• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 18 páginas
Examen

CCCA Exam Questions & Answers 2024/2025

Document preview thumbnail
Vista previa 3 fuera de 18 páginas

CCCA Exam Questions & Answers 2024/2025 Preliminary Project Description PPD - ANSWERSdescribes the scope and relationships of major elements organized in terms of building systems and components - CSI recommends UniFormat for PPDS - describes as a system of components Outline specifications - ANSWERSan abbreviated set of specification requirements normally included with schematic design or design development documents. Bassi for revising estimates of cost/schedule value - Record decisions shop drawing - ANSWERSnot a contract document - repared by contractor / sub/equipment supplier and show how an aspect of the work is to be fabricated and installed methods of specifying - ANSWERSDescriptive, performance, reference standards, proprietary Descriptive Specification - ANSWERSdetailed description of required properties of product. A/E responsible for determination of desired performance criteria Performance Specifications - ANSWERSrequired result with criteria for verifying compliance Proprietary specifications - ANSWERSidentify the desired manufacture or unique characteristic closed vs open proprietary specification - ANSWERS Two types of bonds - ANSWERSperformance bond and payment bond When are bonds expected to be delievered? - ANSWERSTo the owner when the contractor delivers the executed owner-contractor agreements

Vista previa del contenido

CCCA Exam Questions & Answers
2024/2025

Preliminary Project Description PPD - ANSWERSdescribes the scope and relationships of major elements
organized in terms of building systems and components - CSI recommends UniFormat for PPDS -
describes as a system of components



Outline specifications - ANSWERSan abbreviated set of specification requirements normally included
with schematic design or design development documents. Bassi for revising estimates of cost/schedule
value - Record decisions



shop drawing - ANSWERSnot a contract document - repared by contractor / sub/equipment supplier and
show how an aspect of the work is to be fabricated and installed



methods of specifying - ANSWERSDescriptive, performance, reference standards, proprietary



Descriptive Specification - ANSWERSdetailed description of required properties of product. A/E
responsible for determination of desired performance criteria



Performance Specifications - ANSWERSrequired result with criteria for verifying compliance



Proprietary specifications - ANSWERSidentify the desired manufacture or unique characteristic



closed vs open proprietary specification - ANSWERS



Two types of bonds - ANSWERSperformance bond and payment bond



When are bonds expected to be delievered? - ANSWERSTo the owner when the contractor delivers the
executed owner-contractor agreements

,What are bonds - ANSWERSThey are not insurance



What protects the owner against mechanics liens? - ANSWERSPayment bond



What protects suppliers and subs against nonpayment? - ANSWERSPayment bond



Surety bond - ANSWERSAKA contract bond



Performance Bond - ANSWERSguaranty that if the contractor fails to perform, the surety will either
complete the contract or provide sufficient funds up to the penalty sum for such completion



Other bonds in addition to performance and payment bonds - ANSWERSmaintenance bonds, lien bonds,
retainage bonds (alternative to retainage), license and permit bonds (from AHJs)



Who is responsible for coordinating work to be completed under separate contracts? - ANSWERSOwner



Preliminary schedules must be submitted at least 10 days after the effective date of the contract -
ANSWERSAccording to many general standard conditions - ConsensusDocs doesn't have this
requirement



Two most frequently used schedule formats - ANSWERScritical path method (CPM)

bar chart



Approval for schedule by contractor - ANSWERSA/E reviews for compliance with contracts - Owner
determines if it meets requirements - In some contracts, schedule revisions are allowed only by change
order



Comprehensive schedule AKA project schedule - ANSWERSoften a critical path schedule beginning with
the inception of the project and concludes with final acceptance



schedule of values - ANSWERScomplements the progress schedule

, identifies how all the costs int he project are apportioned



A/E can request supporting documentation from contractor when thee is a disagreement on the
proportionate value of items of work



Change orders are usually added to schedule of values



What records does the A/E maintain? - ANSWERSfield observation reports

documentation of non-confirming work

correspondence

meeting minutes

communication reports

submittals

test reports

payment requests and certifications

schedule

requests for interpretation, clarification or information

proposal requests or change order requests

contract document modifications



Submittal Log - ANSWERSshould be maintained by both the A/E and contractor

should have specification section reference

dates

action taken (approve, approved as noted, revise/resubmit, rejected,resubmit,no action,not requried for
review)



Daily log - ANSWERSwork performed, delivery of products, construction problems/remedies,
documentation of delays, observation of nonconforming work, visitors to the site, inspections
performed, test take, signature and date

Información del documento

Subido en
3 de agosto de 2024
Número de páginas
18
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$8.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Bensuda
3.7
(166)
Vendido
915
Seguidores
445
Artículos
23071
Última venta
2 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes