Examen

Amber Book- Professional ( Civil Engineering) Practice (Pcm & Pjm) Study Guide With Complete Solution!!

Document preview thumbnail
Vista previa 3 fuera de 21 páginas

AMBER BOOK- PROFESSIONAL ( CIVIL ENGINEERING) PRACTICE (PCM & PJM) STUDY GUIDE WITH COMPLETE SOLUTION!!

Vista previa del contenido

AMBER BOOK- PROFESSIONAL ( CIVIL ENGINEERING)
PRACTICE (PCM & PJM) STUDY GUIDE WITH COMPLETE
SOLUTION!!
A warranty
Answers :Which poses the most risk for the architect if it is included in his
contract?
Found in a contract prepared by an owner, which of these phrases may void
coverage by the architect's professional liability


Answers :Hold harmless, As required, Indemnification, As necessary
Which building typology is most prone to litigation?


Answers :Condos are particularly risky because occupants have high expectations
and they have a condo association: There are dues, a budget, and often lawyer
living in the building, and serving on the condo board. If there is a problem with
construction, there is an entity already in place to file a lawsuit.
The architect makes a change to the drawings after they have gone out to bid, but
before a contractor has been selected. This is called:


Answers :An Addendum
Which of the following will typically enter a contract with the architect directly?


Answers :Landscape architect,
Civil engineer,
Lighting consultant,
Mechanical/electrical/plumbing (MEP)
Which of the following will typically enter a contract with the architect directly?

,Answers :Typically, the audio/visual consultant, cost estimator, lighting consultant,
and code consultant will enter into a contract directly with the architect.


The Architect is then responsible for the communication, coordination, and
administration of those sub-consultants.


The owner is responsible for the site, contracting both the permitting consultant
and the surveyor.
What are the responsibilities of a geotechnical engineer, but not of a civil engineer?


Answers :Subsurface soil analysis. Geotechnical engineers are a subset of civil
engineers, typically hired by the owner of a site.
Automobile liability insurance, Professional liability insurance, General liability
insurance, Workers compensation insurance


Answers :Which of the following insurance types may be required on AIA
Document B101 (contract between the owner and architect)?
General liability insurance


Answers :Is a basic insurance that covers property damage and injury claims
against the firm, usually with dollar limits on claims or an aggregate limit. It is
sometimes required by the Landlord and covers both legitimate and fraudulent
claims.
Intellectual property insurance


Answers :covers an architect if someone else claims copyright infringement.
Worker's compensation insurance

, Answers :covers a worker who is injured on the job. It provides wage replacement
and medical care cost in exchange for the employee waiving his right to sue the
firm
Intellectual property insurance


Answers :covers an architect if someone else claims copyright infringement.
Business interruption insurance


Answers :pays the architect for expenses and loss of profits if work is interrupted
by something like a fire or flood.
Employment practice liability insurance protects the firm from wrongful
termination lawsuits.


Answers :Which type of insurance protects your firm in a wrongful termination
suit?
Deductible


Answers :You are found negligent for an error in your drawings and ordered to pay
the plaintiff S50.000, Forty thousand dollars of that sum is paid by your coverage,
but everything up to the first $10,000 must be paid by your firm. Your portion is
called "...."
Premium


Answers :is what you pay every month or every six months as a bill to be insured.
Which is the architect responsible for?


Answers :An architect is responsible for Reviewing the contractor's invoice to the
owner. An architect is the representative of the owner and is supposed to act in his
interest, so each month when the contractor sends the owner his invoice, the

Información del documento

Subido en
11 de agosto de 2024
Número de páginas
21
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DistinctionDesk
3.5
(41)
Vendido
227
Seguidores
117
Artículos
2419
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes