• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 13 páginas
Examen

CCCA Exam With Correct Questions And Answers 2024

Document preview thumbnail
Vista previa 2 fuera de 13 páginas

CCCA Exam With Correct Questions And Answers 2024

Vista previa del contenido

CCCA Exam With Correct Questions And
Answers 2024


Preliminary rProject rDescription rPPD r- rcorrect ranswer.describes rthe rscope rand
rrelationships rof rmajor relements rorganized rin rterms rof rbuilding rsystems rand rcomponents

r- rCSI rrecommends rUniFormat rfor rPPDS r- rdescribes ras ra rsystem rof rcomponents




Outline rspecifications r- rcorrect ranswer.an rabbreviated rset rof rspecification rrequirements
rnormally rincluded rwith rschematic rdesign ror rdesign rdevelopment rdocuments. rBassi rfor

rrevising restimates rof rcost/schedule rvalue r- rRecord rdecisions




shop rdrawing r- rcorrect ranswer.not ra rcontract rdocument r- rrepared rby rcontractor r/
rsub/equipment rsupplier rand rshow rhow ran raspect rof rthe rwork ris rto rbe rfabricated rand

rinstalled




methods rof rspecifying r- rcorrect ranswer.Descriptive, rperformance, rreference rstandards,
rproprietary




Descriptive rSpecification r- rcorrect ranswer.detailed rdescription rof rrequired rproperties rof
rproduct. rA/E rresponsible rfor rdetermination rof rdesired rperformance rcriteria




Performance rSpecifications r- rcorrect ranswer.required rresult rwith rcriteria rfor rverifying
rcompliance




Proprietary rspecifications r- rcorrect ranswer.identify rthe rdesired rmanufacture ror runique
rcharacteristic




closed rvs ropen rproprietary rspecification r- rcorrect ranswer.

Two rtypes rof rbonds r- rcorrect ranswer.performance rbond rand rpayment rbond

When rare rbonds rexpected rto rbe rdelievered? r- rcorrect ranswer.To rthe rowner rwhen rthe
rcontractor rdelivers rthe rexecuted rowner-contractor ragreements




What rare rbonds r- rcorrect ranswer.They rare rnot rinsurance

What rprotects rthe rowner ragainst rmechanics rliens? r- rcorrect ranswer.Payment rbond

, What rprotects rsuppliers rand rsubs ragainst rnonpayment? r- rcorrect ranswer.Payment rbond

Surety rbond r- rcorrect ranswer.AKA rcontract rbond

Performance rBond r- rcorrect ranswer.guaranty rthat rif rthe rcontractor rfails rto rperform, rthe
rsurety rwill reither rcomplete rthe rcontract ror rprovide rsufficient rfunds rup rto rthe rpenalty rsum

rfor rsuch rcompletion




Other rbonds rin raddition rto rperformance rand rpayment rbonds r- rcorrect
ranswer.maintenance rbonds, rlien rbonds, rretainage rbonds r(alternative rto rretainage),

rlicense rand rpermit rbonds r(from rAHJs)




Who ris rresponsible rfor rcoordinating rwork rto rbe rcompleted runder rseparate rcontracts? r-
rcorrect ranswer.Owner




Preliminary rschedules rmust rbe rsubmitted rat rleast r10 rdays rafter rthe reffective rdate rof rthe
rcontract r- rcorrect ranswer.According rto rmany rgeneral rstandard rconditions r-

rConsensusDocs rdoesn't rhave rthis rrequirement




Two rmost rfrequently rused rschedule rformats r- rcorrect ranswer.critical rpath rmethod r(CPM) r
bar rchart

Approval rfor rschedule rby rcontractor r- rcorrect ranswer.A/E rreviews rfor rcompliance rwith
rcontracts r- rOwner rdetermines rif rit rmeets rrequirements r- rIn rsome rcontracts, rschedule

rrevisions rare rallowed ronly rby rchange rorder




Comprehensive rschedule rAKA rproject rschedule r- rcorrect ranswer.often ra rcritical rpath
rschedule rbeginning rwith rthe rinception rof rthe rproject rand rconcludes rwith rfinal racceptance




schedule rof rvalues r- rcorrect ranswer.complements rthe rprogress rschedule r
identifies rhow rall rthe rcosts rint rhe rproject rare rapportioned r

A/E rcan rrequest rsupporting rdocumentation rfrom rcontractor rwhen rthee ris ra rdisagreement
ron rthe rproportionate rvalue rof ritems rof rwork r




Change rorders rare rusually radded rto rschedule rof rvalues

What rrecords rdoes rthe rA/E rmaintain? r- rcorrect ranswer.field robservation rreports
documentation rof rnon-confirming rwork r
correspondence r
meeting rminutes r
communication rreports r
submittals r
test rreports
payment rrequests rand rcertifications r
schedule r

Información del documento

Subido en
5 de agosto de 2024
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
RANKGRADES
3.8
(22)
Vendido
93
Seguidores
16
Artículos
4797
Última venta
2 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes