2024 PMP Cheat Sheet With complete solution

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

2024 PMP Cheat Sheet With complete solution

Vista previa del contenido

2024 PMP Cheat Sheet With complete
solution
The sequence in finding the root cause of the problem when selecting an answer. -
II II II II II II II II II II II II II II II



Assess/analyze; review; take action
II II II II



(Assess/analyze to ID the root cause, then review the pm plan and documents, then take II II II II II II II II II II II II II II



action.)
II




II ______ might happen, while _________ are occurring/ have occurred. - risks, issues
II II II II II II II II II II II II




You add risks to the _________, not the _________. - risk register, risk management
II II II II II II II II II II II II II II II



plan
II




II What document should you review when there are team issues? - team charter
II II II II II II II II II II II II II




II In ______ the PM assigns work and in _____ team self assigns. - predictive, agile
II II II II II II II II II II II II II II II




II The _______ helps the _______ sort out product backlog. - scrum master, product owner
II II II II II II II II II II II II II II




II In __________ customer feedback is throughout the project. - agile
II II II II II II II II II II




To resolve resource conflicts work with the ____________________. - functional
II II II II II II II II II II II



manager
II




For overall guidance refer to the ______________, for high-level refer to the
II II II II II II II II II II II II



___________. - project management plan, project charter
II II II II II II II II




The best option for a demo; helpful when most requirements are already known -
II II II II II II II II II II II II II II II



prototype
II




What should a new PM assigned to an existing project do? - Continue to monitor before
II II II II II II II II II II II II II II II II II



taking any action.
II II II




II As a new PM to a project is the first thing you should review is ... - Project charter
II II II II II II II II II II II II II II II II II II II




___________ life cycle provides finished deliverables a customer can use immediately ;
II II II II II II II II II II II II



__________ allows feedback for unfinished work; __________ is both iterative and
II II II II II II II II II II II



incremental. - incremental, iterative, agile
II II II II II II




Start and finish dates adjusted based on resource constraints; tasks can be delayed -
II II II II II II II II II II II II II II II



Resource leveling
II II




Used when there's an uneven allocation of resources, after resource leveling, when you
II II II II II II II II II II II II II



have to optimize the resources and CANNOT extend schedule - resource smoothing
II II II II II II II II II II II II II

, II What is the most accurate form of estimating? - bottom-up
II II II II II II II II II II




The most accurate estimating, consists of agreggating estimates of lower-level
II II II II II II II II II II



components of WBS. Is very time consuming. - bottom-up
II II II II II II II II II II




II What is the least accurate form of estimating? - anologous (top-down)
II II II II II II II II II II II




II Less accurate estimating, uses historical data. - anologous (top-down)
II II II II II II II II II




A form of estimating where that is algorithm based on deriving a number. - Parametric
II II II II II II II II II II II II II II II II



estimating
II




Best form of estimating for when there is insufficient historical. data ; commonly uses
II II II II II II II II II II II II II II



triangular or PERT; 3 estimates to define an approx range (most likely, optimistic,
II II II II II II II II II II II II II



pessimistic). - 3 point estimating
II II II II II II




If this is a new project, no experience, with not much reliable data, which form of
II II II II II II II II II II II II II II II II



estimating should you use? - triangular
II II II II II II II




If the team is made of experts, and you need an accurate estimate, which form of
II II II II II II II II II II II II II II II II



estimating should you use? - PERT/beta
II II II II II II II




Performing activities in parallel, may not result in increased cost but may increase risk -
II II II II II II II II II II II II II II II II



Fast tracking
II II




Additional resources are used to shorten schedule, always increases cost, may increase
II II II II II II II II II II II II



risk - Crashing
II II II II




Cost baseline ___________ contingency reserve, _________ management reserves -
II II II II II II II II II II



includes, excludes
II II




II Cost baseline plus management reserves - Project budget
II II II II II II II II




II Contingency reserves are for ___________ risks - identified II II II II II II II II




II Management reserves are for __________ risks - unidentified II II II II II II II II




II For CPI and SPI _____ than 1 is good. and ______ than 1 is bad. - more, less
II II II II II II II II II II II II II II II II II II




II What does it mean if the SPI is less than 1? - behind schedule
II II II II II II II II II II II II II II




II What does it mean if the CPI is less than 1? - over budget
II II II II II II II II II II II II II II




II Formula for CPI? - EV/AC II II II II II

Información del documento

Subido en
11 de agosto de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
STUVEX
3.8
(123)
Vendido
837
Seguidores
314
Artículos
16260
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes