei - answer-A Japanese word meaning reflection.
Ideal Performance Level - answer-The ultimate or ideal level of performance
Operational Definition - answer-Definition of a word or concept everyone understands. To ensure there is consistency in collection and interpretation of data
Process Control Plan - answer-The premiere tool for standardizing, managing, and improving work processes and procedures. Usually consists of a process flowchart, list of measures, data collection details and a contingency or response plan.
Rapid Test of Change - answer-Occurs when at least two iteration of the PDSA ( plan, duty, study, act) Cycle have been conducted in a one-week time period to text a localized improvement idea within a work unit
Six Sigma - answer-Organized parallel-meso structure to reduce variation in organizational processes by using improvement specialists, a structured method and performance metrics with the aim of achieving strategic objectives.
Disciplined, data-driven approach and methodology for eliminating defects. Developed by Jack Welch, By Motorola six to improve the quality of process outputs by identifying and removing causes of defects/errors and minimizing variability in manufacturing in business processes. Each six Sigma project carried out within an organization follows a defined sequence of steps and has qualified financial targets. Cost reduction and/or profit increase. Six sigma doctor in asserts that continuous efforts to achieve a stable and predictable process results are vital importance to business success. Manufacturing and business processes have characteristics that can be measured analyzed improved and control. Achieving sustained quality improvement requires commitment from the entire organization.
Features that fat six Sigma a part from previous quality improvement initiatives include a clear focus on achieving measurable and quantifiable financial returns from any six Sigma project. And increased emphasis on strong and passionate management leadership and support. A special infrastructure of champions black belts master black belt green belts to lead and implement a six Sigma approach. A clear commitment to making decisions on the basis of viable data rather than assumptions and guesswork.
Standard - answer-And agreement established for an object, performance, capability, arrangement, state, action, sequence, method, procedure, responsibility, duty, 30, way of thinking. For the purpose of unification and simplification so that profit or convenience maybe obtained with fairness among the people concerned.
Standardization - answer-The systematic activities of establishing and utilizing standards.
Strategy - answer-Areas of focus developed from looking at the data gathered From the project objective of the define step. Strategies are mini project objectives or focus areas.
Target - answer-The level of performance project team is expected to reach by the project deadline. Expected results.
Theoretical Performance Level - answer-The level of performance it is impossible to go beyond without a fundamental breakthrough in knowledge or technology. Also considered the best anyone has done for an extended period of time.
Components of the management system - answer-Leaders better be right bottom of improvement-anyone, anywhere, anytime-hey I have an idea what to do! Continuous improvement in day-to-day operations.
Strategic Planning Items; Mission, vision, values and strategies. Stakeholder needs, strategic objective, Key processes, organizational performance dashboard.
Strategic improvement cycle; build/revise project portfolio, execute portfolio projects, conduct portfolio review, repeat.
Six types of projects of Six Sigma - answer-1. Quick hit-implement an obvious action immediately
2. Rapid Action-identify a small scope solution during several working sessions and manage implementation. Designing, improving or standardizing
3. Lean Project- improve the capability of a process work area or flow to create distinctive value for customers by identifying and eliminating waste
4. Design Project-design or radically redesign a system, process, product, or service
5. Discovery project- thoroughly understand the as is situation and identify strategic issues and opportunities. No idea what to do.
6. Standardization project - create test deploy manage and periodically review standard or a bundle of standards.
7. Improvement project - solve complex organizational problem through the work of a formal team using a structured improvement method like DMAIC
Eight types of waste - answer-Overproduction, waiting, unnecessary transport, excess inventory, overprocessing, unnecessary movement, defects. ( Tim Wood)
Six parts of a project objective - answer-1. Identified process/issue
2. Progress measure
3. Baseline for The progress measure
4. Desired direction for the progress measure
5. Target for the progress measure
6. Deadline for achieving the target
Seven types of brainstorming - answer-Open brainstorming
Silent brainstorming
Structure brainstorming
Reverse brainstorming
Analogy brainstorming
Affinity/relations diagram
10 Prioritization Techniques - answer-1. Vision enabling- does the task help the organization move toward the vision?
2. Triage- the assignment of degrees of urgency to decide the order of treatment
3. Affinity and relations diagrams. Affinity sort opportunities of the groups. Relations follow and track relationships between groups.
4. Ranking
5. Voting
6. Point distribution
7. Decision matrix ( criteria based decision making)
8. Cost/benefit analysis
Vista previa del contenido
SIX SIGMA STUDY GUIDE
Project methodology of six sigma. Used for projects into creating new product or
process designs.
DMAIC - answer-Define-trying to accomplish what
Measure-where should we focus
Analyze-what are root causes
Improve-what solutions to use
Control-what controls do we need to sustain performance
A six-sigma process: define, measure, analyze, improve, and control. Used for projects
in and improving in existing business process.
DOE - answer-dyspnea on exertion
DPO - answer-defects per opportunity or (DPU)/(total defect opportunities)
DPMO - answer-defects per million opportunities
FMEA - answer-Failure Mode and Effects Analysis. (Risk analysis). Useful tool for
evaluating potential solutions. Failure modes or problems are anticipated for each best
potential solution and there six predicted. Each problem is that evaluated in terms of
severity of the problem, how frequently the problem will occur, and how Easley the
problem can be detective.
DVF model - answer-Dissatisfaction x vision x first steps > resistance.
Dissatisfaction with the current situation: pain,threat current performance service gaps
must be shared but not everyone has the same dissatisfaction.
Vision of a positive, compelling future state: clearly stated and understandable to
everyone, consistent, ennobling, challenging, accessible.
First steps in the direction of the vision: Practical plan with attainable steps. How we
might behave with one another. Communicated.
Resistance to change: always present when change occurs.
PDCA - answer-A continuous improvement model of plan, do, check, act.
PDSA - answer-Plan
Do
Study
, Act
A four step method to test an improvement or innovation idea
SDSA - answer-Standardize, do, study, act
SIPOC - answer-Suppliers, Inputs, Process, Outputs, Customers. A diagram that
depicts high-level critical information about a process on one page.
Hansei - answer-A Japanese word meaning reflection.
Ideal Performance Level - answer-The ultimate or ideal level of performance
Operational Definition - answer-Definition of a word or concept everyone understands.
To ensure there is consistency in collection and interpretation of data
Process Control Plan - answer-The premiere tool for standardizing, managing, and
improving work processes and procedures. Usually consists of a process flowchart, list
of measures, data collection details and a contingency or response plan.
Rapid Test of Change - answer-Occurs when at least two iteration of the PDSA ( plan,
duty, study, act) Cycle have been conducted in a one-week time period to text a
localized improvement idea within a work unit
Six Sigma - answer-Organized parallel-meso structure to reduce variation in
organizational processes by using improvement specialists, a structured method and
performance metrics with the aim of achieving strategic objectives.
Disciplined, data-driven approach and methodology for eliminating defects. Developed
by Jack Welch, By Motorola six to improve the quality of process outputs by identifying
and removing causes of defects/errors and minimizing variability in manufacturing in
business processes. Each six Sigma project carried out within an organization follows a
defined sequence of steps and has qualified financial targets. Cost reduction and/or
profit increase. Six sigma doctor in asserts that continuous efforts to achieve a stable
and predictable process results are vital importance to business success. Manufacturing
and business processes have characteristics that can be measured analyzed improved
and control. Achieving sustained quality improvement requires commitment from the
entire organization.
Features that fat six Sigma a part from previous quality improvement initiatives include a
clear focus on achieving measurable and quantifiable financial returns from any six
Sigma project. And increased emphasis on strong and passionate management
leadership and support. A special infrastructure of champions black belts master black
belt green belts to lead and implement a six Sigma approach. A clear commitment to
making decisions on the basis of viable data rather than assumptions and guesswork.